Interview experience
3
Average
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Referral and was interviewed before Jun 2023. There were 3 interview rounds.

Round 1 - Aptitude Test 

Mostly maths questions

Round 2 - Technical 

(2 Questions)

  • Q1. Pipe, elbow, fittings
  • Q2. API Standard for storage tanks
  • Ans. 

    API Standard 650 is the standard for storage tanks in the oil and gas industry.

    • API Standard 650 provides guidelines for the design, fabrication, erection, and inspection of welded storage tanks.

    • It covers tanks with internal pressures approximating atmospheric pressure, but higher pressure tanks are covered in API Standard 620.

    • The standard includes requirements for materials, design, fabrication, erection, inspection, a...

  • Answered by AI
Round 3 - HR 

(2 Questions)

  • Q1. What are my life goals
  • Q2. Will you be comfortable in site work.

Interview Preparation Tips

Topics to prepare for Furnace Fabrica India Trainee Site Engineer interview:
  • Engineering basics,
  • Reading drawings

Trainee Site Engineer Interview Questions asked at other Companies

Q1. Various apparatus use in civil engineering Various grade of materials Density of various construction materials Steps of a structure Types of pipes, steel , bricks,
View answer (1)

Senior Planning Engineer ( BE Mechanical ) Interview Questions & Answers

user image Anonymous

posted on 26 Sep 2021

I applied via Walk-in and was interviewed in Aug 2021. There were 4 interview rounds.

Interview Questionnaire 

1 Question

  • Q1. What is WBS? What is earned value? What’s is weighted? Constraints about primavera p6?

Interview Preparation Tips

Interview preparation tips for other job seekers - It will be a Moderate question respect to technical and they will check your technical skills

Interview Questionnaire 

1 Question

  • Q1. Procurement Department Working Procedure
  • Ans. 

    The procurement department follows a systematic working procedure to ensure efficient sourcing and purchasing of goods and services.

    • Identification of procurement needs

    • Sourcing potential suppliers

    • Request for quotations or proposals

    • Evaluation and selection of suppliers

    • Negotiation and finalization of contracts

    • Order placement and tracking

    • Receipt and inspection of goods/services

    • Invoice processing and payment

    • Supplier relatio

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Normal Interview.... reference cross verify....bank statements cross checked...

Deputy Manager Procurement Interview Questions asked at other Companies

Q1. How effectively can you use Excel for reporting purposes ?
View answer (1)
Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Assignment 

HR and Account activities

Interview Preparation Tips

Interview preparation tips for other job seekers - For the post of Site Accountant

Furnace Fabrica India interview questions for popular designations

 Deputy Manager Procurement

 (1)

 Resident Construction Manager - Civil

 (1)

 Site Accountant and Administrator

 (1)

 Trainee Site Engineer

 (1)

I applied via Approached by Company and was interviewed in Dec 2017. There were 5 interview rounds.

Interview Questionnaire 

5 Questions

  • Q1. My huge experience in construction field and activities as an site in charge
  • Q2. How to handle site independently
  • Ans. 

    To handle a site independently, one must have strong leadership skills, technical knowledge, and effective communication abilities.

    • Demonstrate strong leadership skills by taking charge of the site and making decisions confidently.

    • Possess in-depth technical knowledge about construction processes, materials, and equipment.

    • Communicate effectively with the team, subcontractors, and stakeholders to ensure smooth operations.

    • ...

  • Answered by AI
  • Q3. My construction field experience
  • Q4. They have washed my brain during this round and fixed my package below previous. They have not disclosed perks and facilities, employees entitlements. No family accommodation provided. Not even disclosed...
  • Q5. No stability of staff working. They can remove from company at any moment without any notice. Worst company I have ever worked.

Interview Preparation Tips

Round: Resume Shortlist
Experience: My previous big companies experience

General Tips: Please do not come in this company. Very unstable company for staff.
Skills: Communication, Problem Solving, Leadership, Presentation Skills, Time Management, Decision Making Skills
Duration: 1-4 weeks

Skills evaluated in this interview

Resident Construction Manager - Civil Interview Questions asked at other Companies

Q1. How to handle site independently
View answer (1)

Interview questions from similar companies

Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I was interviewed in Dec 2024.

Round 1 - Technical 

(4 Questions)

  • Q1. Procedure about maintenance
  • Q2. Knowledge about LOTO
  • Q3. Haw to maintain a battery bank
  • Q4. Asking about ptw
Interview experience
5
Excellent
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Campus Placement and was interviewed in Nov 2024. There was 1 interview round.

Round 1 - One-on-one 

(5 Questions)

  • Q1. Ducting types youed
  • Q2. Ducting any types of material
  • Q3. Mep for explain
  • Q4. Mep basic form housed property
  • Q5. Electrical line
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - One-on-one 

(1 Question)

  • Q1. The only way I could do that
Round 2 - One-on-one 

(2 Questions)

  • Q1. Very cool and very well executed
  • Q2. Good luck to all

Interview Preparation Tips

Interview preparation tips for other job seekers - Good preparation and perfect knowledge for your project
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
-
Result
Not Selected

I applied via Recruitment Consulltant and was interviewed in Sep 2024. There was 1 interview round.

Round 1 - Technical 

(7 Questions)

  • Q1. What are the Pump head loss calculation parameters
  • Ans. 

    Pump head loss calculation parameters include friction loss, elevation change, velocity head, and fittings.

    • Friction loss due to pipe roughness

    • Elevation change between inlet and outlet

    • Velocity head due to fluid velocity

    • Losses from fittings like elbows, tees, and valves

  • Answered by AI
  • Q2. What is the AHU components
  • Ans. 

    AHU components refer to the various parts of an Air Handling Unit that work together to regulate and circulate air in a building.

    • Filters - to remove dust and particles from the air

    • Coils - for heating or cooling the air

    • Fans - to circulate the air

    • Dampers - to control the flow of air

    • Humidifiers/dehumidifiers - to adjust the humidity levels

  • Answered by AI
  • Q3. Which type of blowers are use in AHU
  • Ans. 

    Centrifugal blowers are commonly used in AHUs for their efficiency and ability to handle high volumes of air.

    • Centrifugal blowers are preferred for AHUs due to their ability to handle high volumes of air efficiently.

    • They are more energy efficient compared to other types of blowers.

    • Examples of centrifugal blowers commonly used in AHUs include forward curved, backward inclined, and airfoil designs.

  • Answered by AI
  • Q4. What is the difference between primary pump or secondary pump
  • Ans. 

    Primary pump is the main pump responsible for the majority of the pumping work, while secondary pump is a backup pump used in case the primary pump fails.

    • Primary pump is the main pump in a system, while secondary pump is a backup pump.

    • Primary pump is responsible for the majority of the pumping work, while secondary pump is used only when needed.

    • Examples: In a heating system, the primary pump circulates hot water throug...

  • Answered by AI
  • Q5. What is the AHU valve conection
  • Ans. 

    AHU valve connection refers to the connection of valves in an air handling unit for controlling the flow of air.

    • AHU valve connection is essential for regulating the flow of air in an air handling unit.

    • Valves are typically connected to the AHU ductwork to control the amount of air entering or exiting the unit.

    • Properly connected valves ensure efficient operation of the AHU system.

    • Examples of AHU valves include damper val

  • Answered by AI
  • Q6. What things are required in chilled water pipe size
  • Ans. 

    Chilled water pipe size requirements depend on flow rate, pressure drop, material, insulation, and system design.

    • Flow rate: Determine the required flow rate of chilled water in the system.

    • Pressure drop: Calculate the pressure drop to ensure efficient operation.

    • Material: Select appropriate pipe material based on temperature and pressure requirements.

    • Insulation: Insulate the pipes to prevent heat gain or loss.

    • System desi...

  • Answered by AI
  • Q7. What is the chiller conection
  • Ans. 

    The chiller connection refers to the method by which a chiller unit is connected to a building's HVAC system.

    • Chiller connection typically involves piping to transport chilled water from the chiller to the building's air handling units.

    • The connection may also include electrical wiring for power supply and control signals.

    • Proper chiller connection is crucial for efficient cooling and proper functioning of the HVAC system

  • Answered by AI

Interview Preparation Tips

Topics to prepare for Sterling & Wilson Project Manager interview:
  • prepare in HVAC chiller system
Interview preparation tips for other job seekers - I advice to the job seekers gained the practical knowledge in our field.
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Referral and was interviewed in Nov 2024. There was 1 interview round.

Round 1 - Technical 

(2 Questions)

  • Q1. What is the diesel consumption for Dence Bituen material.
  • Ans. 

    The diesel consumption for Dense Bitumen material varies depending on factors such as temperature, mix design, and equipment used.

    • Diesel consumption for Dense Bitumen material is typically measured in liters per ton of material produced.

    • Factors such as temperature of the mix, mix design, and type of equipment used can affect the diesel consumption.

    • For example, a higher temperature mix may require more diesel to heat th...

  • Answered by AI
  • Q2. Brief your Past Experience
  • Ans. 

    I have over 10 years of experience in management roles, leading teams and implementing strategic initiatives.

    • Managed a team of 50+ employees in a retail setting, increasing sales by 20% within one year

    • Implemented new customer service protocols that resulted in a 15% increase in customer satisfaction

    • Led cross-functional projects to streamline operations and reduce costs by 10%

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - 1. Prepare your job knowledge.
2. A specific answer is required for the Question.
3. Your language should be apparent communication.
4. Avoid unwanted explanations when answering the question.

Furnace Fabrica India Interview FAQs

How many rounds are there in Furnace Fabrica India interview?
Furnace Fabrica India interview process usually has 2-3 rounds. The most common rounds in the Furnace Fabrica India interview process are HR, Resume Shortlist and Assignment.
What are the top questions asked in Furnace Fabrica India interview?

Some of the top questions asked at the Furnace Fabrica India interview -

  1. What is WBS? What is earned value? What’s is weighted? Constraints about prim...read more
  2. How to handle site independent...read more
  3. Procurement Department Working Proced...read more

Tell us how to improve this page.

Furnace Fabrica India Interview Process

based on 6 interviews

Interview experience

1.8
  
Bad
View more

Interview Questions from Similar Companies

J&F Interview Questions
3.9
 • 29 Interviews
Eversendai Interview Questions
3.9
 • 27 Interviews
J K Fenner Interview Questions
3.9
 • 26 Interviews
View all

Furnace Fabrica India Reviews and Ratings

based on 106 reviews

3.3/5

Rating in categories

3.3

Skill development

3.3

Work-life balance

2.9

Salary

3.2

Job security

3.2

Company culture

3.0

Promotions

3.2

Work satisfaction

Explore 106 Reviews and Ratings
Deputy Manager
18 salaries
unlock blur

₹6 L/yr - ₹10 L/yr

Project Manager
16 salaries
unlock blur

₹5.1 L/yr - ₹16 L/yr

Project Engineer
15 salaries
unlock blur

₹2.9 L/yr - ₹4.8 L/yr

Project Engineer Mechanical
11 salaries
unlock blur

₹3 L/yr - ₹6.6 L/yr

Safety Officer
11 salaries
unlock blur

₹3.1 L/yr - ₹5 L/yr

Explore more salaries
Compare Furnace Fabrica India with

Sterling & Wilson

4.1
Compare

Transrail Lighting

3.9
Compare

J K Fenner

3.9
Compare

McNally Bharat Engineering

4.1
Compare
Did you find this page helpful?
Yes No
write
Share an Interview