I applied via Walk-in and was interviewed in Jul 2024. There was 1 interview round.
Bar bending schedule is a document that provides details of reinforcement steel bars used in construction projects.
It includes details such as bar mark, bar size, quantity, shape, and bending dimensions.
Helps in estimating the quantity of steel required for construction.
Ensures proper placement and bending of reinforcement bars as per design specifications.
Used by contractors, engineers, and construction workers for re...
28 days concrete strength is the standard measure of concrete's compressive strength after 28 days of curing.
28 days concrete strength is the standard measure of concrete's compressive strength after 28 days of curing
It is important for assessing the quality of concrete and its ability to support structural loads
The strength of concrete typically continues to increase beyond 28 days, but 28 days is the standard testing
Mivan is a modern construction technique using aluminum formwork, while conventional construction involves traditional methods like brick and mortar.
Mivan is faster and more efficient than conventional construction methods.
Mivan requires skilled labor for installation of aluminum formwork.
Conventional construction is more labor-intensive and time-consuming.
Mivan provides better quality finishes compared to conventional...
Self leveling concrete is a type of concrete that has a high flow consistency and is used to create smooth and level surfaces.
Self leveling concrete is designed to flow easily and settle into place without the need for troweling or leveling.
It is commonly used to level uneven floors before installing flooring materials such as tile or carpet.
Self leveling concrete can be applied in thicknesses ranging from a featheredg...
The 1st Aluform mockup concreting typically takes 1-2 days to complete.
1-2 days is the usual timeframe for 1st Aluform mockup concreting
Factors such as weather conditions, size of the mockup, and availability of resources can affect the duration
Proper planning and coordination can help expedite the process
I applied via Referral and was interviewed in Aug 2024. There was 1 interview round.
Stop work application is a procedure used to halt work activities due to safety concerns or violations.
Stop work applications are typically used when there is an imminent danger to workers or the environment.
Workers are trained to recognize when a stop work application is necessary and how to properly implement it.
Examples of reasons for a stop work application include unsafe working conditions, equipment malfunctions,
Scaffolding is a temporary structure used to support workers and materials during construction or maintenance work.
Scaffolding provides a safe working platform at height
It is typically made of metal or wood
Different types include tube and coupler, frame, and system scaffolding
Scaffolding must be inspected regularly for safety
Types of scaffolding include supported scaffolding, suspended scaffolding, and aerial lifts.
Supported scaffolding is the most common type and is supported by the ground or a building structure.
Suspended scaffolding hangs from the roof or top of a building and is commonly used for window washing or painting.
Aerial lifts are platforms lifted by cranes or other equipment and are commonly used for tasks at height.
Other typ...
Types of accidents/incidents include slips, trips, falls, machinery accidents, chemical exposures, and fires.
Slips, trips, and falls are common in workplaces due to wet floors, cluttered walkways, or uneven surfaces.
Machinery accidents can occur when proper safety procedures are not followed or equipment malfunctions.
Chemical exposures may result from spills, leaks, or improper handling of hazardous substances.
Fires ca...
posted on 3 May 2024
I applied via Indeed and was interviewed in Apr 2024. There were 3 interview rounds.
posted on 15 Jun 2024
posted on 4 Aug 2024
Technical questions, mechanical question
I prefer a location that is easily accessible by public transportation and close to amenities.
Prefer location with good public transportation access
Close to amenities such as grocery stores, restaurants, etc.
Consider proximity to workplace or schools if applicable
posted on 14 Oct 2023
I applied via Walk-in and was interviewed in Sep 2023. There were 2 interview rounds.
The weight of green concrete varies depending on the mix design and components used.
The weight of green concrete typically ranges from 140 to 150 pounds per cubic foot.
Factors such as the type and amount of aggregates, cement, water, and admixtures used can affect the weight.
Lightweight concrete can have a lower weight, while high-density concrete can be heavier.
The weight of green concrete is important for structural
The formula for tensile strength of concrete is based on the cross-sectional area and maximum load applied.
Tensile Strength = Maximum Load / Cross-sectional Area
The units for tensile strength are typically in MPa (megapascals)
Tensile strength is an important property of concrete for determining its ability to resist tension forces
For example, if a concrete specimen with a cross-sectional area of 100 square millimeters ...
The water cement ratio of concrete refers to the ratio of the weight of water to the weight of cement used in a concrete mix.
The water cement ratio is a crucial factor in determining the strength and durability of concrete.
A lower water cement ratio results in stronger and more durable concrete.
The ideal water cement ratio varies depending on the type of concrete mix and its intended use.
For example, a typical water ce...
IS code of steel refers to the Indian Standard code for steel materials and products.
IS 2062:2011 - Steel for general structural purposes
IS 1786:2008 - High strength deformed steel bars and wires for concrete reinforcement
IS 8500:1991 - Structural steel - Microalloyed (medium and high strength qualities)
I applied via campus placement at KLN College of Engineering, Konthagai and was interviewed in Mar 2024. There were 3 interview rounds.
Question from your core only plus some aptitude
Goes smoothly and topic is given by hr
posted on 3 Jan 2024
I applied via Recruitment Consulltant and was interviewed in Dec 2023. There was 1 interview round.
The work site can be controlled by multiple parties including the employer, safety supervisor, and workers.
The employer has the ultimate responsibility for controlling the work site and ensuring safety measures are in place.
The safety supervisor plays a crucial role in implementing and enforcing safety protocols.
Workers also have a responsibility to follow safety guidelines and report any hazards or concerns.
Other part...
I applied via Company Website and was interviewed in Feb 2024. There was 1 interview round.
A test designted to determine a persons ability in a perticular person skills are field of knowledge.
posted on 2 Jun 2023
PTR stands for Project Technical Report.
PTR is a document that summarizes the technical aspects of a project.
It includes details such as project scope, objectives, methodology, results, and conclusions.
PTRs are often used to communicate project progress and findings to stakeholders.
LT pole election rule refers to the guidelines and regulations for selecting and installing low tension electrical poles.
LT pole election rule specifies the criteria for selecting the appropriate location for installing low tension electrical poles.
It includes factors such as distance from buildings, roadways, and other structures, as well as soil conditions and accessibility.
Compliance with LT pole election rule ensur...
Coil earthing is a method of grounding electrical systems to prevent electric shock and ensure safety.
Coil earthing involves burying a coil of wire in the ground to create a low-resistance path for electrical currents to flow safely.
The depth at which the coil should be buried depends on factors such as soil type, moisture content, and local regulations.
Proper installation of coil earthing is essential to protect equip...
based on 8 reviews
Rating in categories
Billing Engineer
5
salaries
| ₹4.8 L/yr - ₹8 L/yr |
Project Manager Civil
4
salaries
| ₹7.8 L/yr - ₹7.8 L/yr |
Site Engineer
3
salaries
| ₹3.3 L/yr - ₹5 L/yr |
Civil Site Engineer
3
salaries
| ₹3 L/yr - ₹5 L/yr |
Lea Associates South Asia
McNally Bharat Engineering
ABCI Infrastructures
R.V.R. PROJECTS