I applied via Company Website and was interviewed in Oct 2022. There were 2 interview rounds.
I have experience in all aspects of HVAC system work, including installation, maintenance, and repair.
Installation of HVAC systems
Maintenance of HVAC systems
Repair of HVAC systems
Knowledge of HVAC controls and automation
Familiarity with HVAC equipment and tools
Experience with HVAC load calculations and system design
Understanding of HVAC codes and regulations
Ability to troubleshoot HVAC issues
Experience with refrigerati...
Top trending discussions
I applied via Walk-in and was interviewed before Jul 2020. There were 4 interview rounds.
posted on 22 Feb 2022
posted on 10 Nov 2021
I will assess the situation and take necessary actions to minimize the impact on the project timeline.
Check with the supplier for the reason of delay and expected delivery date
Evaluate the impact on the project timeline and inform the project team
Explore alternative options such as sourcing from a different supplier or adjusting the project schedule
Communicate the revised plan to all stakeholders and ensure timely deli...
To calculate cement and sand for 1 sqm cm 1:4, use the formula: (1/5.5) * 1 = 0.18 cubic meters of cement and (4/5.5) * 1 = 0.73 cubic meters of sand.
The ratio of cement to sand is 1:4
Calculate the total volume of the mixture, which is 1 sqm cm
Divide the total volume by the sum of the ratio (1+4=5)
Multiply the quotient by the individual ratio to get the volume of cement and sand
Convert the volume to weight using the de
Price escalation refers to the increase in the price of goods or services over time.
It is a common phenomenon in the market due to inflation, changes in demand and supply, and other economic factors.
Price escalation can also occur due to changes in the cost of production, such as raw material costs, labor costs, and transportation costs.
For example, the price of gasoline may escalate due to an increase in the cost of c...
posted on 13 Aug 2022
I applied via Approached by Company and was interviewed in Jul 2022. There was 1 interview round.
My strength is my ability to lead and motivate a team towards achieving goals.
Effective communication skills
Strong decision-making abilities
Ability to delegate tasks efficiently
Positive attitude towards challenges
Experience in managing teams
Motivational skills
Goal-oriented mindset
I applied via Walk-in and was interviewed in Apr 2023. There were 2 interview rounds.
posted on 29 Dec 2023
I applied via Walk-in and was interviewed before Dec 2022. There were 2 interview rounds.
I applied via Walk-in and was interviewed in Aug 2023. There were 4 interview rounds.
A chiller is a machine that removes heat from a liquid via a vapor-compression or absorption refrigeration cycle.
Chillers are commonly used in air conditioning systems to cool buildings or industrial processes.
They work by transferring heat from the liquid being chilled to a separate fluid, which is then circulated through a heat exchanger to cool it down.
Chillers can be water-cooled or air-cooled, depending on the app
Salary and job responsibilities
I applied via Walk-in
About your job, location, CTC
I applied via Walk-in and was interviewed in Apr 2023. There were 2 interview rounds.
Construction procedure involves planning, designing, obtaining permits, site preparation, foundation construction, framing, finishing, and inspections.
Planning and designing the project
Obtaining necessary permits
Site preparation and excavation
Foundation construction
Framing and structural work
Installation of utilities and systems
Finishing touches such as painting and flooring
Final inspections and approvals
Beam lapping position refers to the location where two beams overlap or intersect in a structural element.
Beam lapping position is important for ensuring structural integrity and load-bearing capacity.
Common beam lapping positions include end-to-end, side-by-side, and staggered lapping.
Proper beam lapping position is determined by engineering calculations and design specifications.
The tile procedure is a method used in computer graphics to fill a region with a repeating pattern or image.
The tile procedure involves dividing the region into smaller tiles and filling each tile with the desired pattern or image.
It is commonly used in graphic design software to create seamless textures or backgrounds.
The size and shape of the tiles can be adjusted to achieve different visual effects.
Examples of tile ...
Project Engineer
32
salaries
| ₹3.2 L/yr - ₹6.2 L/yr |
Graduate Engineer Trainee (Get)
24
salaries
| ₹2.5 L/yr - ₹3.8 L/yr |
Site Engineer
17
salaries
| ₹2.3 L/yr - ₹7.6 L/yr |
Assistant Manager
16
salaries
| ₹7.1 L/yr - ₹14.3 L/yr |
Electrical Engineer
14
salaries
| ₹2.6 L/yr - ₹6 L/yr |
Sterling & Wilson
Nasser S. Al Hajri Corporation
Ramky Infrastructure
L & W Constructions