Upload Button Icon Add office photos
Engaged Employer

i

This company page is being actively managed by Enerzia Power Solutions Team. If you also belong to the team, you can get access from here

Enerzia Power Solutions Verified Tick

Compare button icon Compare button icon Compare

Filter interviews by

Enerzia Power Solutions Interview Questions and Answers

Updated 29 Sep 2023

Enerzia Power Solutions Interview Experiences

1 interview found

Sales Manager Interview Questions & Answers

user image Anonymous

posted on 29 Sep 2023

Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Naukri.com and was interviewed in Aug 2023. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - One-on-one 

(5 Questions)

  • Q1. How to Create own concept for sales improvement
  • Ans. 

    To create a concept for sales improvement, analyze current processes, identify areas for improvement, set specific goals, implement strategies, and track progress.

    • Analyze current sales processes and identify areas for improvement

    • Set specific and measurable sales goals to work towards

    • Implement new sales strategies such as targeted marketing campaigns or improved customer service

    • Track progress towards sales goals and adj...

  • Answered by AI
  • Q2. Daily read Newspaper
  • Q3. Daily search new products advertisement
  • Ans. 

    Make to create Happy view concept

  • Answered Anonymously
  • Q4. How to finalized the product details
  • Ans. 

    Finalizing product details involves gathering feedback, analyzing market trends, and collaborating with cross-functional teams.

    • Gather feedback from customers, sales team, and stakeholders

    • Analyze market trends and competitor offerings

    • Collaborate with product development, marketing, and operations teams

    • Consider pricing, packaging, and positioning strategies

    • Ensure alignment with company goals and customer needs

  • Answered by AI
  • Q5. Product benefits
Round 3 - Group Discussion 

Job description are most important

Interview Preparation Tips

Interview preparation tips for other job seekers - Suggestion are most advantage, How to select your own right suggestion upcoming job

Sales Manager Interview Questions asked at other Companies

Q1. If you're in Cold areas like Kashmir or Himachal Pradesh. & You have to sell an AC which is having only Cold option. How would you do that?
View answer (17)

Interview questions from similar companies

Interview experience
3
Average
Difficulty level
Hard
Process Duration
2-4 weeks
Result
No response

I was interviewed in Jan 2025.

Round 1 - Aptitude Test 

There are 2 rounds of aptitude, questions are a bit difficult so prepare well!

Round 2 - Technical 

(9 Questions)

  • Q1. Self introduction
  • Q2. Why oil used in transformers
  • Q3. On which principle do electrical motors run?
  • Q4. Interviewer asked me what Faraday's left hand and right hand rule were, but there's no such rules, its called flemming's left hand and right hand rule. They are expecting you to correct them and say the co...
  • Q5. Questions about my favorite subject from last semester and Questions regarding that subject
  • Q6. Questions regarding your resume, i got asked about electric two wheelers since i had that in my resume
  • Q7. If you have any questions for them
  • Q8. If you're okay with being relocated
  • Q9. How will you tell the difference between an AC motor and DC motor by looking at them?

Interview Preparation Tips

Interview preparation tips for other job seekers - This was my personal experience; many of my friends had a much more pleasant experience compared to mine. Anyway, good luck.
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
Selected Selected

I applied via Naukri.com

Round 1 - One-on-one 

(2 Questions)

  • Q1. What is channel sales management
  • Q2. Who is the distributor and who are our channel partners
Round 2 - One-on-one 

(2 Questions)

  • Q1. How much business can you generate in a year.
  • Q2. I already work 24/7
Round 3 - HR 

(1 Question)

  • Q1. A brief introduction about yourself.

Interview Preparation Tips

Interview preparation tips for other job seekers - Be positive read some interview questions regarding channel sales management work like for the positions of sales executive management trainees sales officer Business Development executive in different companies see all the product details prices how the distribution channels work who are the channel partners how what is channel sales management what is sales and marketing management what is business management where is from the company is what company basically does what is the growth of the company what is the total revenue generation per year of that particular company and how many employees does this company have what is the growth ratio of their employees how much salary is the expectation and what salary does the employees gate in that organisation does this organisation have good and what is the market.
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Approached by Company and was interviewed in Dec 2024. There were 3 interview rounds.

Round 1 - Technical 

(2 Questions)

  • Q1. This job parmanent?
  • Q2. My sallary?
Round 2 - Technical 

(2 Questions)

  • Q1. Where is job Location?
  • Q2. Others facility?
Round 3 - Technical 

(2 Questions)

  • Q1. My intervew date?
  • Q2. Week off

Interview Preparation Tips

Interview preparation tips for other job seekers - Thank you for your support
Interview experience
4
Good
Difficulty level
-
Process Duration
-
Result
-
Round 1 - HR 

(2 Questions)

  • Q1. Tell me about your self
  • Ans. 

    I am a dedicated Mechanical Engineer with a strong background in designing and implementing mechanical systems.

    • Graduated with a degree in Mechanical Engineering from XYZ University

    • Experienced in CAD software such as AutoCAD and SolidWorks

    • Worked on projects involving HVAC systems and industrial machinery

    • Skilled in analyzing and solving complex engineering problems

    • Strong communication and teamwork skills

  • Answered by AI
  • Q2. How many experience you have in Boiler Turbine,ESP,BAG FILTER EPCI
  • Ans. 

    I have 5 years of experience in Boiler Turbine, ESP, and BAG FILTER EPCI projects.

    • 5 years of experience in Boiler Turbine projects

    • Familiar with ESP (Electrostatic Precipitator) systems

    • Proficient in BAG FILTER EPCI (Engineering, Procurement, Construction, and Installation)

    • Managed various projects involving Boiler Turbine, ESP, and BAG FILTER systems

    • Implemented cost-effective solutions for improving efficiency

  • Answered by AI
Round 2 - Technical 

(3 Questions)

  • Q1. ERECTION PROCESS OF BOILER ?
  • Ans. 

    The erection process of a boiler involves assembling and installing all the components to create a functional boiler system.

    • Prepare the foundation for the boiler

    • Assemble the boiler components such as tubes, drums, and headers

    • Install the boiler on the foundation

    • Connect the necessary piping and valves

    • Test the boiler for proper functioning

  • Answered by AI
  • Q2. Material specification of all boiler pressure part.
  • Ans. 

    Boiler pressure parts are typically made of carbon steel, alloy steel, or stainless steel to withstand high pressure and temperature.

    • Carbon steel is commonly used for lower pressure boilers

    • Alloy steel is used for higher pressure boilers

    • Stainless steel is used for corrosion resistance in boilers

    • Materials must meet specific standards like ASTM A516 for carbon steel

  • Answered by AI
  • Q3. Which welding process used in water wall panel
  • Ans. 

    The welding process used in water wall panels is typically TIG welding.

    • TIG welding is commonly used for water wall panels due to its precision and clean welds

    • TIG welding helps prevent contamination in the weld area, which is crucial for water wall panels

    • Other welding processes like MIG welding or submerged arc welding may also be used depending on the specific requirements

  • Answered by AI
Interview experience
1
Bad
Difficulty level
Easy
Process Duration
2-4 weeks
Result
Not Selected

I applied via Approached by Company and was interviewed in Jul 2024. There was 1 interview round.

Round 1 - One-on-one 

(4 Questions)

  • Q1. What will you do if your senior doesn’t tell you technical facts of project, management wants you to perform from day 1.
  • Q2. What will you do if 70% of work given to you is a documentation work for next 2 years?
  • Ans. 

    I would prioritize and efficiently manage the documentation work while also finding ways to automate or streamline the process.

    • Prioritize tasks based on importance and deadlines

    • Look for opportunities to automate or streamline documentation processes

    • Delegate tasks if possible to ensure efficiency

    • Maintain clear communication with team members and stakeholders

    • Seek feedback and continuously improve documentation quality

  • Answered by AI
  • Q3. Interviewer was rude and peculiar in his behaviour
  • Q4. Interviewer (Pradeep Biradar) did not had the intention for recruitment. He was demoralising about the position and the company.

Interview Preparation Tips

Interview preparation tips for other job seekers - I was interviewed with Eaton by Pradeep Birader. He introduced himself as some manager. Twice interview was postponed. Later in the interview Mr. Pradeep Biradar started showing his true colour with absolutely absurd questions.

What happens if someone senior in the company doesn’t share technical facts, what will you do??? Management wants you to deliver from first day! All such absurd and nonsense question.

Then he switched his question, what if 70% documentation work given to you for next 2 years, what will you do?
Obviously management should know this better!


All kind of baseless and nonsense questions from the interviewer. Do not know authenticity and credibility of these person. As if he is coming from a roadside slum.

My answer was clear, if someone not willing to share technical details of project than leadership should take care of this. If 70% of documentation work is there, you must hire a technical writer.

Then clearly I showed my disinterest for this position!

This is how some incompetent and incredible people spoils good positions and working culture of good companies.
Interview experience
3
Average
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed in Nov 2024. There were 2 interview rounds.

Round 1 - HR 

(2 Questions)

  • Q1. Tata in job for parmanent how
  • Q2. Benifits and salary how time of period
Round 2 - Technical 

(3 Questions)

  • Q1. Solar project site is working of day
  • Q2. Time of work how
  • Q3. Safety work of area how
  • Ans. 

    Safety work of area involves implementing safety measures to prevent accidents and ensure a safe working environment.

    • Conduct regular safety inspections of the work area

    • Provide safety training to all workers

    • Enforce the use of personal protective equipment (PPE)

    • Implement safety protocols and procedures

    • Maintain clear and accessible emergency exits

    • Ensure proper storage and handling of hazardous materials

  • Answered by AI

Interview Preparation Tips

Topics to prepare for Tata Power Site Execution Engineer interview:
  • Technical Skills
Interview preparation tips for other job seekers - Site execution engineer
Interview experience
5
Excellent
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed in Dec 2024. There were 7 interview rounds.

Round 1 - Group Discussion 

One to one meeting i will aspects

Round 2 - HR 

(5 Questions)

  • Q1. One to one meeting
  • Q2. Disscuss to my profile
  • Q3. Self-help and work details
  • Q4. Know complete details about me
  • Q5. Knowing the details of my works
Round 3 - Aptitude Test 

Any one i will aspects

Round 4 - Aptitude Test 

Any one i will accpected

Round 5 - Assignment 

Project discussion for some ones

Round 6 - Assignment 

Any ons disscuss of project worth

Round 7 - Assignment 

Both are i will according test

Interview Preparation Tips

Interview preparation tips for other job seekers - Nothing but work placed for ROTN only
Interview experience
3
Average
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(2 Questions)

  • Q1. What are different types of heat transfer process and equations
  • Ans. 

    Different types of heat transfer include conduction, convection, and radiation, each governed by specific equations.

    • Conduction: Heat transfer through a material without any movement of the material itself. Governed by Fourier's Law of Heat Conduction.

    • Convection: Heat transfer through a fluid (liquid or gas) due to the movement of the fluid. Governed by Newton's Law of Cooling.

    • Radiation: Heat transfer through electromag...

  • Answered by AI
  • Q2. What are the Different types of boilers
  • Ans. 

    Different types of boilers include fire tube boilers, water tube boilers, and electric boilers.

    • Fire tube boilers have hot gases flowing through tubes that are surrounded by water

    • Water tube boilers have water flowing through tubes that are heated by hot gases

    • Electric boilers use electricity to generate heat instead of burning fuel

  • Answered by AI
Interview experience
4
Good
Difficulty level
Easy
Process Duration
-
Result
Selected Selected

I applied via campus placement at MBM Engineering College, Jodhpur and was interviewed in Dec 2024. There were 2 interview rounds.

Round 1 - Aptitude Test 

Easy test with simple questions

Round 2 - One-on-one 

(2 Questions)

  • Q1. How do solar panels produce electricity
  • Q2. Tell us about the company

Enerzia Power Solutions Interview FAQs

How many rounds are there in Enerzia Power Solutions interview?
Enerzia Power Solutions interview process usually has 3 rounds. The most common rounds in the Enerzia Power Solutions interview process are Resume Shortlist, One-on-one Round and Group Discussion.
What are the top questions asked in Enerzia Power Solutions interview?

Some of the top questions asked at the Enerzia Power Solutions interview -

  1. How to Create own concept for sales improvem...read more
  2. How to finalized the product deta...read more
  3. Daily search new products advertisem...read more

Tell us how to improve this page.

Enerzia Power Solutions Interview Process

based on 1 interview

Interview experience

5
  
Excellent
View more

Interview Questions from Similar Companies

SgurrEnergy Interview Questions
4.0
 • 5 Interviews
Atria Power Interview Questions
4.0
 • 3 Interviews
MYSUN Interview Questions
4.1
 • 3 Interviews
Mb Power (m.p) Interview Questions
3.7
 • 2 Interviews
Gram Power Interview Questions
4.1
 • 1 Interview
View all

Enerzia Power Solutions Reviews and Ratings

based on 2 reviews

4.9/5

Rating in categories

5.0

Skill development

4.9

Work-life balance

5.0

Salary

1.0

Job security

3.0

Company culture

5.0

Promotions

5.0

Work satisfaction

Explore 2 Reviews and Ratings
Compare Enerzia Power Solutions with

Jyoti Structures

3.6
Compare

Aqua Tech Systems

4.1
Compare

Mb Power (m.p)

3.7
Compare

Solarig Gensol Utilities

4.5
Compare
Did you find this page helpful?
Yes No
write
Share an Interview