Filter interviews by
MTTR,
MTBF,
Preventive maintenance planing
Spares planning
Preventive maintenance plan includes Why Why Why analysis to identify root cause of problems and prevent future occurrences.
Preventive maintenance plan is a proactive approach to maintenance that involves regularly scheduled inspections, repairs, and replacements to prevent equipment failure.
Why Why Why analysis is a technique used to identify the root cause of a problem by asking 'why' multiple times until the underly...
MTTR stands for Mean Time To Repair. Predictive maintenance planning involves analyzing data to identify potential equipment failures.
MTTR is the average time it takes to repair a failed piece of equipment.
To plan predictive maintenance, data is collected and analyzed to identify patterns and potential failures.
This data can include equipment usage, environmental factors, and historical maintenance records.
Based on thi...
Top trending discussions
I applied via Referral and was interviewed before Jul 2022. There were 5 interview rounds.
Math/reasoning/English/telecom
posted on 28 Apr 2020
I applied via Recruitment Consultant and was interviewed before Apr 2019. There were 3 interview rounds.
based on 5 reviews
Rating in categories
Junior Engineer
92
salaries
| ₹2 L/yr - ₹4.6 L/yr |
Deputy Engineer
17
salaries
| ₹3.8 L/yr - ₹6.7 L/yr |
Production Engineer
16
salaries
| ₹2.5 L/yr - ₹4.8 L/yr |
Maintenance Engineer
11
salaries
| ₹2.2 L/yr - ₹5 L/yr |
Senior Engineer
8
salaries
| ₹4.8 L/yr - ₹6.5 L/yr |
Amphenol Interconnect
Jabil
Flex
Sanmina Sci