i
Expleo Solutions
Filter interviews by
I applied via Walk-in and was interviewed in Dec 2024. There were 2 interview rounds.
All the basic elements are.
All advance questions
Top trending discussions
I applied via LinkedIn and was interviewed in Nov 2021. There was 1 interview round.
Software life cycle is a process of developing software from planning to deployment and maintenance.
Planning and requirement analysis
Design and prototyping
Coding and implementation
Testing and quality assurance
Deployment and maintenance
Iterative process
Waterfall, Agile, and DevOps are common models
A test case (TC) is a set of steps to validate a specific functionality of the software.
Identify the functionality to be tested
Define the input data and expected output
Write step-by-step instructions to execute the test
Include preconditions and post-conditions
Ensure the TC is clear, concise, and unambiguous
Testing techniques are methods used to verify and validate software applications to ensure they meet requirements and function correctly.
Black box testing: Testing the functionality of a software application without knowledge of its internal code.
White box testing: Testing the internal logic and structure of a software application.
Regression testing: Re-running tests on previously tested software to ensure that new cha...
Regression is a software testing technique used to ensure that new code changes do not negatively impact existing functionality.
Regression testing involves re-running previously executed test cases to verify that new code changes have not introduced any new bugs or issues.
It helps ensure that the software continues to function correctly after modifications.
Regression testing can be automated to save time and effort.
Exa...
posted on 5 Feb 2022
I applied via Naukri.com and was interviewed before Feb 2021. There were 3 interview rounds.
Testing Life Cycle includes planning, designing, executing and reporting. Bug Life Cycle includes reporting, assigning, fixing and verifying.
Testing Life Cycle involves planning, designing, executing and reporting of tests.
Bug Life Cycle involves reporting, assigning, fixing and verifying bugs.
Testing Life Cycle starts with requirement analysis and ends with test closure.
Bug Life Cycle starts with bug reporting and end...
Severity is the impact of a bug on the system while priority is the urgency of fixing it.
Severity is the measure of how much a bug affects the system's functionality or performance.
Priority is the measure of how urgently a bug needs to be fixed.
A high severity bug may not have a high priority if it does not affect critical functionality.
A low severity bug may have a high priority if it affects critical functionality.
Bo...
Challenges faced during testing phase
Lack of clear requirements
Limited access to test environment
Time constraints
Difficulty in reproducing bugs
Integration issues with third-party systems
Lack of proper documentation
Testing on multiple platforms and devices
Dealing with unexpected errors
I applied via LinkedIn and was interviewed in Nov 2021. There was 1 interview round.
Software life cycle is a process of developing software from planning to deployment and maintenance.
Planning and requirement analysis
Design and prototyping
Coding and implementation
Testing and quality assurance
Deployment and maintenance
Iterative process
Waterfall, Agile, and DevOps are common models
A test case (TC) is a set of steps to validate a specific functionality of the software.
Identify the functionality to be tested
Define the input data and expected output
Write step-by-step instructions to execute the test
Include preconditions and post-conditions
Ensure the TC is clear, concise, and unambiguous
I applied via Referral and was interviewed before Jun 2023. There was 1 interview round.
STLC stands for Software Testing Life Cycle, which is a systematic approach to testing software.
STLC involves different phases such as requirement analysis, test planning, test design, test execution, and test closure.
Each phase has its own set of activities and deliverables.
STLC ensures that the software is thoroughly tested and meets the quality standards before release.
I applied via Naukri.com and was interviewed in Feb 2024. There was 1 interview round.
Some common testing tools include Selenium, JIRA, Postman, and TestRail.
Selenium - for automated testing of web applications
JIRA - for bug tracking and project management
Postman - for API testing
TestRail - for test case management and reporting
I applied via Naukri.com and was interviewed in Apr 2023. There were 2 interview rounds.
Regression testing is the process of retesting a software application to ensure that new code changes have not adversely affected existing functionality.
Regression testing is performed after code changes to verify that the existing features still work correctly.
It helps in identifying any defects introduced by new code changes.
Automated testing tools are often used for regression testing to save time and effort.
Example...
Smoke test is a preliminary test to check if the basic functionalities of a software application are working correctly.
Smoke test is a subset of regression testing.
It is usually performed after a build is deployed to ensure the critical functionalities are working.
Smoke test is not exhaustive and focuses on the most important features of the application.
It helps in identifying major issues early in the development cycl...
based on 1 interview
Interview experience
based on 5 reviews
Rating in categories
Software Engineer
439
salaries
| ₹2 L/yr - ₹10 L/yr |
Senior Software Engineer
321
salaries
| ₹4.5 L/yr - ₹15 L/yr |
Softwaretest Engineer
223
salaries
| ₹2 L/yr - ₹10.2 L/yr |
QA Associate
183
salaries
| ₹3 L/yr - ₹6.4 L/yr |
QA Coordinator
138
salaries
| ₹5.3 L/yr - ₹12.3 L/yr |
TCS
Wipro
Infosys
HCLTech