i
Egis India Consulting Engineers
Filter interviews by
We use various tools for HR management including HRIS, ATS, and performance management software.
HRIS (Human Resource Information System) for managing employee data and records
ATS (Applicant Tracking System) for managing recruitment and hiring processes
Performance management software for tracking employee performance and setting goals
Employee engagement tools for measuring and improving employee satisfaction
Learning man...
Top trending discussions
posted on 8 Oct 2022
I appeared for an interview before Oct 2021.
I applied via Approached by Company and was interviewed before Jul 2021. There was 1 interview round.
I applied via Walk-in and was interviewed before Aug 2019. There was 1 interview round.
Fe500 is a type of high-strength reinforcement steel used in construction.
Fe500 stands for 'Fe' meaning iron and '500' representing the minimum yield strength of the steel in megapascals (MPa).
It is commonly used in construction for its high strength and durability.
Fe500 steel bars are used in reinforced concrete structures such as buildings, bridges, and highways.
It is also known as TMT (Thermo-Mechanically Treated) s...
To draw SFD and BMD for simply supported beam under UDL of 10KM/m, follow these steps:
Calculate the reactions at the supports
Draw the SFD by taking the upward forces as positive and starting from one end
Draw the BMD by taking the positive moment as clockwise and starting from one end
Mark the maximum values of SFD and BMD
Check the equilibrium and compatibility of the beam
posted on 29 Nov 2022
I applied via Campus Placement and was interviewed before Nov 2021. There were 3 interview rounds.
General aptitude test
Like reasoning and general knowledge maths. And english
Material quantity in a wall can be calculated by determining the volume of the wall and multiplying it by the density of the material.
Calculate the volume of the wall by multiplying its length, width, and height
Determine the density of the material being used
Multiply the volume of the wall by the density of the material to get the material quantity
For example, if the wall is 10 feet long, 8 feet high, and 0.5 feet thic...
I applied via Approached by Company and was interviewed before Jan 2023. There were 2 interview rounds.
The full scope of work is in accordance with the conditions of the contract.
I applied via Approached by Company and was interviewed before Jul 2022. There were 3 interview rounds.
The rating of a transformer is in kVA and the current can be found using the formula: Current (A) = kVA / (1.732 x Voltage)
Transformer rating is in kVA (kilo-volt-ampere)
To find the current in a transformer, use the formula: Current (A) = kVA / (1.732 x Voltage)
For example, if a transformer has a rating of 100 kVA and operates at 480V, the current would be 100 / (1.732 x 480) = 120.7A
based on 1 review
Rating in categories
Field Engineer
264
salaries
| ₹1.7 L/yr - ₹4.8 L/yr |
Civil Engineer
51
salaries
| ₹2.8 L/yr - ₹10 L/yr |
Senior Manager
44
salaries
| ₹7.7 L/yr - ₹21.5 L/yr |
Assistant Resident Engineer
43
salaries
| ₹4.4 L/yr - ₹12 L/yr |
Resident Engineer
41
salaries
| ₹5.6 L/yr - ₹18.4 L/yr |
L&T Construction
Shapoorji Pallonji Group
Saint-Gobain
AECOM