Filter interviews by
I applied via Referral and was interviewed before Dec 2022. There was 1 interview round.
G code and M code are programming languages used in CNC machines. Interpolation is the process of generating intermediate points between two given points. Orientation refers to the position and alignment of the tool or workpiece in the CNC machine.
G code is used to control the movement and functions of the CNC machine, while M code is used to control auxiliary functions.
Interpolation is used to create smooth and precis...
Top trending discussions
I applied via Naukri.com and was interviewed in Mar 2023. There were 3 interview rounds.
AI pros and cons discussion topic
posted on 16 Sep 2023
I applied via Approached by Company and was interviewed in Aug 2023. There were 4 interview rounds.
WI stands for Work Instruction, which is a detailed document that provides step-by-step instructions on how to perform a specific task or job.
Work Instructions are used to ensure consistency in processes and quality of output.
They typically include information such as materials needed, tools required, safety precautions, and specific steps to be followed.
Examples of Work Instructions include assembly instructions for a...
Cycle time production calculation is the total time it takes to produce one unit of a product.
Cycle time is calculated by dividing the total production time by the total number of units produced.
For example, if it takes 10 hours to produce 100 units, the cycle time would be 0.1 hours per unit.
Cycle time helps in identifying bottlenecks and improving efficiency in production processes.
FTT stands for First Time Through, a metric used to measure the percentage of products that pass inspection on the first attempt.
FTT is calculated by dividing the number of products that pass inspection on the first attempt by the total number of products inspected, then multiplying by 100 to get a percentage.
FTT is an important metric for measuring the efficiency and quality of production processes.
For example, if 90 ...
OEE stands for Overall Equipment Effectiveness, a metric used to measure the efficiency of a manufacturing process.
OEE takes into account three factors: availability, performance, and quality.
It is calculated by multiplying availability, performance, and quality percentages.
For example, if a machine is available 90% of the time, operates at 80% of its maximum speed, and produces good parts 95% of the time, the OEE woul
5s explaintion, what about kizen, TPM , 7QC tool, 8D ?
I applied via Naukri.com and was interviewed in Mar 2023. There were 3 interview rounds.
AI pros and cons discussion topic
posted on 17 May 2022
I'm sorry, but I don't understand the question. Could you please rephrase it?
Please clarify the question
I'm not sure what you mean by 'person shelf'
Could you provide more context or information?
based on 2 reviews
Rating in categories
Assistant Manager
31
salaries
| ₹6.2 L/yr - ₹15.1 L/yr |
Engineer
30
salaries
| ₹2.5 L/yr - ₹7.3 L/yr |
Deputy Manager
25
salaries
| ₹10.5 L/yr - ₹19 L/yr |
Senior Engineer
23
salaries
| ₹4 L/yr - ₹8 L/yr |
Executive Engineer
15
salaries
| ₹7 L/yr - ₹10.6 L/yr |
Alstom Transportation
Siemens
Bombardier Transportation
ABB