Filter interviews by
Heard coupling is a rigid coupling while fluid coupling is a flexible coupling.
Heard coupling is used for high torque applications while fluid coupling is used for smooth acceleration.
Heard coupling has no slippage while fluid coupling has some slippage.
Heard coupling requires precise alignment while fluid coupling can tolerate some misalignment.
Examples of heard coupling include gear couplings and grid couplings while...
Preventive maintenance is a proactive approach to maintenance that involves regular inspections, repairs, and replacements to prevent equipment failure.
Preventive maintenance involves scheduled inspections, cleaning, lubrication, and replacement of parts before they fail.
It helps to reduce downtime, increase equipment lifespan, and improve safety.
Examples of preventive maintenance include changing oil in a car, replaci...
The number of drives with stacker and reclamier depends on the specific equipment and its configuration.
The number of drives can vary depending on the size and capacity of the stacker and reclamier.
Some stacker and reclamier systems may have multiple drives for redundancy and increased efficiency.
The number of drives may also depend on the type of material being handled and the environmental conditions.
It is important ...
Stacker and Reclaimer maintenance is crucial for ensuring uninterrupted material handling operations.
Regular maintenance of Stacker and Reclaimer equipment ensures smooth functioning and prevents breakdowns.
Proper lubrication, cleaning, and inspection of parts are essential for maintaining the equipment.
Regular monitoring of wear and tear of parts and replacement of damaged parts is necessary to avoid accidents and ens...
Machine vibration and heating can be caused by various factors such as misalignment, unbalanced parts, worn bearings, or inadequate lubrication.
Misalignment of machine parts can cause vibration and heating
Unbalanced parts can also cause vibration and heating
Worn bearings can cause vibration and heating
Inadequate lubrication can cause friction and heating
Excessive load on the machine can cause vibration and heating
Top trending discussions
I applied via Company Website and was interviewed before Jan 2021. There were 3 interview rounds.
I applied via Naukri.com and was interviewed before Jan 2021. There were 4 interview rounds.
Manager related
I applied via Naukri.com and was interviewed before Nov 2021. There were 4 interview rounds.
I applied via Naukri.com and was interviewed in Feb 2021. There were 7 interview rounds.
I applied via Referral and was interviewed in Aug 2021. There were 4 interview rounds.
I applied via Company Website and was interviewed before Sep 2022. There were 2 interview rounds.
I applied via Approached by Company and was interviewed before Aug 2022. There were 4 interview rounds.
I applied via Walk-in and was interviewed in Jul 2023. There was 1 interview round.
Managing 100mw wtg spare involves efficient planning, inventory management, and proactive maintenance.
Develop a comprehensive spare parts inventory management system
Regularly assess the condition of spare parts and replace as needed
Implement preventive maintenance strategies to minimize downtime
Establish strong relationships with suppliers to ensure timely availability of spare parts
Monitor and analyze data to identify...
Some of the top questions asked at the GMR Energy Manager Mechanical Maintenance interview for freshers -
based on 1 review
Rating in categories
Associate Manager
128
salaries
| ₹4.6 L/yr - ₹17 L/yr |
Junior Manager
99
salaries
| ₹3.5 L/yr - ₹8.3 L/yr |
Manager
51
salaries
| ₹9.5 L/yr - ₹20.9 L/yr |
Associate General Manager
25
salaries
| ₹17 L/yr - ₹43 L/yr |
Manager Civil
10
salaries
| ₹10.5 L/yr - ₹22.5 L/yr |
Suzlon Group
Adani Power
Adani Group
Torrent Power