Gm Construction Quantity Surveyor Interview Questions and Answers

Updated 25 Apr 2021

Gm Construction Quantity Surveyor Interview Experiences

1 interview found

Interview Questionnaire 

1 Question

  • Q1. Construction field related Technical questions

Interview questions from similar companies

I appeared for an interview before Jul 2016.

Interview Preparation Tips

Round: Group Discussion
Duration: 4 hours 5 minutes

Round: Test
Duration: 2 hours 5 minutes

I applied via Walk-in and was interviewed in Aug 2020. There was 1 interview round.

Interview Questionnaire 

1 Question

  • Q1. ELSR MEANS

Interview Preparation Tips

Interview preparation tips for other job seekers - Elevated service level Reservoir

I applied via Recruitment Consultant and was interviewed in Apr 2020. There were 3 interview rounds.

Interview Questionnaire 

1 Question

  • Q1. About HT/LT,Motor/Feeder & Substation Errection & Commission.

Interview Preparation Tips

Interview preparation tips for other job seekers - Good Questions Are Asked.

Interview Questionnaire 

1 Question

  • Q1. Hard core techanical

I applied via Approached by Company and was interviewed before Feb 2021. There were 2 interview rounds.

Round 1 - HR 

(2 Questions)

  • Q1. What are your salary expectations?
  • Q2. What is your family background?
Round 2 - One-on-one 

(1 Question)

  • Q1. Technical round - depends on your sector and manager . Else no technical questions. Ready to travel . Married or not . Over...

Interview Preparation Tips

Topics to prepare for TCE Senior Engineer interview:
  • Basic
Interview preparation tips for other job seekers - Check out on going projects of your stream, opportunities to learn and grow , do bit of Market survey with respect to salary, job responsibilities . And main important is your team .
All the best

I applied via Naukri.com and was interviewed in Nov 2020. There was 1 interview round.

Interview Questionnaire 

4 Questions

  • Q1. What is the previous job role ?
  • Q2. What is the percentage of bitumen in DBM ?
  • Ans. 

    The percentage of bitumen in DBM varies depending on the specific mix design and project requirements.

    • DBM stands for Dense Bituminous Macadam, which is a type of road construction material.

    • The percentage of bitumen in DBM typically ranges from 4% to 6% by weight.

    • The exact percentage of bitumen is determined based on factors such as traffic load, climate conditions, and desired durability.

    • Higher percentages of bitumen a...

  • Answered by AI
  • Q3. Why you want change your company ?
  • Q4. What is your salary expectation ?

Interview Preparation Tips

Interview preparation tips for other job seekers - Don't expect genuine to salary hike, really so sad to genuine salary negotiation Person .

I applied via Naukri.com and was interviewed in Feb 2021. There were 2 interview rounds.

Interview Questionnaire 

2 Questions

  • Q1. Welding, qc, daily activities
  • Q2. Ndt test, valve industry

Interview Preparation Tips

Interview preparation tips for other job seekers - Little knowledge required but confidence is important

I applied via Company Website and was interviewed in Feb 2021. There were 6 interview rounds.

Interview Questionnaire 

3 Questions

  • Q1. Everything related to our field
  • Q2. Past and current project contributions
  • Q3. What do you think about SPCPL

Interview Preparation Tips

Interview preparation tips for other job seekers - Being a professional firm, professional interview and presentation needs to clear

I applied via Referral and was interviewed before May 2020. There was 1 interview round.

Interview Questionnaire 

3 Questions

  • Q1. How to do Rate analysis ?
  • Ans. 

    Rate analysis is the process of determining the unit cost of a particular item or activity in a construction project.

    • Identify the item or activity to be analyzed

    • Determine the quantity of materials and labor required

    • Calculate the cost of materials and labor

    • Add overhead costs and profit margin

    • Divide the total cost by the quantity to get the unit rate

    • Compare the rate with market rates to ensure competitiveness

  • Answered by AI
  • Q2. What are the components to be considered in the Rate analysis?
  • Ans. 

    Components to be considered in Rate analysis

    • Cost of materials

    • Cost of labor

    • Cost of equipment

    • Overhead expenses

    • Profit margin

    • Taxes and duties

    • Transportation costs

    • Wastage and spoilage

    • Contingencies

    • Productivity rates

    • Market rates

    • Inflation rates

  • Answered by AI
  • Q3. Documents required to certify Final bill
  • Ans. 

    The documents required to certify the final bill as a Quantity Surveyor.

    • Contract documents

    • Measurement records

    • Variation orders

    • Payment certificates

    • Final account statement

    • As-built drawings

    • Completion certificates

    • Test reports

    • Subcontractor invoices

    • Material invoices

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Both Technical & Contract knowledge is required. Prepare for the same.

Tell us how to improve this page.

Site Engineer
4 salaries
unlock blur

₹2.4 L/yr - ₹4.5 L/yr

Civil Site Engineer
4 salaries
unlock blur

₹1.4 L/yr - ₹3 L/yr

Junior Engineer
3 salaries
unlock blur

₹2.3 L/yr - ₹3.6 L/yr

Project Manager Civil
3 salaries
unlock blur

₹2 L/yr - ₹3.5 L/yr

Explore more salaries
Compare Gm Construction with

Megha Engineering & Infrastructures

3.9
Compare

Shapoorji Pallonji Group

4.1
Compare

Alstom Transportation

3.7
Compare

Tata Technologies

3.6
Compare
Did you find this page helpful?
Yes No
write
Share an Interview