Upload Button Icon Add office photos
Engaged Employer

i

This company page is being actively managed by G R Infraprojects Team. If you also belong to the team, you can get access from here

G R Infraprojects Verified Tick

Compare button icon Compare button icon Compare
4.1

based on 1.5k Reviews

Proud winner of ABECA 2024 - AmbitionBox Employee Choice Awards

zig zag pattern zig zag pattern

Filter interviews by

G R Infraprojects Electrical Bim Modeler Interview Questions, Process, and Tips

Updated 24 Apr 2024

G R Infraprojects Electrical Bim Modeler Interview Experiences

1 interview found

Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(4 Questions)

  • Q1. What is copy monitor
  • Ans. 

    Copy monitor is a tool in Revit that allows users to monitor changes in linked models and update their own model accordingly.

    • Copy monitor helps ensure that changes in linked models are reflected in the user's model

    • It can be used to track changes in elements such as walls, doors, windows, etc.

    • Users can review and accept or reject changes detected by copy monitor

    • It helps maintain coordination and consistency between link

  • Answered by AI
  • Q2. How many types parameters
  • Ans. 

    There are various types of parameters used in electrical BIM modeling.

    • There are parameters for electrical equipment such as voltage, current, power rating, etc.

    • Parameters for cable trays, conduits, and other electrical components.

    • Parameters for system properties like load calculations, circuit information, etc.

  • Answered by AI
  • Q3. How to make sheet
  • Ans. 

    To make a sheet, you need to create a new sheet in the software and then add views, annotations, and schedules as needed.

    • Open the software and create a new sheet

    • Add views of the model to the sheet

    • Insert annotations and dimensions

    • Include schedules if required

    • Organize the layout of the sheet for clarity

    • Review and finalize the sheet before printing or sharing

  • Answered by AI
  • Q4. How to copy monitory
  • Ans. 

    To copy monitory, you can use a software program to duplicate the display output onto another monitor or screen.

    • Use the display settings on your computer to duplicate the screen onto another monitor.

    • Connect the second monitor to your computer using a VGA, HDMI, or DisplayPort cable.

    • Adjust the resolution and orientation of the second monitor to match your preferences.

    • Ensure that both monitors are powered on and recogniz

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Nothing

Skills evaluated in this interview

Interview questions from similar companies

I applied via Recruitment Consultant and was interviewed in Sep 2020. There were 3 interview rounds.

Interview Questionnaire 

1 Question

  • Q1. Technically or Software

Interview Preparation Tips

Interview preparation tips for other job seekers - I have experienced that's why it was easy to me

G R Infraprojects Interview FAQs

How many rounds are there in G R Infraprojects Electrical Bim Modeler interview?
G R Infraprojects interview process usually has 1 rounds. The most common rounds in the G R Infraprojects interview process are Technical.
What are the top questions asked in G R Infraprojects Electrical Bim Modeler interview?

Some of the top questions asked at the G R Infraprojects Electrical Bim Modeler interview -

  1. How many types paramet...read more
  2. What is copy moni...read more
  3. How to make sh...read more

Tell us how to improve this page.

G R Infraprojects Electrical Bim Modeler Reviews and Ratings

based on 1 review

5.0/5

Rating in categories

2.0

Skill development

5.0

Work-Life balance

5.0

Salary & Benefits

5.0

Job Security

5.0

Company culture

5.0

Promotions/Appraisal

5.0

Work Satisfaction

Explore 1 Review and Rating
Assistant Manager
354 salaries
unlock blur

₹4.6 L/yr - ₹11.5 L/yr

Senior Engineer
145 salaries
unlock blur

₹3.6 L/yr - ₹8.9 L/yr

Engineer
137 salaries
unlock blur

₹2 L/yr - ₹6.5 L/yr

Senior Executive
133 salaries
unlock blur

₹3 L/yr - ₹8 L/yr

Structural Engineer
128 salaries
unlock blur

₹2 L/yr - ₹6.3 L/yr

Explore more salaries
Compare G R Infraprojects with

Nagarjuna Construction Company

4.1
Compare

PNC Infratech

3.9
Compare

Ashoka Buildcon

4.1
Compare

IRB Infrastructure

4.0
Compare

Calculate your in-hand salary

Confused about how your in-hand salary is calculated? Enter your annual salary (CTC) and get your in-hand salary
Did you find this page helpful?
Yes No
write
Share an Interview