  • Q1. 11kv line (1kmtr) Acsr rabbit conducter
  • Q2. Flying stay, stay wire waight 8mtr psc pole, pole depth

Interview Preparation Tips

Interview preparation tips for other job seekers - I have work in Lumino Industries Limited as Supervisor since 2years supaul site Re-conductoring work

Interview questions from similar companies

I applied via Recruitment Consultant and was interviewed before Sep 2020. There was 1 interview round.

Interview Questionnaire 

3 Questions

  • Q1. Earakshan stinking ke bare mein poochha Gaya
  • Q2. Ericsson ki TMP stinging ki TMP
  • Q3. Civil work and field planning

Interview Preparation Tips

Interview preparation tips for other job seekers - main unke prashnon ka Sahi Sahi Uttar Diya
Interview experience
3
Average
Difficulty level
Moderate
Process Duration
6-8 weeks
Result
Selected Selected

I appeared for an interview in Jul 2024.

Round 1 - Technical 

(2 Questions)

  • Q1. Site supervisor
  • Ans. 

    Civil work, piling work fabrication and erection

  • Answered Anonymously
  • Q2. No ather cuntry, working form my country
  • Ans. 

    No ather cuntry, only my country india

  • Answered Anonymously
Round 2 - Technical 

(2 Questions)

  • Q1. Work location , company room
  • Ans. 

    Mumbai, Surat, Jharkhand, madhyapradesh

  • Answered Anonymously
  • Q2. No working refareniy
Round 3 - Technical 

(2 Questions)

  • Q1. Full safety work
  • Q2. No question
Round 4 - Technical 

(2 Questions)

  • Q1. No working chemical
  • Q2. Quality my work
Round 5 - Technical 

(2 Questions)

  • Q1. Proper material provided
  • Q2. No question

Interview Preparation Tips

Interview preparation tips for other job seekers - Yes company public sujao

I applied via Company Website and was interviewed in Mar 2021. There was 1 interview round.

Interview Questionnaire 

2 Questions

  • Q1. Civil work erection work and still working sawal puche
  • Q2. Main sawalon ka lagbhag lagbhag sahi jawab Diya

Interview Preparation Tips

Interview preparation tips for other job seekers - main lagta prashnon ka Sahi sahi jawab Diya
Interview experience
4
Good
Difficulty level
-
Process Duration
-
Result
-

I applied via Shine

Round 1 - HR 

(2 Questions)

  • Q1. What is concrete
  • Ans. 

    Concrete is a composite material made of cement, water, and aggregates, used in construction for its strength and durability.

    • Concrete is a mixture of cement, water, and aggregates (such as sand, gravel, or crushed stone).

    • It is a versatile material used in construction for building foundations, walls, floors, and other structures.

    • Concrete hardens and gains strength over time through a process called hydration, where the...

  • Answered by AI
  • Q2. What is m20 concrete
  • Ans. 

    M20 concrete is a type of concrete mix with a compressive strength of 20 megapascals (MPa).

    • M20 concrete is commonly used in construction for various applications.

    • It is a mix of cement, sand, and aggregate in specific proportions.

    • The ratio of cement:sand:aggregate in M20 concrete is 1:1.5:3.

    • The compressive strength of M20 concrete is achieved after 28 days of curing.

    • It is suitable for non-structural applications like fl

  • Answered by AI

Interview Questionnaire 

1 Question

  • Q1. He just asked how much will you take?

Interview Preparation Tips

Round: HR Interview
Experience: Nothing much, they are all concerned about money.
Tips: Just tell them as per company standard.

I applied via Referral and was interviewed before May 2020. There was 1 interview round.

Interview Questionnaire 

3 Questions

  • Q1. How to do Rate analysis ?
  • Ans. 

    Rate analysis is the process of determining the unit cost of a particular item or activity in a construction project.

    • Identify the item or activity to be analyzed

    • Determine the quantity of materials and labor required

    • Calculate the cost of materials and labor

    • Add overhead costs and profit margin

    • Divide the total cost by the quantity to get the unit rate

    • Compare the rate with market rates to ensure competitiveness

  • Answered by AI
  • Q2. What are the components to be considered in the Rate analysis?
  • Ans. 

    Components to be considered in Rate analysis

    • Cost of materials

    • Cost of labor

    • Cost of equipment

    • Overhead expenses

    • Profit margin

    • Taxes and duties

    • Transportation costs

    • Wastage and spoilage

    • Contingencies

    • Productivity rates

    • Market rates

    • Inflation rates

  • Answered by AI
  • Q3. Documents required to certify Final bill
  • Ans. 

    The documents required to certify the final bill as a Quantity Surveyor.

    • Contract documents

    • Measurement records

    • Variation orders

    • Payment certificates

    • Final account statement

    • As-built drawings

    • Completion certificates

    • Test reports

    • Subcontractor invoices

    • Material invoices

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Both Technical & Contract knowledge is required. Prepare for the same.

I applied via Referral and was interviewed before Nov 2020. There was 1 interview round.

Interview Questionnaire 

2 Questions

  • Q1. Height work safety &Control measures
  • Q2. Administrative control, Engineering control, legal control

Interview Preparation Tips

Interview preparation tips for other job seekers - Don't Fear & Free to talk

Interview Questionnaire 

6 Questions

  • Q1.  what is Civil field work ?
  • Q2. I asked him civil works is hardly & response sites staff corporate
  • Q3. What is shutting working?
  • Ans. 

    Shutting working refers to the process of closing or shutting down a construction site or specific area for maintenance, repairs, or safety reasons.

    • Shutting working involves temporarily stopping all construction activities in a designated area.

    • It is done to ensure the safety of workers and the public, as well as to carry out necessary maintenance or repairs.

    • During shutting working, access to the area is restricted, and...

  • Answered by AI
  • Q4. Shutting working is concrete coverly besmenf
  • Q5. What is GFl?
  • Ans. 

    GFl stands for Ground Fault Locator.

    • GFl is a device used to locate ground faults in electrical systems.

    • It helps in identifying the exact location of the fault, which can be crucial for maintenance and repair work.

    • By measuring the flow of current and voltage, GFl can pinpoint the area where the electrical current is leaking to the ground.

    • It is commonly used in industries, construction sites, and power distribution syste...

  • Answered by AI
  • Q6. Ground floor leave

I applied via Recruitment Consultant and was interviewed in Dec 2020. There were 3 interview rounds.

Interview Questionnaire 

1 Question

  • Q1. What is the waight of 1m 16 mm steel
  • Ans. 

    The weight of 1m 16 mm steel depends on the density of steel.

    • The weight of steel can be calculated using the formula: weight = volume x density

    • The density of steel is approximately 7.85 grams per cubic centimeter

    • To calculate the weight of 1m 16 mm steel, we need to calculate its volume first

    • The volume of a cylinder (steel rod) can be calculated using the formula: volume = π x radius^2 x height

    • In this case, the radius w...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Good company

Energo Engineering Projects Interview FAQs

What are the top questions asked in Energo Engineering Projects Site Supervisor interview for experienced candidates?

Some of the top questions asked at the Energo Engineering Projects Site Supervisor interview for experienced candidates -

  1. Flying stay, stay wire waight 8mtr psc pole, pole dep...read more
  2. 11kv line (1kmtr) Acsr rabbit conduct...read more

Tell us how to improve this page.

Interview Questions from Similar Companies

Tata Technologies Interview Questions
3.6
 • 266 Interviews
Saint-Gobain Interview Questions
4.0
 • 174 Interviews
AECOM Interview Questions
4.2
 • 120 Interviews
Worley Interview Questions
4.1
 • 113 Interviews
Bechtel Interview Questions
4.0
 • 68 Interviews
Samsung E&A Interview Questions
4.0
 • 61 Interviews
View all
Energo Engineering Projects Site Supervisor Salary
based on 6 salaries
₹1.5 L/yr - ₹2.2 L/yr
33% less than the average Site Supervisor Salary in India
View more details

Energo Engineering Projects Site Supervisor Reviews and Ratings

based on 4 reviews

2.9/5

Rating in categories

2.9

Skill development

3.6

Work-life balance

2.2

Salary

2.2

Job security

2.9

Company culture

2.2

Promotions

2.9

Work satisfaction

Explore 4 Reviews and Ratings
Senior Engineer
12 salaries
unlock blur

₹3 L/yr - ₹5.2 L/yr

Site Engineer
9 salaries
unlock blur

₹2.7 L/yr - ₹3.8 L/yr

Electrical Site Engineer
7 salaries
unlock blur

₹2.2 L/yr - ₹3 L/yr

Deputy Manager
7 salaries
unlock blur

₹6 L/yr - ₹9 L/yr

Assistant Manager
6 salaries
unlock blur

₹5.4 L/yr - ₹7.2 L/yr

Explore more salaries
Compare Energo Engineering Projects with

Megha Engineering & Infrastructures

3.9
Compare

Shapoorji Pallonji Group

4.1
Compare

Alstom Transportation

3.7
Compare

Tata Technologies

3.6
Compare
Did you find this page helpful?
Yes No
write
Share an Interview