Stub-in and stub-out branches refer to specific types of branch structures in programming and system design.
Stub-in branches are used to connect to existing systems or components, allowing for integration.
Example: A stub-in branch might connect a new module to a legacy database.
Stub-out branches are designed to allow for future expansion or integration with other systems.
Example: A stub-out branch might be created...
P&ID, isometric drawings, and GAD are essential engineering diagrams used in process design and construction.
P&ID (Piping and Instrumentation Diagram): Shows piping, equipment, and instrumentation in a process.
Isometric Drawing: Represents 3D objects in two dimensions, often used for piping layouts.
GAD (General Arrangement Drawing): Provides an overall layout of equipment and structures in a facility.
Examp...
Three points contact is a safety practice where three of your four limbs are in contact with a ladder or structure at all times to prevent falls.
Three points contact involves having both feet and one hand or both hands and one foot in contact with the ladder or structure at all times.
This practice helps to ensure stability and reduce the risk of falling while climbing or working at heights.
Always maintain three po...
Confined space is an area that is not designed for continuous occupancy, has limited entry and exit points, and may have hazardous conditions.
Confined spaces are typically small and enclosed, such as tanks, silos, tunnels, and sewers.
These spaces may contain hazards like poor ventilation, toxic gases, or engulfment hazards.
Workers entering confined spaces must follow specific safety procedures and use appropriate ...
Maximum boom angle in a crawler crane is typically around 70-80 degrees.
Maximum boom angle is usually limited to prevent tipping over of the crane.
The angle can vary depending on the specific model and manufacturer of the crawler crane.
Operators must be trained to adhere to the recommended boom angle limits to ensure safety.
Exceeding the maximum boom angle can result in accidents and damage to the crane.
Work at height refers to any work that is performed above ground level where a person could fall and injure themselves.
Work at height includes tasks such as working on roofs, scaffolding, ladders, or elevated platforms.
Safety measures such as fall protection equipment should be used when working at height.
Training on proper procedures for working at height is essential to prevent accidents.
Examples of work at heig...
Decision making quality can be managed by setting clear criteria, gathering relevant information, considering alternatives, and seeking input from stakeholders.
Set clear criteria for decision making to ensure alignment with project goals
Gather relevant information from various sources to make informed decisions
Consider multiple alternatives and evaluate their potential outcomes
Seek input from stakeholders to gain ...
Increasing productivity can be achieved through effective time management, delegation of tasks, setting clear goals, providing training and resources, and fostering a positive work environment.
Implement time management techniques such as prioritizing tasks and setting deadlines
Delegate tasks to team members based on their strengths and expertise
Set clear and achievable goals for individuals and teams
Provide traini...
Different types of problems can be dealt with by analyzing the root cause, brainstorming solutions, seeking input from others, and implementing the most effective solution.
Identify the root cause of the problem before attempting to solve it.
Brainstorm potential solutions and evaluate their feasibility.
Seek input from colleagues or experts in the field for different perspectives.
Implement the most effective solutio...
Adding petrol to a diesel engine or diesel to a petrol engine can cause serious damage to the engine and may lead to engine failure.
Adding petrol to a diesel engine can cause knocking and reduced lubrication, leading to engine damage.
Adding diesel to a petrol engine can cause incomplete combustion, clogging of fuel injectors, and damage to the engine components.
It is important to always use the correct type of fue...
I appeared for an interview in Feb 2022.
Pipe bevel angle refers to the angle formed between the prepared edge of a pipe and a plane perpendicular to the pipe's surface.
Pipe bevel angle is important in welding as it affects the quality and strength of the weld.
The angle is typically measured in degrees and can vary depending on the thickness and material of the pipe.
Common bevel angles for welding range from 30 to 60 degrees.
The bevel angle can also affect th...
NDT is a non-destructive testing method used to evaluate the properties of a material, component or system without causing damage.
NDT is used to detect defects or irregularities in materials or structures
It helps to ensure the safety and reliability of critical components such as pipelines, aircraft, and bridges
NDT techniques include ultrasonic testing, radiography, magnetic particle testing, and visual inspection
NDT i...
JOB HANDLING EXPERIENCE
Three points contact is a safety practice where three of your four limbs are in contact with a ladder or structure at all times to prevent falls.
Three points contact involves having both feet and one hand or both hands and one foot in contact with the ladder or structure at all times.
This practice helps to ensure stability and reduce the risk of falling while climbing or working at heights.
Always maintain three points ...
Confined space is an area that is not designed for continuous occupancy, has limited entry and exit points, and may have hazardous conditions.
Confined spaces are typically small and enclosed, such as tanks, silos, tunnels, and sewers.
These spaces may contain hazards like poor ventilation, toxic gases, or engulfment hazards.
Workers entering confined spaces must follow specific safety procedures and use appropriate prote...
Work at height refers to any work that is performed above ground level where a person could fall and injure themselves.
Work at height includes tasks such as working on roofs, scaffolding, ladders, or elevated platforms.
Safety measures such as fall protection equipment should be used when working at height.
Training on proper procedures for working at height is essential to prevent accidents.
Examples of work at height in...
Engineering controls in scaffold refer to physical changes made to the scaffold structure to reduce hazards.
Engineering controls can include adding guardrails to prevent falls from heights
Using toeboards to prevent tools or materials from falling off the scaffold
Installing debris netting to catch falling objects
Implementing a system for regular inspection and maintenance of the scaffold structure
Maximum boom angle in a crawler crane is typically around 70-80 degrees.
Maximum boom angle is usually limited to prevent tipping over of the crane.
The angle can vary depending on the specific model and manufacturer of the crawler crane.
Operators must be trained to adhere to the recommended boom angle limits to ensure safety.
Exceeding the maximum boom angle can result in accidents and damage to the crane.
I handle team work pressure by staying organized, communicating effectively, delegating tasks, and maintaining a positive attitude.
Stay organized by creating a detailed project plan with deadlines and milestones
Communicate effectively with team members to ensure everyone is on the same page
Delegate tasks based on team members' strengths and workload
Maintain a positive attitude to keep morale high during stressful times
Different types of problems can be dealt with by analyzing the root cause, brainstorming solutions, seeking input from others, and implementing the most effective solution.
Identify the root cause of the problem before attempting to solve it.
Brainstorm potential solutions and evaluate their feasibility.
Seek input from colleagues or experts in the field for different perspectives.
Implement the most effective solution and...
Decision making quality can be managed by setting clear criteria, gathering relevant information, considering alternatives, and seeking input from stakeholders.
Set clear criteria for decision making to ensure alignment with project goals
Gather relevant information from various sources to make informed decisions
Consider multiple alternatives and evaluate their potential outcomes
Seek input from stakeholders to gain diffe...
Increasing productivity can be achieved through effective time management, delegation of tasks, setting clear goals, providing training and resources, and fostering a positive work environment.
Implement time management techniques such as prioritizing tasks and setting deadlines
Delegate tasks to team members based on their strengths and expertise
Set clear and achievable goals for individuals and teams
Provide training an...
Good excellent nice awesome great fabulous
I applied via Referral and was interviewed in Jul 2024. There was 1 interview round.
My education background includes a degree in Human Resources Management which provides me with the necessary knowledge and skills for this job.
Studied Human Resources Management which is directly relevant to this HR Executive position
Courses in organizational behavior, labor relations, and recruitment strategies have prepared me for the responsibilities of this role
Internship experience in HR department provided hands-...
I applied via Campus Placement and was interviewed in Feb 2024. There were 2 interview rounds.
The Group Discussion round was nice. They will give u one topic and u have to share u thoughts among 10-12 people and 5 panelists. My topic was Does Online Education can be beneficial for teaching?
Top trending discussions
Some of the top questions asked at the Engineers India interview -
The duration of Engineers India interview process can vary, but typically it takes about less than 2 weeks to complete.
based on 59 interview experiences
Difficulty level
Duration
based on 707 reviews
Rating in categories
Deputy Manager
161
salaries
| ₹9.6 L/yr - ₹16 L/yr |
Senior Manager
132
salaries
| ₹24 L/yr - ₹42 L/yr |
Manager
97
salaries
| ₹18 L/yr - ₹32 L/yr |
Piping Designer
90
salaries
| ₹6 L/yr - ₹13 L/yr |
Senior Engineer
87
salaries
| ₹5.6 L/yr - ₹11.1 L/yr |
Suzlon Group
Himalaya Wellness
Extramarks Education
Sify Technologies