user image QURESHI MOHD FARAZ AHMED

posted on 25 Jun 2024

Interview experience
3
Average
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(6 Questions)

  • Q1. What is the density of construction materials such as cement, steel, Gypsum, Flooring tiles?
  • Ans. 

    The density of construction materials varies depending on the type of material. Cement, steel, gypsum, and flooring tiles all have different densities.

    • Cement typically has a density of around 1440 kg/m^3.

    • Steel has a density of approximately 7850 kg/m^3.

    • Gypsum has a density of about 2320 kg/m^3.

    • Flooring tiles can have varying densities depending on the material used, such as ceramic tiles having a density of around 2500

  • Answered by AI
  • Q2. What is the shower height in bathroom?
  • Ans. 

    The standard shower height in a bathroom is typically around 80 inches (6 feet 8 inches) from the floor to the shower head.

    • Standard shower height is around 80 inches from the floor to the shower head

    • The height can vary based on personal preference and accessibility needs

    • Consider the height of the tallest person using the shower when determining the height

  • Answered by AI
  • Q3. How to calculate built-up Area?
  • Ans. 

    Built-up area can be calculated by adding the total area of all floors including walls and columns.

    • Calculate the area of each floor by multiplying length and width.

    • Include the area of walls and columns in the calculation.

    • Add up the areas of all floors to get the built-up area.

    • For example, if a building has 3 floors with dimensions 10x10m each, the built-up area would be 300 square meters.

  • Answered by AI
  • Q4. How much slump require for pump concrete?
  • Ans. 

    The slump required for pump concrete typically ranges from 4 to 7 inches.

    • Slump is a measure of the consistency of concrete, indicating how easily it can be mixed, placed, and compacted.

    • For pump concrete, a higher slump is usually preferred to ensure it flows easily through the pump system without clogging.

    • The recommended slump for pump concrete is typically between 4 to 7 inches, but it can vary based on the specific m

  • Answered by AI
  • Q5. Sequence of Water proofing of bathroom detail explain?
  • Ans. 

    The sequence of waterproofing a bathroom involves multiple steps to ensure proper sealing and protection against water damage.

    • 1. Prepare the surface by cleaning and removing any debris or old waterproofing material.

    • 2. Apply a primer to the surface to improve adhesion of the waterproofing membrane.

    • 3. Install the waterproofing membrane, such as a liquid membrane or sheet membrane, according to manufacturer's instructions...

  • Answered by AI
  • Q6. How much concrete cube strength after 07 days or 28 days ?
  • Ans. 

    The concrete cube strength after 07 days is typically around 65-75% of the 28 days strength.

    • Concrete cube strength at 07 days is usually around 65-75% of the 28 days strength

    • The strength of concrete increases with time as it continues to cure and gain strength

    • Factors like water-cement ratio, curing conditions, and type of cement used can affect the strength development

  • Answered by AI

Interview questions from similar companies

Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - HR 

(2 Questions)

  • Q1. Self introduction and my career details
  • Q2. Its about my previous company details
Round 2 - Technical 

(1 Question)

  • Q1. It's all about my experience based technical questions

Site Engineer Interview Questions & Answers

DRA Homes user image Nishanth Ganesan Velu

posted on 31 Jul 2024

Interview experience
4
Good
Difficulty level
-
Process Duration
-
Result
-
Round 1 - One-on-one 

(3 Questions)

  • Q1. Density of common material like cement, steel, fine and coarse aggregate
  • Ans. 

    Density of common construction materials varies, with cement around 1440 kg/m3, steel around 7850 kg/m3, fine aggregate around 1600-1750 kg/m3, and coarse aggregate around 1200-1750 kg/m3.

    • Cement density: 1440 kg/m3

    • Steel density: 7850 kg/m3

    • Fine aggregate density: 1600-1750 kg/m3

    • Coarse aggregate density: 1200-1750 kg/m3

  • Answered by AI
  • Q2. Weight of the cube which is made to check the strength of concrete
  • Ans. 

    The weight of the cube used to check the strength of concrete is typically 15 cm x 15 cm x 15 cm and weighs around 29 kg.

    • Standard size of cube for testing concrete strength is 15 cm x 15 cm x 15 cm

    • Weight of the cube is usually around 29 kg

    • The cube is made of concrete from the same batch being tested

  • Answered by AI
  • Q3. Ratio of cement mortar for outer and inner wall plastering
  • Ans. 

    The ratio of cement mortar for outer and inner wall plastering varies depending on the type of wall and desired finish.

    • The ratio of cement mortar for outer wall plastering is usually 1:4 (1 part cement to 4 parts sand).

    • The ratio of cement mortar for inner wall plastering is typically 1:6 (1 part cement to 6 parts sand).

    • However, the ratio can vary based on factors such as the type of wall surface, desired finish, and lo...

  • Answered by AI
Round 2 - HR 

(2 Questions)

  • Q1. What is your goal and do you know how to achieve?
  • Ans. 

    My goal is to become a proficient Site Engineer by gaining experience, knowledge, and skills in the field.

    • Continuously seek opportunities to learn and improve technical skills

    • Work on various projects to gain practical experience

    • Seek mentorship from experienced engineers

    • Stay updated with industry trends and technologies

    • Obtain relevant certifications to enhance credibility

    • Set specific career milestones to track progress

  • Answered by AI
  • Q2. After 5 to 6 years, what is your position in your field ?
  • Ans. 

    I envision myself as a Senior Site Engineer leading projects and mentoring junior engineers.

    • Leading and managing multiple projects simultaneously

    • Mentoring and training junior engineers

    • Implementing innovative technologies and practices

    • Collaborating with cross-functional teams for successful project delivery

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Be strong on what you know and have to know something about advancement in your field

I applied via Referral and was interviewed in Jan 2021. There were 5 interview rounds.

Interview Questionnaire 

1 Question

  • Q1. Civil structural, finishing and mep. These subjects have to be known.

Interview Preparation Tips

Interview preparation tips for other job seekers - Not only civil any specialization, you have to know civil structural, finishing in details, electrical, plumbing, land scaping all things. Have Knowledge everything.
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(2 Questions)

  • Q1. Discraib and draw slab section
  • Q2. Draw scetion and elevation bath room
  • Ans. 

    Section and elevation drawings of a bathroom

    • Include dimensions for all fixtures and fittings

    • Show the placement of plumbing lines and electrical outlets

    • Label materials and finishes for walls, floors, and fixtures

  • Answered by AI
Round 2 - HR 

(2 Questions)

  • Q1. Tell mi about us
  • Ans. 

    A leading engineering company specializing in innovative solutions for various industries.

    • Provides cutting-edge engineering solutions

    • Works with a wide range of industries such as automotive, aerospace, and technology

    • Focuses on research and development to stay ahead of the competition

  • Answered by AI
  • Q2. Last company review
  • Ans. 

    Received positive feedback on technical skills and leadership abilities.

    • Received commendation for successfully leading a team in completing a major project ahead of schedule

    • Recognized for consistently providing innovative solutions to complex technical challenges

    • Received high ratings for communication skills and ability to collaborate effectively with cross-functional teams

  • Answered by AI
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Recruitment Consulltant and was interviewed in Dec 2023. There were 2 interview rounds.

Round 1 - HR 

(1 Question)

  • Q1. Pervious company and personal details will ask.
Round 2 - Technical 

(4 Questions)

  • Q1. Full of core related questions.
  • Q2. Like that civil related IS codes.
  • Q3. Concrete related questions.
  • Q4. Material related questions.
Interview experience
5
Excellent
Difficulty level
Hard
Process Duration
-
Result
Selected Selected

I applied via Walk-in

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Properly align and format text in your resume. A recruiter will have to spend more time reading poorly aligned text, leading to high chances of rejection.
View all tips
Round 2 - Technical 

(2 Questions)

  • Q1. Maivan work know waterproofing work check, brick work, plastering, painting, putty, primary , gypsum work know, falceling, tile marvel, granite, wooden work know, upvc mep railing scating work check,
  • Ans. Interview time I'm speak
  • Answered by lalatsahoo
  • Q2. Any question & answer i can speak

Interview Preparation Tips

Interview preparation tips for other job seekers - I can speak English, hindi, odia, finishing work total know, stacher
My present company my home group
My pvc company aparna construction
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(3 Questions)

  • Q1. Internal plaster thickness and ratio?
  • Ans. 

    Internal plaster thickness and ratio are important factors in construction projects.

    • The standard thickness of internal plaster is usually 12mm for walls and 15mm for ceilings.

    • The ratio of internal plaster is typically 1:6 (1 part cement to 6 parts sand).

    • The thickness and ratio may vary depending on the specific requirements of the project and the type of surface being plastered.

  • Answered by AI
  • Q2. Process of slab checking?
  • Ans. 

    Slab checking involves verifying the structural integrity and load-bearing capacity of concrete slabs.

    • Check for proper reinforcement placement and spacing

    • Verify concrete mix design and curing process

    • Inspect for any cracks or defects

    • Ensure slab thickness meets design specifications

    • Perform load testing if necessary

  • Answered by AI
  • Q3. External Plaster thickness and ratio?
  • Ans. 

    External plaster thickness and ratio are determined based on the type of surface and desired finish.

    • External plaster thickness typically ranges from 12mm to 20mm depending on the surface condition.

    • The ratio of external plaster mix is usually 1:4 (cement:sand) for rough surfaces and 1:6 for smooth finishes.

    • For better adhesion, a bonding agent may be added to the plaster mix.

    • Proper curing is essential to ensure the stren

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - I will try my best technical knowledge provide for your company...
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Properly align and format text in your resume. A recruiter will have to spend more time reading poorly aligned text, leading to high chances of rejection.
View all tips
Round 2 - One-on-one 

(4 Questions)

  • Q1. Just Try to answer honestly
  • Q2. Stay Confident Happy
  • Q3. Draw RCC Structure
  • Ans. 

    RCC structure is a reinforced concrete structure commonly used in construction.

    • RCC structures consist of concrete reinforced with steel bars for added strength

    • Common types of RCC structures include beams, columns, slabs, and walls

    • RCC structures are designed to withstand heavy loads and provide durability

    • Proper reinforcement detailing is crucial for the structural integrity of RCC structures

  • Answered by AI
  • Q4. Tell About MEP drawing
  • Ans. 

    MEP drawings are detailed plans that show the mechanical, electrical, and plumbing systems of a building.

    • MEP drawings include layouts for HVAC systems, electrical wiring, plumbing fixtures, and fire protection systems.

    • They are essential for coordinating the installation of these systems during construction.

    • MEP drawings also indicate the location of equipment, materials, and connections needed for the systems to functio...

  • Answered by AI
Round 3 - One-on-one 

(1 Question)

  • Q1. Draw a section of Plumbing
  • Ans. 

    A section of plumbing typically includes pipes, fittings, and fixtures for water supply and drainage systems.

    • Include pipes for both water supply and drainage systems

    • Show fittings such as elbows, tees, and couplings

    • Include fixtures like sinks, toilets, and showers

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Improving your basic knowledge

Interview Questionnaire 

1 Question

  • Q1. Technical

Gera Developments Interview FAQs

How many rounds are there in Gera Developments Site Engineer interview?
Gera Developments interview process usually has 1 rounds. The most common rounds in the Gera Developments interview process are Technical.
What are the top questions asked in Gera Developments Site Engineer interview?

Some of the top questions asked at the Gera Developments Site Engineer interview -

  1. What is the density of construction materials such as cement, steel, Gypsum, Fl...read more
  2. How much concrete cube strength after 07 days or 28 day...read more
  3. How much slump require for pump concre...read more

Tell us how to improve this page.

Gera Developments Site Engineer Interview Process

based on 1 interview

Interview experience

3
  
Average
View more

Interview Questions from Similar Companies

DRA Homes Interview Questions
4.6
 • 23 Interviews
JP Infra Interview Questions
3.8
 • 19 Interviews
N.K. Realtors Interview Questions
4.2
 • 19 Interviews
DTC Projects Interview Questions
4.0
 • 17 Interviews
PS Group Interview Questions
3.8
 • 16 Interviews
Bullmen Realty Interview Questions
3.0
 • 14 Interviews
View all
Gera Developments Site Engineer Salary
based on 5 salaries
₹2.6 L/yr - ₹6.3 L/yr
13% more than the average Site Engineer Salary in India
View more details

Gera Developments Site Engineer Reviews and Ratings

based on 1 review

5.0/5

Rating in categories

5.0

Skill development

5.0

Work-life balance

5.0

Salary

5.0

Job security

5.0

Company culture

5.0

Promotions

5.0

Work satisfaction

Explore 1 Review and Rating
Assistant Manager
31 salaries
unlock blur

₹4.8 L/yr - ₹12 L/yr

Junior Engineer
24 salaries
unlock blur

₹3.2 L/yr - ₹6.2 L/yr

Manager
15 salaries
unlock blur

₹7.5 L/yr - ₹12 L/yr

Senior Manager
12 salaries
unlock blur

₹9.6 L/yr - ₹15 L/yr

Junior Engineer Civil
11 salaries
unlock blur

₹2.5 L/yr - ₹6.3 L/yr

Explore more salaries
Compare Gera Developments with

Realty Assistant

3.8
Compare

Kunal Structure

3.7
Compare

Omkar Realtors and Developers Group

3.7
Compare

HM Group

4.4
Compare
Did you find this page helpful?
Yes No
write
Share an Interview