Upload Button Icon Add office photos

Filter interviews by

Gera Developments Interview Questions and Answers

Updated 25 Jun 2024

Gera Developments Interview Experiences

Popular Designations

3 interviews found

Site Engineer Interview Questions & Answers

user image QURESHI MOHD FARAZ AHMED

posted on 25 Jun 2024

Interview experience
3
Average
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(6 Questions)

  • Q1. What is the density of construction materials such as cement, steel, Gypsum, Flooring tiles?
  • Ans. 

    The density of construction materials varies depending on the type of material. Cement, steel, gypsum, and flooring tiles all have different densities.

    • Cement typically has a density of around 1440 kg/m^3.

    • Steel has a density of approximately 7850 kg/m^3.

    • Gypsum has a density of about 2320 kg/m^3.

    • Flooring tiles can have varying densities depending on the material used, such as ceramic tiles having a density of around 2500

  • Answered by AI
  • Q2. What is the shower height in bathroom?
  • Ans. 

    The standard shower height in a bathroom is typically around 80 inches (6 feet 8 inches) from the floor to the shower head.

    • Standard shower height is around 80 inches from the floor to the shower head

    • The height can vary based on personal preference and accessibility needs

    • Consider the height of the tallest person using the shower when determining the height

  • Answered by AI
  • Q3. How to calculate built-up Area?
  • Ans. 

    Built-up area can be calculated by adding the total area of all floors including walls and columns.

    • Calculate the area of each floor by multiplying length and width.

    • Include the area of walls and columns in the calculation.

    • Add up the areas of all floors to get the built-up area.

    • For example, if a building has 3 floors with dimensions 10x10m each, the built-up area would be 300 square meters.

  • Answered by AI
  • Q4. How much slump require for pump concrete?
  • Ans. 

    The slump required for pump concrete typically ranges from 4 to 7 inches.

    • Slump is a measure of the consistency of concrete, indicating how easily it can be mixed, placed, and compacted.

    • For pump concrete, a higher slump is usually preferred to ensure it flows easily through the pump system without clogging.

    • The recommended slump for pump concrete is typically between 4 to 7 inches, but it can vary based on the specific m

  • Answered by AI
  • Q5. Sequence of Water proofing of bathroom detail explain?
  • Ans. 

    The sequence of waterproofing a bathroom involves multiple steps to ensure proper sealing and protection against water damage.

    • 1. Prepare the surface by cleaning and removing any debris or old waterproofing material.

    • 2. Apply a primer to the surface to improve adhesion of the waterproofing membrane.

    • 3. Install the waterproofing membrane, such as a liquid membrane or sheet membrane, according to manufacturer's instructions...

  • Answered by AI
  • Q6. How much concrete cube strength after 07 days or 28 days ?
  • Ans. 

    The concrete cube strength after 07 days is typically around 65-75% of the 28 days strength.

    • Concrete cube strength at 07 days is usually around 65-75% of the 28 days strength

    • The strength of concrete increases with time as it continues to cure and gain strength

    • Factors like water-cement ratio, curing conditions, and type of cement used can affect the strength development

  • Answered by AI

Top Gera Developments Site Engineer Interview Questions and Answers

Q1. What is the density of construction materials such as cement, steel, Gypsum, Flooring tiles?
View answer (1)

Site Engineer Interview Questions asked at other Companies

Q1. 1.BBS calculation of slab? 2.Stairs case riser and tread dimension? 3.Types of cement? 4.Full form of tmt, pcc, rcc, tmx, dpc 5.Definition of plinth area, courtyard area, built-up area? 6.function of dpc 8.standard size of brick? 9. Write g... read more
View answer (4)

Junior Engineer Interview Questions & Answers

user image Prajwal Pramod Lakhmapure

posted on 12 Jan 2024

Interview experience
4
Good
Difficulty level
-
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed before Jan 2023. There were 2 interview rounds.

Round 1 - HR 

(1 Question)

  • Q1. Tale me about your self and ask about experience
Round 2 - Technical 

(1 Question)

  • Q1. Ask about previous job and their technical part

Junior Engineer Interview Questions asked at other Companies

Q1. What is the main role of Junior engineer in Electrical maintenance and How to provide the company facilities ?
View answer (25)

Interview Questions & Answers

user image Anonymous

posted on 25 Apr 2022

I applied via Approached by Company and was interviewed before Apr 2021. There were 2 interview rounds.

Round 1 - Assignment 
Round 2 - HR 

(2 Questions)

  • Q1. How's family background?
  • Q2. How did you think in critical condition

Interview Preparation Tips

Interview preparation tips for other job seekers - Study properly related to your profession.

Jobs at Gera Developments

View all

Interview questions from similar companies

I applied via Referral and was interviewed in Feb 2021. There were 3 interview rounds.

Interview Questionnaire 

2 Questions

  • Q1. General civil
  • Q2. Finishing RCC

Interview Preparation Tips

Interview preparation tips for other job seekers - Not recommended

Interview Questionnaire 

2 Questions

  • Q1. Technically more question about sub to superstructure
  • Q2. More about new innovative in civil division

Interview Preparation Tips

Interview preparation tips for other job seekers - Be prepared for everything in civil professionally
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
4-6 weeks
Result
Selected Selected

I applied via Referral and was interviewed in Apr 2023. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Double-check your resume for any spelling mistakes. The recruiter may consider spelling mistakes as careless behavior or poor communication skills.
View all tips
Round 2 - Technical 

(1 Question)

  • Q1. About previous projects.
Round 3 - HR 

(1 Question)

  • Q1. Salary negotiations.

Interview Preparation Tips

Interview preparation tips for other job seekers - Proper channel. Naukri. Hr mail.

I applied via Referral and was interviewed in Feb 2022. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - HR 

(4 Questions)

  • Q1. What are your salary expectations?
  • Q2. Share details of your previous job.
  • Q3. Why are you looking for a change?
  • Q4. Tell me about yourself.

Interview Preparation Tips

Interview preparation tips for other job seekers - Be yourself confident and enthusiastic
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
6-8 weeks
Result
Selected Selected

I applied via Naukri.com and was interviewed before Jun 2022. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(1 Question)

  • Q1. Structure related questions, Finishing work, Basic knowledge of Fire and Plumbing work, Quality codes, Glazing work, ETC..
Round 3 - HR 

(1 Question)

  • Q1. Pay rolls and offer letter

Interview Preparation Tips

Interview preparation tips for other job seekers - Need to be confidence with your answer and have Site work knowledge.
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
4-6 weeks
Result
Selected Selected

I applied via Approached by Company and was interviewed in Aug 2023. There was 1 interview round.

Round 1 - Technical 

(1 Question)

  • Q1. Related to QA/QC and IS standards

Interview Preparation Tips

Interview preparation tips for other job seekers - Strong base required to crack return test
Interview experience
2
Poor
Difficulty level
-
Process Duration
-
Result
-
Round 1 - One-on-one 

(2 Questions)

  • Q1. ABOUT THE JOB ROLE AND EXPERIENCE
  • Q2. ABOUT KNOWLEDGE RELATED TO JD

Gera Developments Interview FAQs

How many rounds are there in Gera Developments interview?
Gera Developments interview process usually has 1-2 rounds. The most common rounds in the Gera Developments interview process are HR, Technical and Assignment.
How to prepare for Gera Developments interview?
Go through your CV in detail and study all the technologies mentioned in your CV. Prepare at least two technologies or languages in depth if you are appearing for a technical interview at Gera Developments. The most common topics and skills that interviewers at Gera Developments expect are CRM, Sales, MEP Coordination, Residential and Customer Satisfaction.
What are the top questions asked in Gera Developments interview?

Some of the top questions asked at the Gera Developments interview -

  1. What is the density of construction materials such as cement, steel, Gypsum, Fl...read more
  2. How much concrete cube strength after 07 days or 28 day...read more
  3. How much slump require for pump concre...read more

Tell us how to improve this page.

Gera Developments Interview Process

based on 4 interviews

Interview experience

4.3
  
Good
View more

Interview Questions from Similar Companies

Sobha Interview Questions
3.9
 • 129 Interviews
Lodha Group Interview Questions
4.0
 • 126 Interviews
DLF Interview Questions
3.9
 • 75 Interviews
Prestige Group Interview Questions
4.3
 • 36 Interviews
Brigade Group Interview Questions
4.1
 • 32 Interviews
Oberoi Realty Interview Questions
4.1
 • 17 Interviews
Piramal Realty Interview Questions
3.8
 • 8 Interviews
View all

Gera Developments Reviews and Ratings

based on 129 reviews

4.0/5

Rating in categories

3.7

Skill development

3.6

Work-life balance

4.0

Salary

4.1

Job security

3.6

Company culture

3.4

Promotions

3.6

Work satisfaction

Explore 129 Reviews and Ratings
Sales Intern

Pimpri-Chinchwad

0-1 Yrs

Not Disclosed

Explore more jobs
Assistant Manager
31 salaries
unlock blur

₹4.8 L/yr - ₹12 L/yr

Junior Engineer
24 salaries
unlock blur

₹3.2 L/yr - ₹6.2 L/yr

Manager
15 salaries
unlock blur

₹7.5 L/yr - ₹12 L/yr

Senior Manager
12 salaries
unlock blur

₹9.6 L/yr - ₹15 L/yr

Junior Engineer Civil
11 salaries
unlock blur

₹2.5 L/yr - ₹6.3 L/yr

Explore more salaries
Compare Gera Developments with

Prestige Group

4.3
Compare

Sobha

3.8
Compare

DLF

3.9
Compare

Godrej Properties

3.7
Compare
Did you find this page helpful?
Yes No
write
Share an Interview