Filter interviews by
I appeared for an interview in Dec 2024.
I have over 5 years of experience in planning and managing projects in various industries.
Managed project timelines, budgets, and resources effectively
Developed and implemented strategic plans to achieve project goals
Collaborated with cross-functional teams to ensure project success
Utilized project management tools such as Gantt charts and Kanban boards
Led weekly project status meetings to track progress and address an
Seeking new challenges and opportunities for growth in a dynamic work environment.
Desire for professional development and advancement
Interest in taking on new responsibilities and projects
Seeking a more collaborative and innovative work culture
Looking for a better work-life balance
Wanting to apply skills and experience in a new industry or sector
Density of steel, cement, sand, and ratio of concrete mix are important factors in construction.
Density of steel is around 7850 kg/m^3.
Density of cement is around 1440 kg/m^3.
Density of sand is around 1600 kg/m^3.
Ratio of concrete mix varies depending on the strength required, common ratios are 1:2:4 (cement:sand:aggregate) for general use.
Density = Mass/Volume, so density can be calculated by knowing the mass and volu
Quantity measurement of structure involves determining the amount of materials needed for construction.
Calculate the volume of the structure by multiplying the length, width, and height.
Estimate the quantity of materials such as concrete, steel, and bricks required based on the structural design.
Consider factors like wastage, reinforcements, and formwork when calculating quantities.
Use software tools like AutoCAD or Ex
I applied via Referral and was interviewed in Jan 2023. There were 3 interview rounds.
Method statements are detailed descriptions of how a task will be carried out, including the necessary resources and procedures.
Method statements outline the steps, resources, and procedures required to complete a task safely and efficiently.
They are commonly used in construction and engineering projects to ensure work is carried out in a systematic and organized manner.
Method statements help identify potential hazards...
The MS Program cost schedule outlines the expenses associated with the program over time.
The cost schedule should include tuition fees, books, materials, and any other expenses
It should also outline payment deadlines and any available financial aid options
Regularly review and update the cost schedule to ensure accuracy and transparency
Yes, I have experience managing sites and coordinating with various stakeholders.
I have successfully managed multiple construction sites simultaneously
I have coordinated with contractors, vendors, and clients to ensure project timelines are met
I have experience in resolving site-related issues and ensuring compliance with safety regulations
GIRDHARI LAL CONSTRUCTIONS interview questions for popular designations
I applied via Referral and was interviewed before May 2023. There were 3 interview rounds.
Inventory discuss, material measure/ calculation
How to manage inventory and How many people handling under
I applied via Approached by Company and was interviewed in Aug 2022. There were 4 interview rounds.
Bleeding of concrete is the process of water rising to the surface of freshly placed concrete.
Bleeding occurs due to the settlement of solid particles in the concrete mix.
It can lead to surface defects and reduced durability of the concrete.
Concrete grade25 means the compressive strength of the concrete after 28 days of curing is 25 N/mm².
The 'm' in concrete grade25 refers to the mix ratio of cement, sand, and aggregat
Standard sizes of construction equipment and testing of materials are crucial for efficient and safe construction.
Standard sizes of construction equipment include excavators, bulldozers, cranes, and loaders.
Testing of materials involves determining their strength, durability, and other properties.
Common tests for construction materials include compressive strength tests for concrete and tensile strength tests for steel...
How can you mange your site better then others..?
I applied via Walk-in and was interviewed before Jul 2021. There were 2 interview rounds.
I appeared for an interview in Mar 2017.
To make the red fishes 98%, 50 fishes have to be removed from the aquarium.
Calculate 1% of 200 fishes, which is 2 fishes.
To make the red fishes 98%, subtract 1% (2 fishes) from 99% (198 fishes).
To find the number of fishes to be removed, divide the difference by 1% (2 fishes).
Therefore, 50 fishes have to be removed to make the red fishes 98%.
based on 9 interviews
Interview experience
based on 106 reviews
Rating in categories
Civil Site Engineer
22
salaries
| ₹2.2 L/yr - ₹5.4 L/yr |
Site Engineer
17
salaries
| ₹2.2 L/yr - ₹4.8 L/yr |
Civil Engineer
10
salaries
| ₹3 L/yr - ₹5 L/yr |
Safety Supervisor
9
salaries
| ₹2 L/yr - ₹3 L/yr |
Billing Engineer
9
salaries
| ₹3 L/yr - ₹7.2 L/yr |
Marpu Foundation
Huawei Technologies
HCL Infosystems
Z X Learning