Filter interviews by
I applied via Naukri.com and was interviewed in Aug 2024. There were 2 interview rounds.
The total cost of a residential building per built up area depends on various factors such as location, materials used, labor costs, and amenities.
Total cost = Cost of land + Cost of construction + Cost of amenities
Cost of land can vary greatly depending on location and size of the plot
Cost of construction includes materials, labor, and overhead expenses
Cost of amenities such as landscaping, parking, and utilities shou...
ERP systems are commonly used in Real Estate for management budgeting.
ERP systems help in integrating financial data for better budgeting and forecasting in Real Estate.
They streamline processes like expense tracking, revenue management, and financial reporting.
Examples of ERP systems used in Real Estate include Yardi, MRI Software, and RealPage.
These systems provide real-time insights and analytics to make informed bu
Cost calculation per built up area of Civil works involves determining the total cost of construction per unit area.
Calculate the total cost of construction including materials, labor, equipment, and overhead expenses.
Divide the total cost by the built up area to get the cost per unit area.
Consider factors such as site conditions, complexity of design, and local market rates.
Example: Total cost of construction is $100,...
The thumb rule for calculation of mivan shuttering per sqft of built up area is typically around 0.15 to 0.20 sqft per sqft of built up area.
The thumb rule for mivan shuttering is generally around 0.15 to 0.20 sqft per sqft of built up area.
This rule may vary depending on the complexity of the structure and other factors.
For example, for a simple structure, the mivan shuttering calculation may be closer to 0.15 sqft pe...
Lap zone in column refers to the overlapping region where two reinforcement bars are spliced together.
Lap zone is typically located in the middle third of the column height for better load distribution.
Proper lap length and lap splice configuration are crucial for structural integrity.
Lap splices are commonly used in reinforced concrete columns to achieve required strength.
Lap length is determined based on the diameter...
Anchorage length in BBS refers to the length of reinforcement bar required to transfer the load from the bar to the concrete.
Anchorage length is determined based on the diameter of the reinforcement bar and the type of load it will be subjected to.
It is essential to ensure proper anchorage length to prevent failure of the structure.
Anchorage length is typically specified in building codes and design standards.
For examp...
The rate of Mivan shuttering per Sqm includes both material and labor costs.
The rate of Mivan shuttering per Sqm can vary depending on factors such as location, project size, and contractor rates.
Material costs for Mivan shuttering may include aluminum formwork panels, pins, wedges, and other accessories.
Labor costs for Mivan shuttering involve the installation, dismantling, and maintenance of the formwork system.
For e...
The coefficient of steel and concrete refers to the thermal expansion properties of these materials.
The coefficient of thermal expansion for steel is typically around 12 x 10^-6 /°C.
The coefficient of thermal expansion for concrete is typically around 10 x 10^-6 /°C.
These coefficients are important to consider when designing structures to account for temperature changes.
I am currently earning $70,000 per year.
My current salary is $70,000 per year.
I am open to discussing salary expectations for this position.
I believe my skills and experience align with the salary range for this role.
The expected salary for a Cost Estimation Engineer can vary depending on factors such as experience, location, and company size.
Expected salary can range from $60,000 to $100,000 per year.
Factors influencing salary include years of experience, level of education, and industry.
Cost Estimation Engineers in larger cities or high-demand industries may earn higher salaries.
Negotiation skills can also play a role in determin
I applied via Walk-in and was interviewed in Apr 2021. There were 4 interview rounds.
I applied via Naukri.com and was interviewed in Apr 2021. There were 3 interview rounds.
I applied via Naukri.com and was interviewed before Oct 2020. There were 4 interview rounds.
I appeared for an interview before Dec 2020.
Round duration - 90 Minutes
Round difficulty - Medium
2 coding questions and 20 mcq
You are given a grid containing oranges where each cell of the grid can contain one of the three integer values:
Find the minimum time required to rot all fresh oranges in a grid.
Use Breadth First Search (BFS) to simulate the rotting process.
Track the time taken to rot all oranges and return -1 if any fresh oranges remain.
Handle edge cases like no fresh oranges or all oranges already rotten.
Consider using a queue to efficiently process adjacent oranges.
Ensure to update the grid with the new state of oranges after each second.
Given a natural number N
, return the sum of all its proper divisors.
A proper divisor of Y
is defined as a number X
such that X < Y
and Y % X = 0
.
T...
Calculate the sum of proper divisors of a given natural number.
Iterate from 1 to sqrt(N) and check for divisors
If a divisor is found, add it to the sum and also add N/divisor if it is not the same as divisor
Return the sum as the result
Round duration - 45 Minutes
Round difficulty - Medium
Technical interview
Given an array ARR
consisting of non-negative integers, rearrange the numbers to form the largest possible number. The digits within each number cannot be changed.
Rearrange the array elements to form the largest possible number by concatenating them.
Sort the array elements in a custom comparator function to get the largest number.
Convert the sorted array elements to strings and concatenate them to form the final number.
Handle cases where the numbers have the same prefix by comparing the concatenated forms.
Tip 1 : Be clear about whatever you have mentioned in resume, don't mention buzz words, because interviewer can go in depth
Tip 2 : Along with DS and Algo, if you have 3-4 months experience or internship experience, then be ready to answer scenario based technical questions like scaling the application that you developed and design concepts that can be used for improving
Tip 3 : Last but most important tip is to be calm through out the whole process ,don't loose hope if any round didn't go well ,if you have explained your thought process there is still chance to procees to next round so keep preparating for next rounds.
Tip 1 : Keep it one page resume and mention keywords which align with your technical and personal competencies.
Tip 2 : Mention 3-4 projects in the order that , project which you can explain best should be at top,then the next, and so on.
I applied via Campus Placement and was interviewed before Jun 2021. There were 3 interview rounds.
Round 1 is quit easy , only verbal ability is little bit difficult. So anyone can easy to qualify round.
I applied via Referral and was interviewed in Dec 2020. There were 3 interview rounds.
I applied via Recruitment Consultant and was interviewed in Mar 2021. There was 1 interview round.
Some of the top questions asked at the Esbee Realty Cost Estimation Engineer interview -
based on 1 interview
Interview experience
TCS
Accenture
Wipro
Cognizant