Filter interviews by
Boiler light up, turbine rolling, metallurgy of boiler and turbine, and DM plant are all important aspects of managing an assistant manager role.
Boiler light up procedure involves purging the boiler, filling it with water, and heating it up to a specific temperature.
Turbine rolling involves starting the turbine and gradually increasing its speed to its operating level.
Metallurgy of boiler and turbine involves understan...
Top trending discussions
Some of the top questions asked at the Giridhan Metal interview -
The duration of Giridhan Metal interview process can vary, but typically it takes about less than 2 weeks to complete.
based on 16 interviews
Interview experience
based on 95 reviews
Rating in categories
Assistant Manager
21
salaries
| ₹0 L/yr - ₹0 L/yr |
Senior Engineer
18
salaries
| ₹0 L/yr - ₹0 L/yr |
Assistant Engineer
16
salaries
| ₹0 L/yr - ₹0 L/yr |
Engineer
14
salaries
| ₹0 L/yr - ₹0 L/yr |
Senior Officer
8
salaries
| ₹0 L/yr - ₹0 L/yr |
Tata Steel
JSW Steel
Hindalco Industries
Vedanta Limited