Filter interviews by
UPH stands for Units Per Hour and is a measure of productivity in manufacturing.
UPH is calculated by dividing the total number of units produced by the total number of hours worked.
For example, if a factory produces 500 units in 10 hours, the UPH would be 50 (500 units / 10 hours).
Yield is a measure of the efficiency of a process or system, calculated by dividing the number of usable units produced by the number of units input.
Yield is calculated by dividing the number of usable units produced by the number of units input.
Yield = (Number of usable units produced / Number of units input) * 100%
For example, if a factory produces 900 usable units out of 1000 units input, the yield would be (900/100
My current CTC is $60,000 per year.
My current CTC is $60,000 per year
CTC stands for Cost to Company
It includes salary, bonuses, benefits, and any other perks
CTC is an important factor in job negotiations
I am expecting a hike that is in line with industry standards and reflects my skills and experience.
I am looking for a hike that is competitive with what other companies are offering for similar positions.
I expect my hike to reflect my performance and contributions to the company.
I am open to negotiation based on the overall compensation package offered by the company.
Top trending discussions
Normal . Keep calm stay focused. Study hard work smart.
Great
posted on 10 Jul 2024
RDBMS stands for Relational Database Management System, a type of database management system that stores data in a structured format.
Organizes data into tables with rows and columns
Uses SQL for querying and managing data
Supports ACID properties for data consistency
Examples: MySQL, Oracle Database, SQL Server
It was a good easy level test and prior preparation is importanat
I applied via Walk-in and was interviewed in Nov 2023. There were 3 interview rounds.
Math, science any other
I applied via Approached by Company and was interviewed in Jan 2023. There were 3 interview rounds.
I applied via Approached by Company and was interviewed before Sep 2023. There was 1 interview round.
I am a dedicated Quality Engineer with a strong background in ensuring product quality and compliance with industry standards.
Experienced in conducting quality audits and inspections
Skilled in root cause analysis and implementing corrective actions
Proficient in using quality tools such as FMEA, Control Charts, and Pareto Analysis
I handle conflict by actively listening, seeking common ground, and finding solutions collaboratively.
I approach conflicts with a calm and rational mindset
I actively listen to all parties involved to understand their perspectives
I seek common ground and areas of agreement to build a foundation for resolution
I work collaboratively with others to find mutually beneficial solutions
I am open to feedback and willing to comp
7QC tools are a set of quality control tools used for process improvement and problem-solving in quality management.
1. Check sheets: Used to collect and analyze data in a systematic way.
2. Pareto chart: Helps identify the most significant factors contributing to a problem.
3. Cause and effect diagram (Fishbone diagram): Used to identify and analyze potential causes of a problem.
4. Histogram: Represents data distribution...
The least count of a micrometer is the smallest measurement that can be read on the scale of the micrometer.
The least count of a micrometer is typically 0.01 mm or 0.001 mm depending on the type of micrometer.
It is determined by the number of divisions on the thimble and the pitch of the screw.
For example, a micrometer with 50 divisions on the thimble and a pitch of 0.5 mm would have a least count of 0.01 mm.
STLC (Software Testing Life Cycle) outlines the phases of software testing from planning to closure.
1. Requirement Analysis: Understand testing requirements based on specifications.
2. Test Planning: Define the scope, resources, and schedule for testing activities.
3. Test Case Design: Create detailed test cases and scenarios to validate functionality.
4. Test Environment Setup: Prepare the environment where testing will ...
Waits in Selenium manage timing issues during automated testing, ensuring elements are ready for interaction.
Implicit Wait: Sets a default wait time for the entire session. Example: driver.manage().timeouts().implicitlyWait(10, TimeUnit.SECONDS);
Explicit Wait: Waits for a specific condition to occur before proceeding. Example: WebDriverWait wait = new WebDriverWait(driver, 10); wait.until(ExpectedConditions.visibilityO...
based on 1 interview
Interview experience
Junior Engineer
85
salaries
| ₹2.3 L/yr - ₹4.6 L/yr |
Deputy Engineer
36
salaries
| ₹3.7 L/yr - ₹6.7 L/yr |
Production Engineer
16
salaries
| ₹2.5 L/yr - ₹4.8 L/yr |
Maintenance Engineer
11
salaries
| ₹2.2 L/yr - ₹4.6 L/yr |
Senior Engineer
9
salaries
| ₹4.8 L/yr - ₹6.7 L/yr |
Reliance Communications
Henry Harvin Education
GAO Tek
Tata Teleservices