BBS stands for Bar Bending Schedule, which is a detailed list of reinforcement bars to be used in a construction project.
BBS includes details such as bar mark, bar size, quantity, length, and bending shape.
It helps in estimating the quantity of steel required for the project.
BBS is essential for ensuring proper reinforcement placement and structural integrity.
Example: BBS for a beam will specify the number of bars, the
The procedure for gypsum work of walls involves preparing the surface, applying the gypsum plaster, and finishing with a smooth surface. The minimum and maximum thickness of gypsum depend on the type of wall and desired finish.
Prepare the surface by cleaning and dampening it to ensure proper adhesion of the gypsum plaster.
Apply the gypsum plaster evenly using a trowel, starting from the bottom and working upwards.
Finis...
The question is asking for exceptions to losing 0.05 db.
Exceptions may include gaining instead of losing 0.05 db
Not losing exactly 0.05 db
Losing more than 0.05 db