I applied via Referral and was interviewed before Jun 2023. There were 3 interview rounds.
Mostly maths questions
API Standard 650 is the standard for storage tanks in the oil and gas industry.
API Standard 650 provides guidelines for the design, fabrication, erection, and inspection of welded storage tanks.
It covers tanks with internal pressures approximating atmospheric pressure, but higher pressure tanks are covered in API Standard 620.
The standard includes requirements for materials, design, fabrication, erection, inspection, a...
I applied via Walk-in and was interviewed in Aug 2021. There were 4 interview rounds.
The procurement department follows a systematic working procedure to ensure efficient sourcing and purchasing of goods and services.
Identification of procurement needs
Sourcing potential suppliers
Request for quotations or proposals
Evaluation and selection of suppliers
Negotiation and finalization of contracts
Order placement and tracking
Receipt and inspection of goods/services
Invoice processing and payment
Supplier relatio
HR and Account activities
Furnace Fabrica India interview questions for popular designations
I applied via Approached by Company and was interviewed in Dec 2017. There were 5 interview rounds.
To handle a site independently, one must have strong leadership skills, technical knowledge, and effective communication abilities.
Demonstrate strong leadership skills by taking charge of the site and making decisions confidently.
Possess in-depth technical knowledge about construction processes, materials, and equipment.
Communicate effectively with the team, subcontractors, and stakeholders to ensure smooth operations.
...
Top trending discussions
posted on 23 Jan 2025
I was interviewed in Dec 2024.
posted on 3 Dec 2024
I applied via Campus Placement and was interviewed in Nov 2024. There was 1 interview round.
posted on 13 Jan 2025
I applied via Recruitment Consulltant and was interviewed in Sep 2024. There was 1 interview round.
Pump head loss calculation parameters include friction loss, elevation change, velocity head, and fittings.
Friction loss due to pipe roughness
Elevation change between inlet and outlet
Velocity head due to fluid velocity
Losses from fittings like elbows, tees, and valves
AHU components refer to the various parts of an Air Handling Unit that work together to regulate and circulate air in a building.
Filters - to remove dust and particles from the air
Coils - for heating or cooling the air
Fans - to circulate the air
Dampers - to control the flow of air
Humidifiers/dehumidifiers - to adjust the humidity levels
Centrifugal blowers are commonly used in AHUs for their efficiency and ability to handle high volumes of air.
Centrifugal blowers are preferred for AHUs due to their ability to handle high volumes of air efficiently.
They are more energy efficient compared to other types of blowers.
Examples of centrifugal blowers commonly used in AHUs include forward curved, backward inclined, and airfoil designs.
Primary pump is the main pump responsible for the majority of the pumping work, while secondary pump is a backup pump used in case the primary pump fails.
Primary pump is the main pump in a system, while secondary pump is a backup pump.
Primary pump is responsible for the majority of the pumping work, while secondary pump is used only when needed.
Examples: In a heating system, the primary pump circulates hot water throug...
AHU valve connection refers to the connection of valves in an air handling unit for controlling the flow of air.
AHU valve connection is essential for regulating the flow of air in an air handling unit.
Valves are typically connected to the AHU ductwork to control the amount of air entering or exiting the unit.
Properly connected valves ensure efficient operation of the AHU system.
Examples of AHU valves include damper val
Chilled water pipe size requirements depend on flow rate, pressure drop, material, insulation, and system design.
Flow rate: Determine the required flow rate of chilled water in the system.
Pressure drop: Calculate the pressure drop to ensure efficient operation.
Material: Select appropriate pipe material based on temperature and pressure requirements.
Insulation: Insulate the pipes to prevent heat gain or loss.
System desi...
The chiller connection refers to the method by which a chiller unit is connected to a building's HVAC system.
Chiller connection typically involves piping to transport chilled water from the chiller to the building's air handling units.
The connection may also include electrical wiring for power supply and control signals.
Proper chiller connection is crucial for efficient cooling and proper functioning of the HVAC system
posted on 26 Dec 2024
I applied via Referral and was interviewed in Nov 2024. There was 1 interview round.
The diesel consumption for Dense Bitumen material varies depending on factors such as temperature, mix design, and equipment used.
Diesel consumption for Dense Bitumen material is typically measured in liters per ton of material produced.
Factors such as temperature of the mix, mix design, and type of equipment used can affect the diesel consumption.
For example, a higher temperature mix may require more diesel to heat th...
I have over 10 years of experience in management roles, leading teams and implementing strategic initiatives.
Managed a team of 50+ employees in a retail setting, increasing sales by 20% within one year
Implemented new customer service protocols that resulted in a 15% increase in customer satisfaction
Led cross-functional projects to streamline operations and reduce costs by 10%
Interview experience
based on 106 reviews
Rating in categories
Deputy Manager
18
salaries
| ₹6 L/yr - ₹10 L/yr |
Project Manager
16
salaries
| ₹5.1 L/yr - ₹16 L/yr |
Project Engineer
15
salaries
| ₹2.9 L/yr - ₹4.8 L/yr |
Project Engineer Mechanical
11
salaries
| ₹3 L/yr - ₹6.6 L/yr |
Safety Officer
11
salaries
| ₹3.1 L/yr - ₹5 L/yr |
Sterling & Wilson
Transrail Lighting
J K Fenner
McNally Bharat Engineering