Round 1 - Technical 

(2 Questions)

  • Q1. Subgrade top thickeness
  • Q2. What uses of gsb
  • Ans. 

    GSB (Granular Sub Base) is a layer of compacted material used in road construction to provide a stable foundation.

    • GSB is used to provide a stable foundation for roads and pavements.

    • It helps in distributing the load evenly and preventing the subgrade from being affected by traffic loads.

    • GSB is made up of materials like crushed stone, gravel, or sand.

    • It is compacted to achieve the desired density and strength.

    • GSB layer t...

  • Answered by AI

Interview questions from similar companies

Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Naukri.com and was interviewed in Oct 2023. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Coding Test 

Bar bending schedule , RL , BSS , HI, TBM, water rasiw, , BS

Round 3 - Technical 

(7 Questions)

  • Q1. Thickness of DPC= 2.5cm or 1 inch
  • Ans. 

    The thickness of DPC can be either 2.5cm or 1 inch.

    • DPC stands for Damp Proof Course, which is a layer of waterproof material used in construction to prevent moisture from rising through the walls or floors.

    • The thickness of DPC is typically determined based on the specific requirements of the project and local building codes.

    • In some regions, the thickness of DPC is specified in centimeters (e.g., 2.5cm), while in others...

  • Answered by AI
  • Q2. Height of window =2.1m
  • Ans. 

    The height of the window is 2.1m.

    • The height of the window is a fixed measurement.

    • It is important to consider the height of the window when designing the building.

    • The height of the window may vary depending on the specific requirements of the project.

  • Answered by AI
  • Q3. Height of building= 3.15m
  • Ans. 

    The height of the building is 3.15m.

    • The height of the building is a crucial measurement in civil engineering.

    • It is important to accurately measure and document the height of a building for various purposes such as construction planning, structural analysis, and code compliance.

    • In this case, the height of the building is specified as 3.15m.

    • This measurement can be used to determine the number of floors, calculate the vol...

  • Answered by AI
  • Q4. Lintel thickness -15cm( inch)
  • Ans. 

    The lintel thickness is 15cm (inch).

    • The lintel thickness is the measurement of the horizontal beam that supports the load above an opening, such as a door or window.

    • A lintel with a thickness of 15cm (inch) is considered standard in many construction projects.

    • The thickness of the lintel is determined based on the span of the opening and the load it needs to support.

    • Lintels can be made of various materials, including con...

  • Answered by AI
  • Q5. Weight of one bag cement =50 kg
  • Ans. 

    The weight of one bag of cement is 50 kg.

    • The weight of cement bags is standardized at 50 kg.

    • This weight is important for calculating the quantity of cement required for a project.

    • For example, if a project requires 100 bags of cement, the total weight would be 5000 kg.

  • Answered by AI
  • Q6. Site Engineer , civil work, Building construction, site supervisor I am sayan Choudhury from West Bengal Bolpur santiniketan institute of polytechnic college Civil engineering department diploma experienc...
  • Ans. 

    RCC ,water ratio , bar bending schedule

  • Answered Anonymously
  • Q7. Minimum thickness wall -400 mm
  • Ans. 

    The minimum thickness for a wall is typically 400 mm.

    • The minimum thickness of a wall is determined by structural requirements and building codes.

    • Thicker walls provide better structural stability and can support heavier loads.

    • The type of wall construction and materials used also influence the minimum thickness.

    • For example, a load-bearing concrete wall may require a minimum thickness of 400 mm to ensure structural integr...

  • Answered by AI

Interview Preparation Tips

Topics to prepare for L&T Construction Civil Site Engineer & Site Incharge interview:
  • Capital Goods
  • Hi,
  • BS, site Engineer
  • Building Construction
  • Metro station project
Interview preparation tips for other job seekers - project, site supervisor , and leveling Survey Topic - BS, IS, FS, RL, HI, BM, TBM , value with rise and fall method
Survey
Instruments Name- Auto Leveling
interdisciplinary knowledge.learn practical application of theoretical knowledge on any subject and enables a deep learning experience.
Interview experience
4
Good
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Job Fair and was interviewed in Oct 2023. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Don’t add your photo or details such as gender, age, and address in your resume. These details do not add any value.
View all tips
Round 2 - Case Study 

Civil engineering technology

Round 3 - One-on-one 

(5 Questions)

  • Q1. Site Engineer santiniketan institute of polytechnic college
  • Q2. Sayan Choudhury
  • Q3. Civil engineering students
  • Q4. Building construction, site Engineer's and site supervis, Surveyor engineering
  • Q5. *****

Interview Preparation Tips

Interview preparation tips for other job seekers - Site Engineer job construction site Engineer building construction site Engineer job
Interview experience
5
Excellent
Difficulty level
Hard
Process Duration
Less than 2 weeks
Result
Selected Selected

I was interviewed in Aug 2024.

Round 1 - Technical 

(6 Questions)

  • Q1. Why use Steel in Construction works.
  • Ans. 

    Steel is used in construction works due to its strength, durability, versatility, and cost-effectiveness.

    • Steel is known for its high tensile strength, making it ideal for supporting heavy loads in buildings and bridges.

    • Steel is durable and resistant to corrosion, ensuring the longevity of structures.

    • Steel can be easily fabricated into different shapes and sizes, allowing for versatile design options.

    • Steel is cost-effec...

  • Answered by AI
  • Q2. Why Provided Concrete Cover in all Structures Members.
  • Ans. 

    Concrete cover is provided in all structural members to protect the reinforcement bars from corrosion and fire damage.

    • Concrete cover protects the reinforcement bars from corrosion caused by exposure to moisture and chemicals in the environment.

    • It also provides protection against fire damage by acting as a barrier between the reinforcement and the fire.

    • Proper concrete cover helps in maintaining the durability and streng...

  • Answered by AI
  • Q3. How to do Calculate Staircase Steel.
  • Ans. 

    Calculate the amount of steel required for a staircase based on design and dimensions.

    • Calculate the total length of all the steel bars needed for the staircase

    • Determine the diameter and spacing of the steel bars based on design requirements

    • Consider the number of steps and the dimensions of the staircase in the calculation

    • Account for any additional reinforcement needed for structural integrity

    • Consult structural drawings

  • Answered by AI
  • Q4. How do I Find Concrete Workability.
  • Ans. 

    Concrete workability can be determined by conducting a slump test.

    • Conduct a slump test to measure the consistency of the concrete mix.

    • Adjust the water content or use admixtures to achieve the desired workability.

    • Consider factors such as temperature, humidity, and type of aggregates in determining workability.

    • Consult with concrete mix design experts for guidance on achieving the desired workability.

    • Use tools like flow t...

  • Answered by AI
  • Q5. What is Slum test for Concrete.
  • Ans. 

    Slump test is a method to measure the consistency of concrete before it sets.

    • Slump test involves filling a cone-shaped mold with concrete, then lifting the mold to see how much the concrete slumps or settles.

    • The amount of slump indicates the workability of the concrete - higher slump means more workable concrete.

    • The test helps ensure the concrete is of the right consistency for proper placement and compaction.

    • Slump tes...

  • Answered by AI
  • Q6. What is Concrete Mix Design.
  • Ans. 

    Concrete mix design is the process of selecting suitable ingredients and determining their proportions to produce concrete with desired properties.

    • Involves selecting the right combination of materials like cement, aggregates, water, and admixtures

    • Proportions are determined based on desired strength, workability, durability, and other properties

    • Testing and adjusting the mix design to meet project requirements

    • Example: A ...

  • Answered by AI
Interview experience
3
Average
Difficulty level
Moderate
Process Duration
6-8 weeks
Result
Selected Selected

I was interviewed in Jul 2024.

Round 1 - Technical 

(2 Questions)

  • Q1. Site supervisor
  • Q2. No ather cuntry, working form my country
Round 2 - Technical 

(2 Questions)

  • Q1. Work location , company room
  • Q2. No working refareniy
Round 3 - Technical 

(2 Questions)

  • Q1. Full safety work
  • Q2. No question
Round 4 - Technical 

(2 Questions)

  • Q1. No working chemical
  • Q2. Quality my work
Round 5 - Technical 

(2 Questions)

  • Q1. Proper material provided
  • Q2. No question

Interview Preparation Tips

Interview preparation tips for other job seekers - Yes company public sujao
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
2-4 weeks
Result
Selected Selected

I applied via Approached by Company

Round 1 - Technical 

(3 Questions)

  • Q1. Electrical field
  • Q2. Site trouble shooting problem discussion
  • Q3. No not at all
Round 2 - Case Study 

For any case study related to field

Round 3 - Group Discussion 

For my technical field questions

Interview experience
4
Good
Difficulty level
Hard
Process Duration
6-8 weeks
Result
Selected Selected

I was interviewed in Jul 2024.

Round 1 - Technical 

(5 Questions)

  • Q1. Site supervisor
  • Q2. Manpower handling, lobur salary preparation and calculation progress montering
  • Q3. Working location
  • Q4. Mechanical civil work
  • Q5. No ather cuntry

Interview Preparation Tips

Interview preparation tips for other job seekers - Naukari.com
Live job MAHSR c-3 sec-2
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I was interviewed in Jul 2024.

Round 1 - Technical 

(2 Questions)

  • Q1. What is full form of SBC
  • Q2. Density of concrete
Round 2 - Technical 

(1 Question)

  • Q1. Diameter of TBM
Round 3 - HR 

(1 Question)

  • Q1. Tell me something about yourself
Interview experience
1
Bad
Difficulty level
-
Process Duration
-
Result
-
Round 1 - One-on-one 

(3 Questions)

  • Q1. What is packing supervisor
  • Ans. 

    A packing supervisor is responsible for overseeing the packing process in a warehouse or manufacturing facility.

    • Supervises packing staff to ensure efficient and accurate packing of products

    • Monitors inventory levels and orders packing supplies as needed

    • Ensures compliance with safety regulations and quality standards

    • Trains new packing employees on packing procedures and equipment usage

  • Answered by AI
  • Q2. When you are free job
  • Q3. What is your company policy
  • Ans. 

    Our company policy prioritizes safety, quality, and efficiency in all operations.

    • Safety is our top priority, with strict adherence to safety protocols and regulations.

    • Quality control measures are in place to ensure high standards are met in all projects.

    • Efficiency is emphasized to maximize productivity and meet project deadlines.

    • Regular training and development programs are provided to employees to uphold company stand...

  • Answered by AI

Site Engineer Interview Questions & Answers

AECOM user image Babalpreet singh

posted on 2 May 2022

Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed before May 2021. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Properly align and format text in your resume. A recruiter will have to spend more time reading poorly aligned text, leading to high chances of rejection.
View all tips
Round 2 - Technical 

(2 Questions)

  • Q1. DAISCUSS ABOUT TECHNICAL ASPECTS OF CIVIL ENGINEERING AND SOFTWARE SKILLS
  • Q2. CODAL PROVISION OF CONCRETE AND COMMANDS OF SOFTWARE
  • Ans. 

    CODAL provisions for concrete refer to the guidelines and regulations set by relevant authorities, while commands of software are the specific instructions or functions within a software program.

    • CODAL provisions for concrete include specifications for mix design, strength requirements, and durability standards.

    • Commands of software for site engineers may include functions for structural analysis, quantity takeoff, and p...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Work enviourment is very fabulous

Gangamai Industries Construction Interview FAQs

How many rounds are there in Gangamai Industries Construction Civil Site Engineer & Site Incharge interview?
Gangamai Industries Construction interview process usually has 1 rounds. The most common rounds in the Gangamai Industries Construction interview process are Technical.
What are the top questions asked in Gangamai Industries Construction Civil Site Engineer & Site Incharge interview?

Some of the top questions asked at the Gangamai Industries Construction Civil Site Engineer & Site Incharge interview -

  1. What uses of ...read more
  2. Subgrade top thicken...read more

Tell us how to improve this page.

Gangamai Industries Construction Civil Site Engineer & Site Incharge Interview Process

based on 1 interview

Interview experience

4
  
Good
View more

Interview Questions from Similar Companies

L&T Construction Interview Questions
4.0
 • 734 Interviews
Tata Projects Interview Questions
4.2
 • 422 Interviews
KEC International Interview Questions
4.1
 • 295 Interviews
Tata Technologies Interview Questions
3.6
 • 257 Interviews
TCE Interview Questions
3.8
 • 246 Interviews
View all
Planning & Billing Engineer
5 salaries
unlock blur

₹4.7 L/yr - ₹6.7 L/yr

Senior Engineer
4 salaries
unlock blur

₹4.8 L/yr - ₹11.7 L/yr

Structural Engineer
4 salaries
unlock blur

₹1.9 L/yr - ₹3.6 L/yr

Site Engineer
4 salaries
unlock blur

₹3.8 L/yr - ₹4.5 L/yr

Quality Engineer
4 salaries
unlock blur

₹2.4 L/yr - ₹3.2 L/yr

Explore more salaries
Compare Gangamai Industries Construction with

Larsen & Toubro Limited

4.0
Compare

Shapoorji Pallonji Group

4.1
Compare

Hindustan Construction Company

4.2
Compare

Simplex Infrastructures

3.3
Compare
Did you find this page helpful?
Yes No
write
Share an Interview