i
Egis India Consulting Engineers
Filter interviews by
We use various tools for HR management including HRIS, ATS, and performance management software.
HRIS (Human Resource Information System) for managing employee data and records
ATS (Applicant Tracking System) for managing recruitment and hiring processes
Performance management software for tracking employee performance and setting goals
Employee engagement tools for measuring and improving employee satisfaction
Learning man...
Top trending discussions
I applied via Approached by Company and was interviewed before Jul 2021. There was 1 interview round.
I applied via Walk-in and was interviewed before Aug 2019. There was 1 interview round.
Fe500 is a type of high-strength reinforcement steel used in construction.
Fe500 stands for 'Fe' meaning iron and '500' representing the minimum yield strength of the steel in megapascals (MPa).
It is commonly used in construction for its high strength and durability.
Fe500 steel bars are used in reinforced concrete structures such as buildings, bridges, and highways.
It is also known as TMT (Thermo-Mechanically Treated) s...
posted on 8 Oct 2022
I appeared for an interview before Oct 2021.
To draw SFD and BMD for simply supported beam under UDL of 10KM/m, follow these steps:
Calculate the reactions at the supports
Draw the SFD by taking the upward forces as positive and starting from one end
Draw the BMD by taking the positive moment as clockwise and starting from one end
Mark the maximum values of SFD and BMD
Check the equilibrium and compatibility of the beam
I applied via Campus Placement and was interviewed before Sep 2021. There were 2 interview rounds.
It was pretty easy,
Patterns, logical reasoning kinda stuff
The 4th dimension of BIM refers to the element of time, allowing for the visualization and management of construction schedules.
4D BIM integrates scheduling information with 3D models to create a visual representation of the construction timeline.
It helps in identifying potential clashes and delays in the project schedule.
By simulating the construction process, stakeholders can better understand the sequence of activit...
The 7th dimension of BIM refers to the integration of facilities management data into the BIM model.
Facilities management data includes information about maintenance schedules, equipment specifications, and energy usage.
This dimension allows for the seamless transition of data from the construction phase to the operational phase of a building.
By incorporating facilities management data, BIM can help optimize building p...
I appeared for an interview in Jan 2022.
based on 1 review
Rating in categories
Field Engineer
263
salaries
| ₹1.7 L/yr - ₹4.8 L/yr |
Civil Engineer
51
salaries
| ₹2.8 L/yr - ₹10 L/yr |
Senior Manager
44
salaries
| ₹7.7 L/yr - ₹21.5 L/yr |
Assistant Resident Engineer
43
salaries
| ₹4.4 L/yr - ₹12 L/yr |
Resident Engineer
41
salaries
| ₹5.6 L/yr - ₹18.4 L/yr |
L&T Construction
Shapoorji Pallonji Group
Saint-Gobain
AECOM