Upload Button Icon Add office photos

Filter interviews by

Esbee Realty Cost Estimation Engineer Interview Questions, Process, and Tips

Updated 28 Sep 2024

Esbee Realty Cost Estimation Engineer Interview Experiences

1 interview found

Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Not Selected

I applied via Naukri.com and was interviewed in Aug 2024. There were 2 interview rounds.

Round 1 - Technical 

(10 Questions)

  • Q1. What is the total cost of a residential building per built up area ?
  • Ans. 

    The total cost of a residential building per built up area depends on various factors such as location, materials used, labor costs, and amenities.

    • Total cost = Cost of land + Cost of construction + Cost of amenities

    • Cost of land can vary greatly depending on location and size of the plot

    • Cost of construction includes materials, labor, and overhead expenses

    • Cost of amenities such as landscaping, parking, and utilities shou...

  • Answered by AI
  • Q2. Rate analysis- aluminum window , plaster , blockwork
  • Q3. ERP for management budgeting in Real Estate
  • Ans. 

    ERP systems are commonly used in Real Estate for management budgeting.

    • ERP systems help in integrating financial data for better budgeting and forecasting in Real Estate.

    • They streamline processes like expense tracking, revenue management, and financial reporting.

    • Examples of ERP systems used in Real Estate include Yardi, MRI Software, and RealPage.

    • These systems provide real-time insights and analytics to make informed bu

  • Answered by AI
  • Q4. Cost calculation per built up area of Civil works ?
  • Ans. 

    Cost calculation per built up area of Civil works involves determining the total cost of construction per unit area.

    • Calculate the total cost of construction including materials, labor, equipment, and overhead expenses.

    • Divide the total cost by the built up area to get the cost per unit area.

    • Consider factors such as site conditions, complexity of design, and local market rates.

    • Example: Total cost of construction is $100,...

  • Answered by AI
  • Q5. Bar bending schedule ?
  • Q6. Thumb rule for calculation of mivan shuttering per sqft of built up area ?
  • Ans. 

    The thumb rule for calculation of mivan shuttering per sqft of built up area is typically around 0.15 to 0.20 sqft per sqft of built up area.

    • The thumb rule for mivan shuttering is generally around 0.15 to 0.20 sqft per sqft of built up area.

    • This rule may vary depending on the complexity of the structure and other factors.

    • For example, for a simple structure, the mivan shuttering calculation may be closer to 0.15 sqft pe...

  • Answered by AI
  • Q7. Lap zone in column ?
  • Ans. 

    Lap zone in column refers to the overlapping region where two reinforcement bars are spliced together.

    • Lap zone is typically located in the middle third of the column height for better load distribution.

    • Proper lap length and lap splice configuration are crucial for structural integrity.

    • Lap splices are commonly used in reinforced concrete columns to achieve required strength.

    • Lap length is determined based on the diameter...

  • Answered by AI
  • Q8. What is anchorage length in BBS ?
  • Ans. 

    Anchorage length in BBS refers to the length of reinforcement bar required to transfer the load from the bar to the concrete.

    • Anchorage length is determined based on the diameter of the reinforcement bar and the type of load it will be subjected to.

    • It is essential to ensure proper anchorage length to prevent failure of the structure.

    • Anchorage length is typically specified in building codes and design standards.

    • For examp...

  • Answered by AI
  • Q9. Rate of mivan shuttering per Sqm ( Material + Labour ) ?
  • Ans. 

    The rate of Mivan shuttering per Sqm includes both material and labor costs.

    • The rate of Mivan shuttering per Sqm can vary depending on factors such as location, project size, and contractor rates.

    • Material costs for Mivan shuttering may include aluminum formwork panels, pins, wedges, and other accessories.

    • Labor costs for Mivan shuttering involve the installation, dismantling, and maintenance of the formwork system.

    • For e...

  • Answered by AI
  • Q10. Coefficient of Steel & Concrete ?
  • Ans. 

    The coefficient of steel and concrete refers to the thermal expansion properties of these materials.

    • The coefficient of thermal expansion for steel is typically around 12 x 10^-6 /°C.

    • The coefficient of thermal expansion for concrete is typically around 10 x 10^-6 /°C.

    • These coefficients are important to consider when designing structures to account for temperature changes.

  • Answered by AI
Round 2 - No round two 

(2 Questions)

  • Q1. What will be current salary ?
  • Ans. 

    I am currently earning $70,000 per year.

    • My current salary is $70,000 per year.

    • I am open to discussing salary expectations for this position.

    • I believe my skills and experience align with the salary range for this role.

  • Answered by AI
  • Q2. What will be the expected salary ?
  • Ans. 

    The expected salary for a Cost Estimation Engineer can vary depending on factors such as experience, location, and company size.

    • Expected salary can range from $60,000 to $100,000 per year.

    • Factors influencing salary include years of experience, level of education, and industry.

    • Cost Estimation Engineers in larger cities or high-demand industries may earn higher salaries.

    • Negotiation skills can also play a role in determin

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Prepare questions mentioned above for position of Estimation and billing engineer ?

Skills evaluated in this interview

Esbee Realty Interview FAQs

How many rounds are there in Esbee Realty Cost Estimation Engineer interview?
Esbee Realty interview process usually has 2 rounds. The most common rounds in the Esbee Realty interview process are Technical.
What are the top questions asked in Esbee Realty Cost Estimation Engineer interview?

Some of the top questions asked at the Esbee Realty Cost Estimation Engineer interview -

  1. what is the total cost of a residential building per built up are...read more
  2. Rate of mivan shuttering per Sqm ( Material + Labour ...read more
  3. thumb rule for calculation of mivan shuttering per sqft of built up are...read more

Tell us how to improve this page.

Esbee Realty Cost Estimation Engineer Interview Process

based on 1 interview

Interview experience

4
  
Good
View more

Interview Questions from Similar Companies

TCS Interview Questions
3.7
 • 10.4k Interviews
Accenture Interview Questions
3.8
 • 8.2k Interviews
Infosys Interview Questions
3.6
 • 7.6k Interviews
Wipro Interview Questions
3.7
 • 5.6k Interviews
Cognizant Interview Questions
3.8
 • 5.6k Interviews
Amazon Interview Questions
4.1
 • 5k Interviews
Capgemini Interview Questions
3.7
 • 4.8k Interviews
Tech Mahindra Interview Questions
3.5
 • 3.8k Interviews
HCLTech Interview Questions
3.5
 • 3.8k Interviews
Genpact Interview Questions
3.8
 • 3.1k Interviews
View all
Compare Esbee Realty with

TCS

3.7
Compare

Accenture

3.8
Compare

Wipro

3.7
Compare

Cognizant

3.8
Compare
Did you find this page helpful?
Yes No
write
Share an Interview