Acceptance criteria for welding defects
Acceptance criteria for welding defects are specified in codes and standards such as AWS D1.1, ASME Section VIII, and API 1104
The criteria depend on the type of defect, its location, and the material being welded
Examples of acceptance criteria include maximum allowable size and number of defects, distance from the weld centerline, and type of defect
Defects that exceed the acceptan...
Pipe coating procedure involves applying a protective layer on the surface of the pipe to prevent corrosion and damage.
The surface of the pipe should be cleaned and prepared before coating.
The coating material should be selected based on the type of pipe and its intended use.
The coating should be applied evenly and in accordance with the manufacturer's instructions.
The coating should be inspected for defects and thickn...
To prepare measurement, follow these steps
Identify the parameter to be measured
Select the appropriate measuring instrument
Calibrate the instrument before use
Ensure the instrument is in good working condition
Take multiple measurements to ensure accuracy
Record the measurements accurately
Analyze the data to draw conclusions
posted on 15 Mar 2021
posted on 18 May 2023
I applied via Approached by Company and was interviewed in Nov 2022. There were 4 interview rounds.
I applied via Approached by Company and was interviewed in Jun 2022. There were 2 interview rounds.
posted on 22 Dec 2021
I applied via Company Website and was interviewed in Jun 2021. There were 3 interview rounds.
posted on 22 Apr 2022
I applied via Walk-in and was interviewed before Apr 2021. There were 3 interview rounds.
posted on 17 Feb 2021
I applied via Walk-in and was interviewed in Aug 2020. There was 1 interview round.
posted on 4 Jan 2021
I applied via Naukri.com and was interviewed in Jul 2020. There were 3 interview rounds.
posted on 16 May 2021
I applied via Naukri.com and was interviewed before May 2020. There were 3 interview rounds.
I can join within two weeks.
I am currently serving a two-week notice period at my current job.
I have already completed all necessary paperwork and background checks.
I am ready to start as soon as possible.
I can adjust my start date based on the company's requirements.
I left my last company to pursue new opportunities and challenges.
Seeking growth and advancement in my career
Looking for a company with a better cultural fit
Wanting to broaden my skill set
Desire for a higher level of responsibility
Company downsizing or restructuring
based on 1 interview
Interview experience
based on 1 review
Rating in categories
Assistant Manager
359
salaries
| ₹4.6 L/yr - ₹11.5 L/yr |
Senior Engineer
227
salaries
| ₹3.6 L/yr - ₹8.4 L/yr |
Engineer
139
salaries
| ₹2 L/yr - ₹6.5 L/yr |
Deputy Manager
129
salaries
| ₹6.6 L/yr - ₹16 L/yr |
Structural Engineer
122
salaries
| ₹2 L/yr - ₹6.3 L/yr |
Larsen & Toubro Limited
Tata Projects
L&T Construction
Megha Engineering & Infrastructures