I applied via Recruitment Consulltant and was interviewed in Jan 2023. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - One-on-one 

(2 Questions)

  • Q1. For the contracting jobs projects. Designated interviewers will ask about the mechanical or civil projects for i.e. Piping, structural, Heat exchanger, pressure vessel, equipments heavy equipments, rotatar...
  • Q2. All about oil & gas and MEP.

Interview Preparation Tips

Interview preparation tips for other job seekers - All belongs to the particular position. The designated personal will assigned for the interview, the section head or manager will conducting the interviews.

Interview questions from similar companies

Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Company Website and was interviewed in Dec 2023. There was 1 interview round.

Round 1 - HR 

(4 Questions)

  • Q1. Diploma Regarding
  • Q2. Electrical information
  • Q3. What is the transformer. Transformer Working.
  • Ans. 

    A transformer is an electrical device that transfers electrical energy between two or more circuits through electromagnetic induction.

    • Transformers work on the principle of electromagnetic induction

    • They consist of two coils of wire, known as the primary and secondary windings

    • The primary winding is connected to the input voltage source, while the secondary winding is connected to the output load

    • The transformer changes th...

  • Answered by AI
  • Q4. What is resistor. What is the measure resistor without multimeter.
  • Ans. 

    A resistor is an electronic component that resists the flow of electrical current.

    • Resistors are used to control the amount of current flowing in a circuit.

    • The resistance of a resistor is measured in ohms (Ω).

    • One way to measure a resistor without a multimeter is by using a simple circuit with a known voltage source and an ammeter to measure the current flowing through the resistor.

    • Another method is to use a resistor col...

  • Answered by AI
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Company Website and was interviewed before Jan 2023. There were 2 interview rounds.

Round 1 - Technical 

(5 Questions)

  • Q1. What is free float & total float?
  • Ans. 

    Free float is the amount of time a task can be delayed without affecting the project's critical path. Total float is the total amount of time a task can be delayed without delaying the project's completion.

    • Free float is specific to an individual task, while total float is applicable to the entire project.

    • Free float is calculated by subtracting the early start date of a task from the early finish date of its successor t...

  • Answered by AI
  • Q2. What is critival path?
  • Ans. 

    Critical path is the longest sequence of activities in a project that determines the project's overall duration.

    • Critical path consists of activities that have zero slack or float time.

    • Any delay in activities on the critical path will directly impact the project's completion time.

    • Activities on the critical path must be closely monitored and managed to ensure timely project completion.

    • Critical path analysis helps in iden...

  • Answered by AI
  • Q3. What is look ahead and how find 1month look ahead in P6?
  • Ans. 

    Look ahead is a planning technique to anticipate future activities. In P6, the 1-month look ahead can be found using filters and layouts.

    • Look ahead is a proactive planning approach to identify and prepare for upcoming activities.

    • In P6, the 1-month look ahead can be created by applying filters and layouts to the project schedule.

    • Filters can be set to display activities that are scheduled within the next month.

    • Layouts ca...

  • Answered by AI
  • Q4. What is global change?
  • Ans. 

    Global change refers to the long-term alterations in the Earth's systems and processes due to human activities and natural factors.

    • Global change encompasses various interconnected phenomena such as climate change, biodiversity loss, deforestation, and pollution.

    • It involves both anthropogenic (human-induced) factors like greenhouse gas emissions and natural factors like volcanic eruptions.

    • Global change has wide-ranging ...

  • Answered by AI
  • Q5. Productivity rate of a welder ?
  • Ans. 

    The productivity rate of a welder refers to the amount of work they can complete in a given time period.

    • Productivity rate is measured in units of work per hour or per day.

    • Factors that can affect a welder's productivity rate include their skill level, the complexity of the welding task, and the availability of necessary equipment.

    • For example, an experienced welder may have a higher productivity rate than a novice welder...

  • Answered by AI
Round 2 - Assignment 

Asked to prepare a schedule of a building

Interview experience
4
Good
Difficulty level
Moderate
Process Duration
4-6 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed before Mar 2022. There were 4 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Aptitude Test 

General Aptitude and Fluid Mechanics

Round 3 - One-on-one 

(1 Question)

  • Q1. Tell about yourself?
Round 4 - Technical 

(1 Question)

  • Q1. Why should we Hire you?

Interview Preparation Tips

Interview preparation tips for other job seekers - Research about the company. Be thorough with your resume. Expect most questions and prepare for it. Show confidence and smile in your face
Interview experience
5
Excellent
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Approached by Company and was interviewed in Aug 2022. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Don’t add your photo or details such as gender, age, and address in your resume. These details do not add any value.
View all tips
Round 2 - Technical 

(2 Questions)

  • Q1. Code of fabrication and Installation, Fabrication Sequence with final dispatch erection site
  • Ans. 

    The code of fabrication and installation involves a sequence of steps from fabrication to dispatch and erection at the site.

    • The code of fabrication and installation outlines the standards and procedures for the entire process.

    • The fabrication sequence involves cutting, welding, and assembling the components according to the design specifications.

    • The final dispatch involves packaging and transportation of the fabricated ...

  • Answered by AI
  • Q2. First introduced, Self respect, job site bahavior workmanship with staff like technical

Interview Preparation Tips

Interview preparation tips for other job seekers - As per CV is weite documents for interview best not a failure of the other words
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Company Website and was interviewed in Dec 2023. There was 1 interview round.

Round 1 - HR 

(4 Questions)

  • Q1. Diploma Regarding
  • Q2. Electrical information
  • Q3. What is the transformer. Transformer Working.
  • Ans. 

    A transformer is an electrical device that transfers electrical energy between two or more circuits through electromagnetic induction.

    • Transformers work on the principle of electromagnetic induction

    • They consist of two coils of wire, known as the primary and secondary windings

    • The primary winding is connected to the input voltage source, while the secondary winding is connected to the output load

    • The transformer changes th...

  • Answered by AI
  • Q4. What is resistor. What is the measure resistor without multimeter.
  • Ans. 

    A resistor is an electronic component that resists the flow of electrical current.

    • Resistors are used to control the amount of current flowing in a circuit.

    • The resistance of a resistor is measured in ohms (Ω).

    • One way to measure a resistor without a multimeter is by using a simple circuit with a known voltage source and an ammeter to measure the current flowing through the resistor.

    • Another method is to use a resistor col...

  • Answered by AI
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Company Website and was interviewed before Jan 2023. There were 2 interview rounds.

Round 1 - Technical 

(5 Questions)

  • Q1. What is free float & total float?
  • Ans. 

    Free float is the amount of time a task can be delayed without affecting the project's critical path. Total float is the total amount of time a task can be delayed without delaying the project's completion.

    • Free float is specific to an individual task, while total float is applicable to the entire project.

    • Free float is calculated by subtracting the early start date of a task from the early finish date of its successor t...

  • Answered by AI
  • Q2. What is critival path?
  • Ans. 

    Critical path is the longest sequence of activities in a project that determines the project's overall duration.

    • Critical path consists of activities that have zero slack or float time.

    • Any delay in activities on the critical path will directly impact the project's completion time.

    • Activities on the critical path must be closely monitored and managed to ensure timely project completion.

    • Critical path analysis helps in iden...

  • Answered by AI
  • Q3. What is look ahead and how find 1month look ahead in P6?
  • Ans. 

    Look ahead is a planning technique to anticipate future activities. In P6, the 1-month look ahead can be found using filters and layouts.

    • Look ahead is a proactive planning approach to identify and prepare for upcoming activities.

    • In P6, the 1-month look ahead can be created by applying filters and layouts to the project schedule.

    • Filters can be set to display activities that are scheduled within the next month.

    • Layouts ca...

  • Answered by AI
  • Q4. What is global change?
  • Ans. 

    Global change refers to the long-term alterations in the Earth's systems and processes due to human activities and natural factors.

    • Global change encompasses various interconnected phenomena such as climate change, biodiversity loss, deforestation, and pollution.

    • It involves both anthropogenic (human-induced) factors like greenhouse gas emissions and natural factors like volcanic eruptions.

    • Global change has wide-ranging ...

  • Answered by AI
  • Q5. Productivity rate of a welder ?
  • Ans. 

    The productivity rate of a welder refers to the amount of work they can complete in a given time period.

    • Productivity rate is measured in units of work per hour or per day.

    • Factors that can affect a welder's productivity rate include their skill level, the complexity of the welding task, and the availability of necessary equipment.

    • For example, an experienced welder may have a higher productivity rate than a novice welder...

  • Answered by AI
Round 2 - Assignment 

Asked to prepare a schedule of a building

Interview experience
4
Good
Difficulty level
Moderate
Process Duration
4-6 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed before Mar 2022. There were 4 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Properly align and format text in your resume. A recruiter will have to spend more time reading poorly aligned text, leading to high chances of rejection.
View all tips
Round 2 - Aptitude Test 

General Aptitude and Fluid Mechanics

Round 3 - One-on-one 

(1 Question)

  • Q1. Tell about yourself?
Round 4 - Technical 

(1 Question)

  • Q1. Why should we Hire you?

Interview Preparation Tips

Interview preparation tips for other job seekers - Research about the company. Be thorough with your resume. Expect most questions and prepare for it. Show confidence and smile in your face

I applied via Company Website and was interviewed in Jul 2021. There were 3 interview rounds.

Interview Questionnaire 

1 Question

  • Q1. How will you plan a project.

Interview Preparation Tips

Interview preparation tips for other job seekers - Be confident and know your work
Interview experience
4
Good
Difficulty level
-
Process Duration
-
Result
-
Round 1 - HR 

(1 Question)

  • Q1. Rehire so only salary negotiations

Expertise Contracting Company Interview FAQs

How many rounds are there in Expertise Contracting Company Planning Engineer interview?
Expertise Contracting Company interview process usually has 2 rounds. The most common rounds in the Expertise Contracting Company interview process are Resume Shortlist and One-on-one Round.
What are the top questions asked in Expertise Contracting Company Planning Engineer interview?

Some of the top questions asked at the Expertise Contracting Company Planning Engineer interview -

  1. For the contracting jobs projects. Designated interviewers will ask about the m...read more
  2. All about oil & gas and M...read more

Tell us how to improve this page.

Expertise Contracting Company Planning Engineer Salary
based on 27 salaries
₹6 L/yr - ₹14.5 L/yr
52% more than the average Planning Engineer Salary in India
View more details

Expertise Contracting Company Planning Engineer Reviews and Ratings

based on 4 reviews

2.7/5

Rating in categories

3.1

Skill development

2.2

Work-Life balance

2.2

Salary & Benefits

3.5

Job Security

3.1

Company culture

2.4

Promotions/Appraisal

2.9

Work Satisfaction

Explore 4 Reviews and Ratings
Safety Officer
39 salaries
unlock blur

₹2.1 L/yr - ₹11 L/yr

Planning Engineer
27 salaries
unlock blur

₹6 L/yr - ₹14.5 L/yr

Mechanical Supervisor
25 salaries
unlock blur

₹6 L/yr - ₹15 L/yr

Mechanical Engineer
24 salaries
unlock blur

₹3.6 L/yr - ₹14 L/yr

Project Engineer
13 salaries
unlock blur

₹3.8 L/yr - ₹14 L/yr

Explore more salaries
Compare Expertise Contracting Company with

Larsen & Toubro Limited

4.0
Compare

TCS

3.7
Compare

Hindustan Construction Company

4.2
Compare

Shapoorji Pallonji Group

4.2
Compare

Calculate your in-hand salary

Confused about how your in-hand salary is calculated? Enter your annual salary (CTC) and get your in-hand salary
Did you find this page helpful?
Yes No
write
Share an Interview