i
Equiniti
Filter interviews by
Clear (1)
I applied via Recruitment Consulltant and was interviewed in Jan 2024. There were 3 interview rounds.
BPMN (Business Process Model and Notation) is a graphical representation for specifying business processes in a workflow.
BPMN 2.0 is the most widely used version
Types of BPMN models include: Process, Collaboration, Choreography
Symbols in BPMN represent different elements like tasks, gateways, events
Examples: Process model for order processing, Collaboration model for supply chain management
Business process Modelling using visio
To draw a basic flow chart using Visio, start by opening a new document and selecting the 'Flowchart' template.
Open Visio and select the 'Flowchart' template
Drag and drop shapes from the 'Flowchart' Shapes' panel onto the canvas
Connect the shapes using arrows to show the flow of the process
Add text to label each shape and describe the process
Format the flowchart by adjusting shapes, colors, and styles
Top trending discussions
I applied via Recruitment Consulltant and was interviewed in Sep 2022. There were 2 interview rounds.
I applied via Referral and was interviewed in Nov 2020. There was 1 interview round.
I applied via Approached by Company and was interviewed before Aug 2021. There were 2 interview rounds.
I appeared for an interview in Aug 2020.
I applied via Naukri.com and was interviewed in Dec 2020. There was 1 interview round.
I applied via Walk-in and was interviewed before Jul 2020. There was 1 interview round.
I appeared for an interview before Jan 2021.
I applied via Campus Placement and was interviewed before Apr 2021. There were 3 interview rounds.
A problem on portfolio optimization was given.
P-value is a statistical measure that helps determine the significance of results in hypothesis testing. A/B testing is a method of comparing two versions of a webpage or app to see which one performs better.
P-value is the probability of obtaining a result as extreme or more extreme than the observed result, assuming the null hypothesis is true.
A/B testing involves randomly dividing a sample into two groups and exposin...
ARMA and ARIMA are models used for time series analysis. Stationarity refers to the statistical properties of a time series remaining constant over time.
ARMA stands for Autoregressive Moving Average model and is used to model stationary time series data.
ARIMA stands for Autoregressive Integrated Moving Average model and is used to model non-stationary time series data.
Stationarity is an important concept in time series...
based on 1 interview
Interview experience
Processing Executive
329
salaries
| ₹2 L/yr - ₹4.8 L/yr |
Senior Processing Executive
156
salaries
| ₹2.5 L/yr - ₹6.3 L/yr |
KYC Analyst
82
salaries
| ₹2 L/yr - ₹4.7 L/yr |
Team Lead
70
salaries
| ₹6 L/yr - ₹18.4 L/yr |
Customer experience Executive
68
salaries
| ₹3.5 L/yr - ₹6.7 L/yr |
Karvy Financial Services
CAMS
National Securities Depository
Central Depository Services (I)