Filter interviews by
I appeared for an interview in Jun 2023.
Top trending discussions
posted on 11 Feb 2025
I applied via Walk-in and was interviewed in May 2021. There was 1 interview round.
Solar panels are not currently being used in the checking area.
No solar panels are installed in the checking area
The area is powered by traditional electricity sources
There are no plans to install solar panels in the near future
I applied via Approached by Company and was interviewed before Feb 2021. There was 1 interview round.
posted on 22 Dec 2024
I applied via Referral and was interviewed in Jun 2024. There were 2 interview rounds.
posted on 31 Jan 2022
I applied via Referral and was interviewed in Jul 2021. There were 3 interview rounds.
based on 2 interviews
Interview experience
based on 7 reviews
Rating in categories
Project Manager
8
salaries
| ₹0 L/yr - ₹0 L/yr |
Project Engineer
4
salaries
| ₹0 L/yr - ₹0 L/yr |
Assistant Project Manager
4
salaries
| ₹0 L/yr - ₹0 L/yr |
Electrical Design Engineer
4
salaries
| ₹0 L/yr - ₹0 L/yr |
Electrical Project Engineer
3
salaries
| ₹0 L/yr - ₹0 L/yr |
Aqua Tech Systems
Mb Power (m.p)
Solarig Gensol Utilities
Swastik Enterprises