Filter interviews by
I applied via Naukri.com and was interviewed in Mar 2022. There were 2 interview rounds.
I applied via Approached by Company and was interviewed before Mar 2021. There were 3 interview rounds.
Top trending discussions
posted on 19 Apr 2024
Don't join in this group
APTITUDE TEST 2HRS ,
Stress is a natural response to pressure or demands that can affect physical and mental well-being. I am interested in joining your organization because of its positive work culture and opportunities for growth.
Stress is a normal reaction to challenges and can manifest in physical, emotional, and behavioral symptoms.
Joining a supportive organization can help manage stress through teamwork, communication, and work-life ...
I applied via Campus Placement and was interviewed in Oct 2023. There were 3 interview rounds.
5S is a workplace organization method that improves efficiency and safety. 3M and 3K refer to the principles of Muda, Mura, and Muri in lean manufacturing. KANBAN is a visual scheduling system used to manage production flow.
5S involves Sort, Set in order, Shine, Standardize, and Sustain to create a clean and organized work environment.
3M (Muda, Mura, Muri) are the three types of waste in lean manufacturing - Muda (wast...
Manpower handling refers to managing and overseeing the workforce in a production setting. Kaizen is a continuous improvement philosophy aimed at making small, incremental changes for efficiency.
Manpower handling involves recruiting, training, scheduling, and supervising employees to ensure smooth production operations.
Kaizen is a Japanese term meaning 'continuous improvement'. It focuses on making small, incremental c...
I applied via Campus Placement and was interviewed in Aug 2023. There was 1 interview round.
Tolerance refers to the acceptable range of variation in a physical dimension or property of a material or product.
Tolerance is the difference between the maximum and minimum limits of a dimension or property.
It ensures that parts fit together properly and function as intended.
Tolerance can be specified as a numerical value or a range, such as +/- 0.1mm.
Examples include the tolerance for the diameter of a shaft or the
The least count of a micrometer is the smallest measurement that can be read on the scale.
The least count of a micrometer is typically 0.01mm or 0.001mm depending on the type of micrometer.
It is determined by the number of divisions on the thimble and the main scale.
For example, a micrometer with 50 divisions on the thimble and a main scale reading in mm will have a least count of 0.01mm.
A jig is a type of tool used to control the location and/or motion of another tool. A fixture is a work-holding or support device used in the manufacturing industry.
Jigs are used to guide cutting tools, while fixtures are used to hold workpieces in place during machining operations.
Jigs and fixtures are commonly used in manufacturing processes such as welding, drilling, and milling.
Examples of jigs include drill jigs, ...
I applied via Walk-in
5s and TPM are methodologies used in manufacturing to improve efficiency and productivity.
5s stands for Sort, Set in order, Shine, Standardize, Sustain. It is a method for organizing the workplace to improve efficiency and safety.
TPM stands for Total Productive Maintenance. It is a method for maximizing the effectiveness of equipment by involving all employees in the maintenance process.
Example: Implementing 5s in a pr...
posted on 10 Jun 2024
Line balancing is the process of assigning tasks to workstations in a way that evens out the workload and maximizes efficiency.
Involves distributing workload evenly among workstations
Minimizes idle time and bottlenecks
Improves productivity and efficiency
Example: In an assembly line, tasks are allocated to different stations to ensure smooth flow of production
TPM pillars are key principles for Total Productive Maintenance, leading to improved equipment reliability and productivity.
Pillar 1: Autonomous Maintenance - Involving operators in routine maintenance tasks to prevent breakdowns.
Pillar 2: Planned Maintenance - Scheduled maintenance activities to keep equipment in optimal condition.
Pillar 3: Quality Maintenance - Ensuring equipment is capable of producing quality produ...
5s is a methodology used to organize a workplace for efficiency and effectiveness by identifying and storing items used, maintaining the area and items, and sustaining the new order.
Sort: Separate necessary items from unnecessary ones.
Set in order: Arrange necessary items in a logical and efficient manner.
Shine: Clean and inspect the work area regularly.
Standardize: Establish standards and procedures for maintaining th...
Bottlenecks are points in a process where the flow of work is impeded or slowed down, causing delays and inefficiencies.
Bottlenecks can occur due to limited resources, such as equipment or manpower
Identifying and addressing bottlenecks is crucial for improving overall productivity
Examples of bottlenecks include a machine that frequently breaks down, causing a backlog in production
Implementing strategies like cross-trai...
posted on 10 Apr 2024
based on 4 reviews
Rating in categories
Design Engineer
407
salaries
| ₹2.4 L/yr - ₹9 L/yr |
Senior Design Engineer
334
salaries
| ₹4.2 L/yr - ₹13.5 L/yr |
Product Design Engineer
136
salaries
| ₹6.5 L/yr - ₹15.3 L/yr |
Production Engineer
109
salaries
| ₹1.5 L/yr - ₹6 L/yr |
Senior Engineer
101
salaries
| ₹5 L/yr - ₹14 L/yr |
Bharat Forge
Samvardhana Motherson Group
Endurance Technologies
Sundaram Clayton