I applied via Monster and was interviewed before Oct 2020. There were 3 interview rounds.
Yes, electrical load calculation is the process of determining the amount of power that a building or electrical system requires.
Electrical load calculation involves considering the power requirements of various electrical devices and appliances in a building or system.
Factors such as voltage, current, and power factor are taken into account during the calculation.
Load calculation helps in determining the appropriate s...
Developed a new power distribution system for a large manufacturing plant, resulting in a 20% increase in efficiency.
Designed and implemented a new power distribution system for a large manufacturing plant
Collaborated with a team of engineers and technicians to ensure successful installation and operation
Resulted in a 20% increase in efficiency and significant cost savings for the company
posted on 16 Dec 2023
I applied via Approached by Company and was interviewed before Jul 2022. There were 3 interview rounds.
I applied via Recruitment Consulltant and was interviewed before Sep 2021. There were 2 interview rounds.
posted on 17 Mar 2021
I applied via Naukri.com and was interviewed in Feb 2021. There was 1 interview round.
Motor feeder and power feeder requirements are essential for electrical design engineers to ensure proper functioning of electrical systems.
Motor feeder requirements include selecting the appropriate motor size, voltage, and current rating.
Power feeder requirements involve determining the load requirements and selecting the appropriate cable size and voltage drop.
Proper coordination and protection devices such as circu...
Hazardous area classification involves categorizing areas based on the presence of flammable gases, vapors, or dusts.
Hazardous areas are classified based on the likelihood of the presence of flammable substances.
Temperature Class refers to the maximum surface temperature of equipment that can be used in a hazardous area.
Hazardous areas are categorized into zones based on the frequency and duration of the presence of fl...
1.25 FLA is taken for circuit breaker and 1.5 times for contactor to ensure protection against overloading and short circuits.
1.25 FLA is the maximum current that a circuit breaker can handle without tripping.
1.5 times FLA is taken for contactor to ensure that it can handle the inrush current during motor starting.
This also provides protection against short circuits and overloading.
For example, if the full load current...
Percentage Impedance is a measure of the voltage drop in a transformer during a short circuit. It determines the ability of the transformer to withstand short circuit currents.
Percentage Impedance is the ratio of the rated voltage of a transformer to the short circuit current at its terminals, expressed as a percentage.
It represents the internal impedance of the transformer and is usually provided by the manufacturer.
A...
Protection schemes for transformers and generators.
Overcurrent protection
Differential protection
Distance protection
Restricted earth fault protection
Backup protection
Buchholz relay protection
Thermal overload protection
Under/over voltage protection
Neutral grounding protection
Cable sizing is calculated using the formula for voltage drop, which takes into account resistive and inductive drop. Voltage drop is limited to 5% to ensure efficient power transmission.
Cable sizing is determined by calculating the voltage drop using the formula: VD = (I * L * R * 2) / 1000
Resistive drop is calculated using Ohm's Law: Vr = I * R
Inductive drop is calculated using the formula: Vi = I * X
Voltage drop is ...
Earthing calculation standards and resistances for substation and lightning protection.
Earthing calculation involves determining the resistance of the earth electrode system.
The standard used for earthing calculation is IEEE 80.
The resistance in substation should be less than 1 ohm.
The resistance for lightning protection should be less than 10 ohms.
Factors affecting earthing calculation include soil resistivity, electr...
The motor contribution to the short circuit current is significant and needs to be considered in electrical design.
The motor's impedance affects the short circuit current level.
The motor's starting current can cause a significant increase in short circuit current.
The motor's location in the electrical system can affect its contribution to the short circuit current.
The motor's size and type can also impact its contribut...
Types of contactors include AC, DC, reversing, and definite purpose. Maximum efficiency of transformer depends on load and design.
AC contactors are used for alternating current circuits
DC contactors are used for direct current circuits
Reversing contactors are used to reverse the direction of current flow
Definite purpose contactors are designed for specific applications
Maximum efficiency of transformer is achieved at fu...
Non-linear loads are electrical devices that do not have a linear relationship between the voltage and current.
Non-linear loads draw non-sinusoidal current waveforms.
They can cause harmonic distortion in the electrical system.
Examples of non-linear loads include computers, televisions, and variable speed drives.
Linear loads have a linear relationship between voltage and current, such as incandescent light bulbs.
Linear
Explanation of lighting calculation, light loss factor, utilisation factor, and minimum lux required in substation.
Lighting calculation involves determining the amount of light required in a space.
Light loss factor is the reduction in light output due to factors such as dirt, dust, and aging of lamps.
Utilisation factor is the ratio of light received by a surface to the total light output of the lamps.
Formula for lighti...
APFC stands for Automatic Power Factor Correction. Series reactor is a device used to limit current flow.
APFC is a system that automatically corrects the power factor of an electrical network.
It uses capacitors to improve the power factor and reduce energy consumption.
Series reactor is a device that is used to limit the flow of current in a circuit.
It is used to protect equipment from overvoltage and to reduce harmonic...
posted on 27 Jul 2024
I applied via Campus Placement and was interviewed before Jul 2023. There were 2 interview rounds.
Technical test of 1 hr
I am an experienced Electrical Design Engineer with a strong background in designing and implementing electrical systems.
I have a Bachelor's degree in Electrical Engineering from XYZ University.
I have worked for 5+ years in the field, designing electrical systems for commercial buildings.
I am proficient in AutoCAD and other design software, ensuring accurate and efficient designs.
I have a strong understanding of electr...
I appeared for an interview before Feb 2024.
posted on 27 Sep 2023
I applied via Referral and was interviewed before Sep 2022. There were 2 interview rounds.
System studies involve analyzing and evaluating the performance of electrical systems to ensure efficiency and reliability.
System studies involve analyzing the behavior of electrical systems under different operating conditions.
They help identify potential issues and optimize the performance of the system.
Examples of system studies include load flow analysis, short circuit analysis, and protection coordination studies.
Load flow study is a method used in electrical engineering to analyze and calculate the flow of power in an electrical network.
Load flow study helps in determining the steady-state operating conditions of a power system.
It involves calculating the voltage magnitude and phase angle at each bus in the network.
The study considers factors like power generation, transmission line losses, and load demand.
It helps in identify...
based on 1 interview
Interview experience
based on 6 reviews
Rating in categories
Project Engineer
32
salaries
| ₹3.2 L/yr - ₹6.2 L/yr |
Graduate Engineer Trainee (Get)
24
salaries
| ₹2.5 L/yr - ₹3.8 L/yr |
Site Engineer
17
salaries
| ₹2.3 L/yr - ₹7.6 L/yr |
Assistant Manager
16
salaries
| ₹7.1 L/yr - ₹14.3 L/yr |
Electrical Engineer
14
salaries
| ₹2.6 L/yr - ₹6 L/yr |
Sterling & Wilson
Nasser S. Al Hajri Corporation
Ramky Infrastructure
L & W Constructions