Filter interviews by
Top trending discussions
I applied via Walk-in and was interviewed before Aug 2020. There was 1 interview round.
Bus bar schemes are different ways of connecting bus bars in power systems.
Single bus bar scheme
Double bus bar scheme
Main and transfer bus bar scheme
Ring bus bar scheme
Breaker and a half scheme
Mesh bus bar scheme
The equipment sequence for any line bay starts with the circuit breaker and ends with the transformer.
The circuit breaker is the first equipment in the sequence.
Next comes the isolator switch.
After that, the earth switch is operated.
Then the line disconnector is opened.
Finally, the transformer is disconnected from the line.
The sequence is reversed when the line bay is put back into service.
I applied via Company Website and was interviewed before Jan 2022. There were 3 interview rounds.
posted on 11 Apr 2022
posted on 29 Nov 2022
I applied via Naukri.com and was interviewed before Nov 2021. There were 2 interview rounds.
Improved efficiency of production line at XYZ manufacturing plant
Implemented lean manufacturing principles to reduce waste and increase productivity
Introduced automation in certain processes to reduce manual labor and increase accuracy
Optimized supply chain management to ensure timely delivery of raw materials
Trained and empowered employees to identify and solve problems on the production line
Implemented a continuous i...
I applied via Job Portal
Officer
122
salaries
| ₹1.8 L/yr - ₹5.1 L/yr |
Executive
115
salaries
| ₹3.2 L/yr - ₹9.6 L/yr |
Assistant Manager
102
salaries
| ₹4.9 L/yr - ₹11.6 L/yr |
Senior Officer
100
salaries
| ₹2.7 L/yr - ₹5.9 L/yr |
Senior Executive
95
salaries
| ₹5.4 L/yr - ₹9.2 L/yr |
OPPO
LG Electronics
Cargill
AECOM