Filter interviews by
Be the first one to contribute and help others!
I applied via Approached by Company and was interviewed in Jul 2024. There was 1 interview round.
posted on 6 Jan 2025
I applied via campus placement at Jawaharlal Nehru Technological University (JNTU) and was interviewed in Dec 2024. There was 1 interview round.
GD topic was "pros and cons of strat ups"
Everty member who gave GD was eligible for interview
They gave marks for every candidate
posted on 21 Dec 2024
I managed inventory of various items in the store, including working side areas.
Managed inventory of products and supplies
Organized and maintained stock levels
Handled incoming and outgoing shipments
Ensured proper storage and labeling of items
Performed regular inventory checks and audits
posted on 7 Dec 2024
I applied via Naukri.com
I applied via Company Website and was interviewed in Nov 2024. There were 5 interview rounds.
Behaviour and believe to inform decisions
Details account information and development of the person
Slove tha coding problem
Further details and self information sharing and openly speaking skills test
I applied via Campus Placement and was interviewed in Jul 2024. There was 1 interview round.
posted on 25 Dec 2024
I applied via Naukri.com and was interviewed in Nov 2024. There were 3 interview rounds.
posted on 18 Nov 2024
I applied via Job Portal and was interviewed in Oct 2024. There were 2 interview rounds.
I do not have 1 year experience at Torrent Power.
I do not have any experience working at Torrent Power.
I have experience in a similar role at a different company.
I am eager to learn and adapt to new environments.
I am confident in my abilities to excel in this position.
A transformer is an electrical device that transfers electrical energy between two or more circuits through electromagnetic induction.
Transformers consist of two coils of wire, known as the primary and secondary windings.
The primary winding is connected to the source of electrical power, while the secondary winding is connected to the load.
Transformers can step up or step down voltage levels depending on the number of ...
Torrent Power is a power generation company in India with 1 year of experience in the industry.
Torrent Power is a leading power generation company in India.
Having 1 year of experience in the industry shows familiarity with power plant operations.
Experience at Torrent Power may include working on maintenance, troubleshooting, and optimization of power plant equipment.
Knowledge of safety protocols and regulations in the ...
I applied via Recruitment Consulltant and was interviewed in Sep 2024. There was 1 interview round.
Pump head loss calculation parameters include friction loss, elevation change, velocity head, and fittings.
Friction loss due to pipe roughness
Elevation change between inlet and outlet
Velocity head due to fluid velocity
Losses from fittings like elbows, tees, and valves
AHU components refer to the various parts of an Air Handling Unit that work together to regulate and circulate air in a building.
Filters - to remove dust and particles from the air
Coils - for heating or cooling the air
Fans - to circulate the air
Dampers - to control the flow of air
Humidifiers/dehumidifiers - to adjust the humidity levels
Centrifugal blowers are commonly used in AHUs for their efficiency and ability to handle high volumes of air.
Centrifugal blowers are preferred for AHUs due to their ability to handle high volumes of air efficiently.
They are more energy efficient compared to other types of blowers.
Examples of centrifugal blowers commonly used in AHUs include forward curved, backward inclined, and airfoil designs.
Primary pump is the main pump responsible for the majority of the pumping work, while secondary pump is a backup pump used in case the primary pump fails.
Primary pump is the main pump in a system, while secondary pump is a backup pump.
Primary pump is responsible for the majority of the pumping work, while secondary pump is used only when needed.
Examples: In a heating system, the primary pump circulates hot water throug...
AHU valve connection refers to the connection of valves in an air handling unit for controlling the flow of air.
AHU valve connection is essential for regulating the flow of air in an air handling unit.
Valves are typically connected to the AHU ductwork to control the amount of air entering or exiting the unit.
Properly connected valves ensure efficient operation of the AHU system.
Examples of AHU valves include damper val
Chilled water pipe size requirements depend on flow rate, pressure drop, material, insulation, and system design.
Flow rate: Determine the required flow rate of chilled water in the system.
Pressure drop: Calculate the pressure drop to ensure efficient operation.
Material: Select appropriate pipe material based on temperature and pressure requirements.
Insulation: Insulate the pipes to prevent heat gain or loss.
System desi...
The chiller connection refers to the method by which a chiller unit is connected to a building's HVAC system.
Chiller connection typically involves piping to transport chilled water from the chiller to the building's air handling units.
The connection may also include electrical wiring for power supply and control signals.
Proper chiller connection is crucial for efficient cooling and proper functioning of the HVAC system
posted on 19 Dec 2024
Simple aptitude questions
This is a shortlisting round, and many technically knowledgeable individuals did not qualify for this stage.
Countercurrent flow is more effective due to increased concentration gradient and better utilization of resources.
Countercurrent flow allows for a greater concentration gradient between the two fluids, leading to more efficient mass transfer.
Countercurrent flow also allows for better utilization of resources as the fluids are in contact for a longer period of time.
Concurrent flow, on the other hand, results in a lower ...
The procedure for designing a heat exchanger involves determining heat transfer requirements, selecting appropriate materials, designing the geometry, and analyzing performance.
Determine the heat transfer requirements based on the fluids involved, flow rates, temperatures, and desired heat transfer rate.
Select appropriate materials for the heat exchanger based on compatibility with the fluids, operating conditions, and...
based on 3 reviews
Rating in categories
Site Engineer
4
salaries
| ₹2.5 L/yr - ₹3 L/yr |
Megha Engineering & Infrastructures
Shapoorji Pallonji Group
Alstom Transportation
Tata Technologies