Filter interviews by
Sop shared by them according to it need to do
I applied via Naukri.com and was interviewed before Oct 2023. There was 1 interview round.
Top trending discussions
posted on 5 Jan 2025
I applied via Job Portal and was interviewed in Dec 2024. There was 1 interview round.
I was interviewed in Nov 2024.
The procedure for wind calculation as per IS code involves determining the design wind speed, selecting the appropriate terrain category, and calculating the wind pressure.
Determine the design wind speed based on the location and height of the structure.
Select the appropriate terrain category (rural, urban, etc.) as per IS code guidelines.
Calculate the wind pressure using the formula provided in the IS code.
Consider fa...
A STAAD model for a fixed pole is a structural analysis and design model used to determine the stability and strength of a pole that is fixed in place.
In a STAAD model for a fixed pole, the pole is typically modeled as a vertical member with fixed supports at the base.
The model considers factors such as wind loads, dead loads, and any other relevant loads that may act on the pole.
The analysis helps in determining the s...
Key considerations in designing a square base plate
Ensure the base plate is large enough to support the load without excessive deflection
Select appropriate material and thickness to meet structural requirements
Consider the connection details for attaching the base plate to the structure
Account for any potential corrosion or environmental factors that may affect the base plate
Include provisions for anchor bolts or other...
I applied via Naukri.com and was interviewed in Oct 2024. There was 1 interview round.
Deep copy creates a new copy of an object with all nested objects also copied, while shallow copy creates a new object with references to the original nested objects.
Deep copy creates a new object and recursively copies all nested objects, resulting in a completely independent copy.
Shallow copy creates a new object but only copies the references to nested objects, so changes in nested objects reflect in both the origin...
foreach is used to iterate over an array and perform a function on each element, while map creates a new array by applying a function to each element.
foreach does not return a new array, while map does
foreach is used for side effects, while map is used for transformation
Example: forEach - let numbers = [1, 2, 3]; numbers.forEach(num => console.log(num)); // prints 1, 2, 3
Example: map - let numbers = [1, 2, 3]; let doub...
null is an intentional absence of any value, undefined means a variable has been declared but not assigned a value, and empty values are variables that have been assigned a value of empty string, empty array, or empty object.
null is used to represent the intentional absence of any value
undefined means a variable has been declared but not assigned a value
Empty values can be empty string (''), empty array ([]), or empty
My name is John Smith.
Full name is John Smith
Common name in English-speaking countries
Easy to remember and pronounce
I have 2 years of experience working as a Junior Assistant in a busy office environment.
2 years of experience as a Junior Assistant
Proficient in office administration tasks
Skilled in using Microsoft Office suite
Excellent communication and organizational skills
I have worked on various types of projects including data analysis, event planning, and marketing campaigns.
Data analysis project for a retail company to identify customer trends
Event planning project for a charity fundraiser event
Marketing campaign project for a new product launch
I have experience operating various types of office equipment such as printers, scanners, and copiers.
Printers
Scanners
Copiers
To plan for production tomorrow, it is important to assess current inventory, review upcoming orders, allocate resources, and communicate with team members.
Assess current inventory levels to determine what needs to be produced
Review upcoming orders to prioritize production schedule
Allocate resources such as materials, equipment, and manpower accordingly
Communicate with team members to ensure everyone is aware of their
The least count of a micrometer is 0.01 mm and the least count of a caliper is 0.02 mm.
Micrometer least count: 0.01 mm
Caliper least count: 0.02 mm
Concentricity, total runout, flatness, rf, and rt are important measurements in engineering and manufacturing.
Concentricity refers to the tolerance of the center point of a feature relative to its axis.
Total runout measures the maximum amount a feature may vary from true circularity when rotated.
Flatness is the deviation of a surface from a perfect plane.
Rf (roughness factor) and Rt (roughness total) are measurements o...
posted on 19 Dec 2024
I am applying for this job because of my passion for managing civil projects and my proven track record of successful project completions.
Passion for managing civil projects
Proven track record of successful project completions
Excited about the opportunity to contribute to impactful infrastructure projects
I requested a salary hike due to increased responsibilities, achievements, and market value.
Increased responsibilities in current role
Achievements such as successful completion of projects or exceeding targets
Market value based on industry standards and experience
Cost of living increase or inflation affecting expenses
The various stages of construction of the foundation of a building include site preparation, excavation, foundation design, footing construction, and foundation pouring.
Site preparation involves clearing the area and leveling the ground for construction.
Excavation is the process of digging a hole in the ground to create space for the foundation.
Foundation design is crucial to ensure the building's stability and load-be...
The design mix for concrete is the proportion of various ingredients like cement, sand, aggregates, and water to achieve the desired strength and durability.
Design mix is determined based on the required strength and durability of the concrete
It involves selecting the right proportions of cement, sand, aggregates, and water
Various factors like type of construction, exposure conditions, and desired workability influence...
posted on 10 Jan 2025
Agile methodologies in B2B projects involve frequent communication, adaptability, and collaboration with stakeholders.
Agile methodologies in B2B projects prioritize customer collaboration and responding to change over following a strict plan.
Regular feedback from stakeholders helps in adjusting project scope and priorities in real-time.
Cross-functional teams work together closely to deliver incremental value to the B2B...
I have extensive experience working with barcode scanners in various automation projects.
Implemented barcode scanning functionality in warehouse management system to track inventory
Integrated barcode scanners with automated testing tools for regression testing
Utilized barcode scanners in manufacturing processes to improve efficiency and accuracy
posted on 16 Jan 2025
I applied via Approached by Company and was interviewed in Nov 2024. There was 1 interview round.
I have experience parallelizing transformers by splitting them across multiple devices to minimize latency.
I have utilized frameworks like TensorFlow and PyTorch to parallelize transformers.
I approach splitting transformers by dividing the input data into chunks and distributing them across devices.
I optimize communication overhead by minimizing data transfer between devices.
I leverage techniques like data parallelism ...
Interview experience
based on 14 reviews
Rating in categories
Data Scientist
7
salaries
| ₹4 L/yr - ₹16 L/yr |
IT Executive
7
salaries
| ₹4.2 L/yr - ₹11 L/yr |
Assistant Manager
6
salaries
| ₹8 L/yr - ₹12 L/yr |
Deputy Manager
5
salaries
| ₹14 L/yr - ₹18 L/yr |
Business Analyst
4
salaries
| ₹3.8 L/yr - ₹7 L/yr |
DHL Global Forwarding
Kuehne + Nagel
DB Schenker
Expeditors International