Filter interviews by
Be the first one to contribute and help others!
posted on 3 Apr 2021
I appeared for an interview in Mar 2021.
I applied via Recruitment Consultant and was interviewed in Nov 2020. There was 1 interview round.
I have prepared various official documents including reports, proposals, contracts, and presentations.
Reports on company performance and financial analysis
Proposals for new business ventures and partnerships
Contracts for clients and vendors
Presentations for board meetings and conferences
posted on 25 Mar 2022
I applied via Approached by Company and was interviewed in Sep 2021. There was 1 interview round.
posted on 24 Mar 2023
I applied via Newspaper Ad and was interviewed before Mar 2022. There were 3 interview rounds.
I applied via Job Portal and was interviewed in Mar 2023. There was 1 interview round.
posted on 24 Jan 2023
I applied via Walk-in and was interviewed in Jul 2022. There were 3 interview rounds.
Shuttering quantity can be calculated by determining the surface area of the formwork and multiplying it by the depth of the concrete.
Measure the length and width of the formwork
Calculate the surface area by multiplying the length and width
Multiply the surface area by the depth of the concrete to get the shuttering quantity
Account for any additional formwork needed for corners or edges
Steel quantity can be calculated by using the formula: (D^2/162) x Length of steel
Determine the diameter of the steel
Calculate the length of the steel required
Use the formula (D^2/162) x Length of steel to calculate the steel quantity
Consider wastage and additional steel required for overlaps and joints
Initial setting time is the time taken by cement to harden to a certain degree.
Initial setting time is the time taken by cement to harden to a certain degree.
It is the time elapsed between the moment water is added to the cement and the time when the paste starts losing its plasticity.
The initial setting time of cement is generally around 30 minutes to 1 hour.
It is an important property of cement as it determines the t...
Lapping provides a smooth surface finish to the column.
Clean the column thoroughly before lapping.
Apply a lapping compound to the column surface.
Use a lapping tool to rotate and move up and down the column.
Continue lapping until the desired surface finish is achieved.
Clean the column again after lapping to remove any residue.
Density of RCC is around 2500 kg/m3 and PCC is around 2400 kg/m3.
RCC stands for Reinforced Cement Concrete and PCC stands for Plain Cement Concrete.
Density of RCC depends on the mix design and the type of aggregates used.
Density of PCC is lower than RCC due to absence of reinforcement.
Density of concrete is an important factor in determining its strength and durability.
OPC is Ordinary Portland Cement while PPC is Portland Pozzolana Cement.
OPC is made from raw materials like limestone and clay while PPC is made from a mixture of pozzolanic material and OPC.
PPC has higher durability and strength compared to OPC.
PPC is more eco-friendly as it uses industrial waste as a raw material.
OPC is commonly used for construction of buildings and bridges while PPC is used for marine structures, hy...
The density of sand, water, and aggregate varies depending on their composition and temperature.
The density of sand ranges from 1300 to 1700 kg/m³.
The density of water is 1000 kg/m³ at 4°C.
The density of aggregate varies depending on its size and composition.
The density of fine aggregate ranges from 1600 to 1800 kg/m³.
The density of coarse aggregate ranges from 1200 to 1500 kg/m³.
Clear cover provides protection and visibility.
Clear cover protects the item from dust, dirt, and damage.
Clear cover allows the item to be visible without removing the cover.
Clear cover is commonly used for electronic devices, books, and documents.
posted on 25 Apr 2024
I applied via Naukri.com and was interviewed in Nov 2023. There were 2 interview rounds.
posted on 26 Jun 2023
posted on 10 Oct 2021
I applied via Company Website and was interviewed in Apr 2021. There were 3 interview rounds.
posted on 21 Nov 2023
I applied via Walk-in and was interviewed before Nov 2022. There were 3 interview rounds.
I was responsible for leading a team of sales professionals to achieve revenue targets and develop new business opportunities.
Led a team of sales professionals to achieve revenue targets
Developed new business opportunities through strategic planning and networking
Implemented sales strategies to increase market share and drive growth
Collaborated with marketing and product teams to align sales efforts with company goals
Associate Manager
290
salaries
| ₹5.1 L/yr - ₹17 L/yr |
Junior Manager
250
salaries
| ₹3 L/yr - ₹12 L/yr |
Senior Engineer
119
salaries
| ₹3.5 L/yr - ₹8.5 L/yr |
Manager
111
salaries
| ₹9.5 L/yr - ₹28.6 L/yr |
Executive Accountant
59
salaries
| ₹3 L/yr - ₹7.5 L/yr |
Larsen & Toubro Limited
Shapoorji Pallonji Group
Kalpataru Projects International
Nagarjuna Construction Company