Godrej & Boyce Manufacturing
Proud winner of ABECA 2024 - AmbitionBox Employee Choice Awards
Filter interviews by
I applied via Naukri.com and was interviewed in Feb 2023. There were 3 interview rounds.
I applied via Approached by Company and was interviewed in Jul 2022. There were 4 interview rounds.
Standard Aptitude Questions of Class 10.
English Paragraph Study and Q&A on English Language.
I applied via Walk-in and was interviewed in Sep 2022. There were 2 interview rounds.
I applied via Recruitment Consulltant and was interviewed before May 2023. There were 2 interview rounds.
General questions related to general knowledge
I have designed multiple press tool dies, including those for automotive parts and household appliances.
Designed press tool die for automotive door panels
Designed press tool die for household appliance components
Implemented innovative features to improve efficiency and accuracy
The number of days required for designing a draw die can vary depending on the complexity of the design and the experience of the designer.
The time required can range from a few days to several weeks, or even months.
Factors such as the size, complexity, and precision of the draw die will impact the design time.
Experienced designers may be able to complete the design more quickly than those with less experience.
Collabor...
Components in draw die include die block, die plate, punch, and binder.
Die block: main component that holds the die plate and provides support for the punch
Die plate: contains the cavity that shapes the material being drawn
Punch: used to push the material through the die plate
Binder: surrounds the die cavity to control material flow and prevent wrinkling
Constructing draw die involves designing and manufacturing a tool used in metal forming processes.
Design the die according to the desired shape and dimensions of the final product.
Select appropriate materials for the die based on the type of metal being formed.
Manufacture the die using CNC machining or other precision manufacturing techniques.
Test the die with sample materials to ensure it produces accurate and consist...
Godrej & Boyce Manufacturing interview questions for popular designations
I applied via Company Website and was interviewed before Apr 2023. There was 1 interview round.
Thermal expansion affects PDC and press tool manufacturing due to Young's modulus.
Thermal expansion can cause dimensional changes in materials during manufacturing processes.
Young's modulus is a measure of a material's stiffness and resistance to deformation.
PDC (Polycrystalline Diamond Compact) is a material commonly used in cutting tools due to its hardness and wear resistance.
Press tools are used in metal forming pr...
The best simulation of shrinkage in thermal expansion of casting is achieved through finite element analysis (FEA).
Finite Element Analysis (FEA) is commonly used to simulate shrinkage in thermal expansion of casting.
FEA software allows for accurate prediction of shrinkage and deformation during the casting process.
By inputting material properties, boundary conditions, and thermal gradients, FEA can provide valuable ins...
To correct casting thickness within a model, adjust the design parameters and re-run simulations.
Modify the CAD model to adjust the thickness of the casting.
Update the material properties and casting parameters in the simulation software.
Run simulations to analyze the effects of the changes on the casting quality.
Iterate the process until the desired casting thickness is achieved.
Consult with design engineers and casti
Flow rate can be calculated by dividing the volume of fluid passing through a pipe or channel by the time it takes to pass.
Flow rate = Volume / Time
Units of flow rate are typically liters per minute (L/min) or cubic meters per second (m^3/s)
Flow rate can be measured using flow meters or calculated based on known parameters such as pipe diameter and fluid velocity
To change trim line within a process, you need to adjust the setpoint of the control system.
Access the control system interface
Locate the trim line parameter
Adjust the setpoint to change the trim line
Monitor the process to ensure the trim line is functioning correctly
Mold temperature depends on various factors such as material type, cooling system, injection speed, and mold design.
Material type: Different materials require different mold temperatures for optimal results.
Cooling system: The efficiency of the cooling system affects the mold temperature.
Injection speed: Faster injection speeds may require higher mold temperatures to prevent defects.
Mold design: The design of the mold ...
To increase molten metal pressure in casting area, adjust the pouring rate, increase the height of the pouring basin, and use a pressurized system.
Adjust the pouring rate to control the flow of molten metal into the casting area.
Increase the height of the pouring basin to create more pressure when the metal is poured.
Use a pressurized system such as a vacuum or pressure casting method to increase the pressure of the mo
Get interview-ready with Top Godrej & Boyce Manufacturing Interview Questions
I applied via Campus Placement and was interviewed before Jul 2023. There were 2 interview rounds.
It was a common aptitude test followed by psychometric test.
I appeared for an interview before Mar 2024, where I was asked the following questions.
I applied via Approached by Company and was interviewed before Mar 2023. There were 2 interview rounds.
20 min with general questions. If you know all the formulae of aptitude and logical reasoning and you are good with fast calculation, then this round is easy to crack. Just understand all the basic formula from RS Agarwal or any general books.
The interview questions cover topics related to hydraulic systems, engines, bearings, lubrication, and pumps.
1. The gas inside a hydraulic accumulator is typically nitrogen, which is used to store energy in the form of compressed gas.
2. Proportional valves control flow rate based on an input signal, while servo valves control flow rate based on feedback from a sensor.
3. Diesel engines use compression ignition, while pe...
I applied via Job Portal and was interviewed in May 2022. There were 4 interview rounds.
Very good aptitude test in good time frame
I applied via Referral and was interviewed before Apr 2023. There were 2 interview rounds.
Basic mechanical engineering questions
Top trending discussions
Some of the top questions asked at the Godrej & Boyce Manufacturing interview for experienced candidates -
The duration of Godrej & Boyce Manufacturing interview process can vary, but typically it takes about less than 2 weeks to complete.
based on 46 interviews
Interview experience
based on 3.2k reviews
Rating in categories
Assistant Manager
1.6k
salaries
| ₹4.4 L/yr - ₹12.3 L/yr |
Deputy Manager
847
salaries
| ₹5 L/yr - ₹15 L/yr |
Manager
363
salaries
| ₹7.7 L/yr - ₹24 L/yr |
Senior Manager
219
salaries
| ₹9.4 L/yr - ₹27 L/yr |
Senior Executive
211
salaries
| ₹3 L/yr - ₹9.4 L/yr |
Vivo
OPPO
Dell
LG Electronics