Upload Button Icon Add office photos

Filter interviews by

DK Infrastructure Interview Questions and Answers

Be the first one to contribute and help others!

Interview questions from similar companies

I applied via Walk-in and was interviewed before Jul 2020. There were 4 interview rounds.

Interview Questionnaire 

1 Question

  • Q1. Education and previous work details

Interview Preparation Tips

Interview preparation tips for other job seekers - Very friendly cooperation.

I applied via Naukri.com and was interviewed in Jan 2021. There were 3 interview rounds.

Interview Questionnaire 

1 Question

  • Q1. Asked about previous experience

Interview Preparation Tips

Interview preparation tips for other job seekers - Be confident about what u know

I applied via Walk-in and was interviewed in Apr 2021. There was 1 interview round.

Interview Questionnaire 

5 Questions

  • Q1. Details of precast structures (Segment)
  • Ans. 

    Precast structures are pre-made concrete elements used in construction.

    • Precast segments are manufactured off-site and transported to the construction site for assembly.

    • They are commonly used in bridge construction, tunnels, and other large-scale infrastructure projects.

    • Precast segments can be designed to fit specific project requirements, reducing construction time and costs.

    • They offer high durability and strength, and...

  • Answered by AI
  • Q2. Which method use for segment casting?
  • Ans. 

    Segment casting can be done using various methods depending on the material and application.

    • One method is sand casting, where a mold is created using sand and the molten metal is poured into it.

    • Another method is investment casting, where a wax pattern is created and coated with ceramic before the metal is poured.

    • Die casting is a method where molten metal is forced into a mold under high pressure.

    • Continuous casting is u...

  • Answered by AI
  • Q3. Grade of concrete.
  • Ans. 

    Grade of concrete refers to its strength and durability.

    • Grade of concrete is denoted by a number followed by 'M' which stands for mix.

    • The number represents the compressive strength of concrete in megapascals (MPa).

    • Common grades of concrete include M10, M20, M30, etc.

    • Higher grade concrete has higher strength and durability.

    • For example, M20 grade concrete has a compressive strength of 20 MPa.

  • Answered by AI
  • Q4. Design mix of concrete.
  • Ans. 

    Design mix of concrete refers to the proportion of materials used in making concrete.

    • Design mix is determined based on the strength and durability requirements of the concrete.

    • The mix includes cement, water, aggregates (sand, gravel, crushed stone), and sometimes admixtures.

    • The proportions of each material are specified in terms of weight or volume.

    • For example, a common mix for general use is 1:2:3 (cement:sand:gravel)...

  • Answered by AI
  • Q5. Method of segment casting.
  • Ans. 

    Segment casting is a method of casting concrete segments for tunnel lining.

    • Segments are cast in a factory and transported to the tunnel site.

    • Segments are then assembled to form a complete tunnel lining.

    • This method is commonly used in tunnel construction projects.

    • It allows for faster construction and better quality control.

    • Examples include the Channel Tunnel and the SMART Tunnel in Malaysia.

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Knowledge of autocad, bbs, excel and word.

Skills evaluated in this interview

Interview experience
5
Excellent
Difficulty level
Hard
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Referral and was interviewed before May 2023. There was 1 interview round.

Round 1 - One-on-one 

(1 Question)

  • Q1. Brief about my work experience
  • Ans. I explained my experience in Highways & structures
  • Answered Anonymously

Interview Preparation Tips

Interview preparation tips for other job seekers - NEC ltd is wonderful company and excellent working culture.

Interview Questionnaire 

1 Question

  • Q1. Tell me about the project in your resume and your role in it

Interview Preparation Tips

Interview preparation tips for other job seekers - Prepare well on technical aspects in your project
Interview experience
1
Bad
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
No response

I applied via Job Portal and was interviewed in May 2024. There was 1 interview round.

Round 1 - Technical 

(2 Questions)

  • Q1. Stress strain curves
  • Q2. Asme codes for oil and gas
  • Ans. 

    ASME codes are widely used in the oil and gas industry to ensure safety and quality standards are met.

    • ASME B31.3 is the code for process piping in oil and gas facilities

    • ASME Section VIII is used for pressure vessels in oil and gas industry

    • ASME B31.4 is for liquid pipelines in oil and gas industry

  • Answered by AI

I applied via Walk-in

Round 1 - Group Discussion 

About your job, location, CTC

Round 2 - HR 

(2 Questions)

  • Q1. Gdjjdnksnd shgxkdjx vhkdkxnx
  • Q2. Years of experience & expectex salary facility provided by company

Interview Preparation Tips

Interview preparation tips for other job seekers - Always ready for technical knowledge from your site
Interview experience
5
Excellent
Difficulty level
Hard
Process Duration
2-4 weeks
Result
No response

I applied via Walk-in and was interviewed in Apr 2023. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(3 Questions)

  • Q1. What is the construction procedure
  • Ans. 

    Construction procedure involves planning, designing, obtaining permits, site preparation, foundation construction, framing, finishing, and inspections.

    • Planning and designing the project

    • Obtaining necessary permits

    • Site preparation and excavation

    • Foundation construction

    • Framing and structural work

    • Installation of utilities and systems

    • Finishing touches such as painting and flooring

    • Final inspections and approvals

  • Answered by AI
  • Q2. What's is the beam lapping position
  • Ans. 

    Beam lapping position refers to the location where two beams overlap or intersect in a structural element.

    • Beam lapping position is important for ensuring structural integrity and load-bearing capacity.

    • Common beam lapping positions include end-to-end, side-by-side, and staggered lapping.

    • Proper beam lapping position is determined by engineering calculations and design specifications.

  • Answered by AI
  • Q3. What is the tile procedure
  • Ans. 

    The tile procedure is a method used in computer graphics to fill a region with a repeating pattern or image.

    • The tile procedure involves dividing the region into smaller tiles and filling each tile with the desired pattern or image.

    • It is commonly used in graphic design software to create seamless textures or backgrounds.

    • The size and shape of the tiles can be adjusted to achieve different visual effects.

    • Examples of tile ...

  • Answered by AI
Round 1 - One-on-one 

(3 Questions)

  • Q1. Tell me about yourself
  • Q2. How will you fit in our company
  • Q3. Are you a good fit or are you not
Round 2 - HR 

(2 Questions)

  • Q1. Are you a good fit or not
  • Q2. You are a good fit or not

Interview Preparation Tips

Interview preparation tips for other job seekers - Good company. Good. Very good interview. Do well.
Round 1 - One-on-one 

(2 Questions)

  • Q1. What is your experience
  • Ans. 

    I have 5 years of experience in management roles, including 2 years as an Assistant Manager.

    • 5 years of management experience

    • 2 years as an Assistant Manager

    • Successfully led a team of 10 employees

    • Implemented new strategies to improve productivity and efficiency

    • Trained and mentored new employees

  • Answered by AI
  • Q2. What is the thickness of subgrade
  • Ans. 

    The thickness of subgrade varies depending on the type of construction and soil conditions.

    • The thickness of subgrade is determined based on the load-bearing capacity required for the structure.

    • It is typically measured in inches or centimeters.

    • For example, in road construction, the subgrade thickness can range from 6 to 12 inches.

    • In building construction, it may vary from a few inches to several feet depending on the bu

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Hhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhh

DK Infrastructure Interview FAQs

How to prepare for DK Infrastructure interview?
Go through your CV in detail and study all the technologies mentioned in your CV. Prepare at least two technologies or languages in depth if you are appearing for a technical interview at DK Infrastructure. The most common topics and skills that interviewers at DK Infrastructure expect are Adaptability, Problem Solving and Time Management.

Tell us how to improve this page.

DK Infrastructure Reviews and Ratings

based on 10 reviews

4.5/5

Rating in categories

4.8

Skill development

4.8

Work-life balance

4.7

Salary

4.6

Job security

4.8

Company culture

4.6

Promotions

4.9

Work satisfaction

Explore 10 Reviews and Ratings
Project Manager
5 salaries
unlock blur

₹9.2 L/yr - ₹15 L/yr

Project Engineer - Civil
4 salaries
unlock blur

₹6 L/yr - ₹6 L/yr

Accountant
3 salaries
unlock blur

₹1.8 L/yr - ₹2.1 L/yr

Explore more salaries
Compare DK Infrastructure with

Sterling & Wilson

4.1
Compare

Nasser S. Al Hajri Corporation

3.6
Compare

Navayuga Engineering Company

3.9
Compare

Ramky Infrastructure

4.2
Compare
Did you find this page helpful?
Yes No
write
Share an Interview