Add office photos
Employer?
Claim Account for FREE

GIRDHARI LAL CONSTRUCTIONS

3.5
based on 97 Reviews
Filter interviews by

Google Pay Interview Questions and Answers

Updated 19 Mar 2024

Q1. Will you be able to manage site

Ans.

Yes, I have experience managing sites and coordinating with various stakeholders.

  • I have successfully managed multiple construction sites simultaneously

  • I have coordinated with contractors, vendors, and clients to ensure project timelines are met

  • I have experience in resolving site-related issues and ensuring compliance with safety regulations

Add your answer

Q2. Do you Method Statements

Ans.

Method statements are detailed descriptions of how a task will be carried out, including the necessary resources and procedures.

  • Method statements outline the steps, resources, and procedures required to complete a task safely and efficiently.

  • They are commonly used in construction and engineering projects to ensure work is carried out in a systematic and organized manner.

  • Method statements help identify potential hazards and risks, and outline control measures to mitigate them....read more

Add your answer

Q3. what is the bleeding of concrete? what is m and 25 in concrete grade25..?

Ans.

Bleeding of concrete is the process of water rising to the surface of freshly placed concrete.

  • Bleeding occurs due to the settlement of solid particles in the concrete mix.

  • It can lead to surface defects and reduced durability of the concrete.

  • Concrete grade25 means the compressive strength of the concrete after 28 days of curing is 25 N/mm².

  • The 'm' in concrete grade25 refers to the mix ratio of cement, sand, and aggregate used in the concrete mix.

Add your answer

Q4. MS Program cost schedule

Ans.

The MS Program cost schedule outlines the expenses associated with the program over time.

  • The cost schedule should include tuition fees, books, materials, and any other expenses

  • It should also outline payment deadlines and any available financial aid options

  • Regularly review and update the cost schedule to ensure accuracy and transparency

Add your answer
Discover Google Pay interview dos and don'ts from real experiences

Q5. some standerd size of construction equipment and testing of materials

Ans.

Standard sizes of construction equipment and testing of materials are crucial for efficient and safe construction.

  • Standard sizes of construction equipment include excavators, bulldozers, cranes, and loaders.

  • Testing of materials involves determining their strength, durability, and other properties.

  • Common tests for construction materials include compressive strength tests for concrete and tensile strength tests for steel.

  • Equipment and materials must meet industry standards and ...read more

Add your answer

Q6. Dencity of steel, cement, sand and retio of concret mix

Ans.

Density of steel, cement, sand, and ratio of concrete mix are important factors in construction.

  • Density of steel is around 7850 kg/m^3.

  • Density of cement is around 1440 kg/m^3.

  • Density of sand is around 1600 kg/m^3.

  • Ratio of concrete mix varies depending on the strength required, common ratios are 1:2:4 (cement:sand:aggregate) for general use.

  • Density = Mass/Volume, so density can be calculated by knowing the mass and volume of the material.

Add your answer

Q7. Quantity measurment of structure

Ans.

Quantity measurement of structure involves determining the amount of materials needed for construction.

  • Calculate the volume of the structure by multiplying the length, width, and height.

  • Estimate the quantity of materials such as concrete, steel, and bricks required based on the structural design.

  • Consider factors like wastage, reinforcements, and formwork when calculating quantities.

  • Use software tools like AutoCAD or Excel for accurate quantity measurements.

Add your answer
Contribute & help others!
Write a review
Share interview
Contribute salary
Add office photos

Interview Process at Google Pay

based on 3 interviews in the last 1 year
Interview experience
4.0
Good
View more
Interview Tips & Stories
Ace your next interview with expert advice and inspiring stories

Top Interview Questions from Similar Companies

3.8
 • 2.9k Interview Questions
3.7
 • 306 Interview Questions
3.8
 • 265 Interview Questions
4.2
 • 237 Interview Questions
4.4
 • 197 Interview Questions
4.2
 • 135 Interview Questions
View all
Top GIRDHARI LAL CONSTRUCTIONS Interview Questions And Answers
Share an Interview
Stay ahead in your career. Get AmbitionBox app
qr-code
Helping over 1 Crore job seekers every month in choosing their right fit company
70 Lakh+

Reviews

5 Lakh+

Interviews

4 Crore+

Salaries

1 Cr+

Users/Month

Contribute to help millions
Get AmbitionBox app

Made with ❤️ in India. Trademarks belong to their respective owners. All rights reserved © 2024 Info Edge (India) Ltd.

Follow us
  • Youtube
  • Instagram
  • LinkedIn
  • Facebook
  • Twitter