Filter interviews by
I applied via Referral and was interviewed in Feb 2020. There were 6 interview rounds.
I applied via Campus Placement and was interviewed before Sep 2019. There was 1 interview round.
I have 10 years of experience as an electrician.
I have been working as an electrician for the past 10 years.
During my career, I have gained extensive experience in various electrical systems and equipment.
I have successfully completed numerous electrical installations, repairs, and maintenance tasks.
I am familiar with electrical codes and safety regulations.
I have worked on both residential and commercial projects, han...
Star delta connection is a type of electrical connection used to reduce the starting current of a motor.
It is used in high-power applications where the starting current of the motor is very high.
It involves connecting the motor windings in a star configuration during starting and then switching to a delta configuration during operation.
This reduces the voltage applied to each winding during starting, thereby reducing t...
My typical day as an electrician involves inspecting electrical systems, repairing faulty wiring, and installing new fixtures.
Start the day by reviewing work orders and planning the day's tasks
Drive to job sites and inspect electrical systems for any issues
Repair or replace faulty wiring, switches, and outlets
Install new fixtures, such as ceiling fans or light fixtures
Communicate with clients and provide updates on pro...
Top trending discussions
posted on 10 Feb 2025
I was interviewed in Jan 2025.
Quantitative reasoning
posted on 23 Feb 2025
I was interviewed in Jan 2025.
I applied via Naukri.com and was interviewed in Nov 2024. There were 3 interview rounds.
General aptitude questions.(moderate level)
posted on 22 Dec 2024
The output voltage of an AAAC Rabbit conductor is typically around 600 volts.
The output voltage of an AAAC Rabbit conductor is usually around 600 volts.
The exact output voltage may vary depending on the specific application and conditions.
It is important to consult the manufacturer's specifications for accurate information.
My execution work plan involves setting clear goals, creating a timeline, assigning tasks, monitoring progress, and adjusting as needed.
Set clear goals and objectives for the project
Create a detailed timeline with milestones and deadlines
Assign tasks to team members based on their strengths and expertise
Regularly monitor progress and make adjustments as needed
Communicate effectively with team members and stakeholders
Ut...
Job safety analysis is a process of identifying potential hazards in a job task and implementing controls to mitigate risks.
Involves breaking down a job task into steps
Identifying potential hazards for each step
Determining preventive measures to reduce risks
Ensures workers are aware of safety procedures
Examples: construction site JSA, manufacturing plant JSA
Hazard identification is the process of identifying potential sources of harm in the workplace, while risk assessment involves evaluating the likelihood and severity of those hazards.
Hazard identification involves identifying potential sources of harm such as chemicals, machinery, or ergonomic factors.
Risk assessment involves evaluating the likelihood and severity of harm from these hazards.
The goal is to implement con...
Fire safety refers to measures taken to prevent and protect against the risks of fire.
Fire safety includes having working smoke detectors in place.
It also involves creating and practicing a fire escape plan.
Proper storage and handling of flammable materials is crucial for fire safety.
Regular maintenance of fire extinguishers and other fire safety equipment is important.
Training employees on fire safety protocols is ess
A hazard site is a location where there is a potential risk of harm to people, property, or the environment.
Hazard sites can include industrial facilities, chemical plants, nuclear power plants, and construction sites.
These sites may contain hazardous materials, dangerous equipment, or unsafe conditions.
Proper safety measures and protocols must be followed at hazard sites to prevent accidents and injuries.
Examples of h...
I applied via Walk-in and was interviewed in Jul 2024. There was 1 interview round.
Bar bending schedule is a document that provides details of reinforcement steel bars used in construction projects.
It includes details such as bar mark, bar size, quantity, shape, and bending dimensions.
Helps in estimating the quantity of steel required for construction.
Ensures proper placement and bending of reinforcement bars as per design specifications.
Used by contractors, engineers, and construction workers for re...
28 days concrete strength is the standard measure of concrete's compressive strength after 28 days of curing.
28 days concrete strength is the standard measure of concrete's compressive strength after 28 days of curing
It is important for assessing the quality of concrete and its ability to support structural loads
The strength of concrete typically continues to increase beyond 28 days, but 28 days is the standard testing
Mivan is a modern construction technique using aluminum formwork, while conventional construction involves traditional methods like brick and mortar.
Mivan is faster and more efficient than conventional construction methods.
Mivan requires skilled labor for installation of aluminum formwork.
Conventional construction is more labor-intensive and time-consuming.
Mivan provides better quality finishes compared to conventional...
Self leveling concrete is a type of concrete that has a high flow consistency and is used to create smooth and level surfaces.
Self leveling concrete is designed to flow easily and settle into place without the need for troweling or leveling.
It is commonly used to level uneven floors before installing flooring materials such as tile or carpet.
Self leveling concrete can be applied in thicknesses ranging from a featheredg...
The 1st Aluform mockup concreting typically takes 1-2 days to complete.
1-2 days is the usual timeframe for 1st Aluform mockup concreting
Factors such as weather conditions, size of the mockup, and availability of resources can affect the duration
Proper planning and coordination can help expedite the process
based on 1 interview
Interview experience
based on 20 reviews
Rating in categories
Production Engineer
5
salaries
| ₹2.2 L/yr - ₹5 L/yr |
Manager
4
salaries
| ₹5.8 L/yr - ₹6.1 L/yr |
Assistant Manager
4
salaries
| ₹2.2 L/yr - ₹4.3 L/yr |
Design Engineer
4
salaries
| ₹2 L/yr - ₹3 L/yr |
Senior Engineer
4
salaries
| ₹3 L/yr - ₹3.5 L/yr |
Neptune Fairdeal Products
Green Kraft Agritech Solutions
KisanKraft Machine Tools
Sharp Garuda Farm Equipments