I applied via Approached by Company and was interviewed in Jun 2024. There was 1 interview round.
I applied via Naukri.com and was interviewed before Jul 2023. There was 1 interview round.
Efficiency of electrical power can be increased by reducing energy losses and improving power generation and distribution systems.
Implementing energy-efficient technologies and equipment
Reducing transmission and distribution losses
Optimizing power generation processes
Implementing smart grid technologies
Using renewable energy sources
Improving power factor correction
Important observations during earth pit and flat execution include soil conditions, depth, size, materials used, and proper installation techniques.
Check soil conditions to ensure proper grounding
Verify the depth of the earth pit to meet requirements
Ensure the size of the earth pit is sufficient for the application
Use appropriate materials such as copper rods for better conductivity
Follow proper installation techniques
I applied via Approached by Company and was interviewed before Mar 2021. There were 3 interview rounds.
posted on 27 Jan 2021
posted on 11 Aug 2023
I applied via LinkedIn and was interviewed in Jul 2023. There were 4 interview rounds.
Technical,business & Project related case study
I applied via Naukri.com and was interviewed before Aug 2021. There were 3 interview rounds.
General awareness,maths,electrical,solar
I applied via Approached by Company and was interviewed in Jun 2024. There was 1 interview round.
I applied via Naukri.com and was interviewed before Jul 2023. There was 1 interview round.
Efficiency of electrical power can be increased by reducing energy losses and improving power generation and distribution systems.
Implementing energy-efficient technologies and equipment
Reducing transmission and distribution losses
Optimizing power generation processes
Implementing smart grid technologies
Using renewable energy sources
Improving power factor correction
Important observations during earth pit and flat execution include soil conditions, depth, size, materials used, and proper installation techniques.
Check soil conditions to ensure proper grounding
Verify the depth of the earth pit to meet requirements
Ensure the size of the earth pit is sufficient for the application
Use appropriate materials such as copper rods for better conductivity
Follow proper installation techniques
I applied via Approached by Company and was interviewed before Mar 2021. There were 3 interview rounds.
based on 2 interviews
Interview experience
Project Manager
8
salaries
| ₹6.2 L/yr - ₹9.4 L/yr |
Project Engineer
4
salaries
| ₹2.5 L/yr - ₹5 L/yr |
Assistant Project Manager
4
salaries
| ₹5.4 L/yr - ₹7.5 L/yr |
Electrical Design Engineer
4
salaries
| ₹2.5 L/yr - ₹6 L/yr |
Costing Engineer
4
salaries
| ₹1.8 L/yr - ₹5.4 L/yr |
Aqua Tech Systems
Mb Power (m.p)
Solarig Gensol Utilities
Swastik Enterprises