Dilip Buildcon Senior Executive QA Interview Questions and Answers

Updated 12 Apr 2024

Dilip Buildcon Senior Executive QA Interview Experiences

1 interview found

Interview experience
4
Good
Difficulty level
-
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Recruitment Consulltant and was interviewed in Mar 2024. There was 1 interview round.

Interview questions from similar companies

Interview experience
5
Excellent
Difficulty level
Easy
Process Duration
-
Result
Selected Selected
Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Don’t add your photo or details such as gender, age, and address in your resume. These details do not add any value.
View all Resume tips
Round 2 - Technical 

(2 Questions)

  • Q1. Civil engineering
  • Q2. Civil engineering responsibility timely site work .
Round 3 - Technical 

(2 Questions)

  • Q1. Civil engineering
  • Q2. Site relative question
Round 4 - Technical 

(2 Questions)

  • Q1. Site Execution qution
  • Q2. Highway Road Project qution

Interview Preparation Tips

Interview preparation tips for other job seekers - Bridges ,Highway Road Project and Railway Project flyovers
Interview experience
3
Average
Difficulty level
-
Process Duration
-
Result
-

I appeared for an interview in Mar 2023.

Interview Preparation Tips

Interview preparation tips for other job seekers - Dear sir,
This is with reference to your job requirement the position of SME I am interested in this position and would appreciate your consideration as a candidate for this role. I believe that my skills. qualifications make me a suitable candidate for the job. I'm working @ SAKTHI ASSOCIATES from 2018 June till Know. Currently my project work @EPIL (Engineering Project India Limited) I have completed B.Tech in Civil from Bharath university. I have Experience in Site Engineering 4+ Years . I have Completed project
1.ETP (Effluent Treatment plant )
2.RO ( Reverse Osmosis)
3.Weaving Shead Textile Industry
4.TCL Chinese pvt Ltd
5. Residential building G+ 4
I am confident that my skills will be the right fit for the job Please find the attached CV in the email for further reference.

Thank you for your time and consideration
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Approached by Company and was interviewed before Oct 2022. There were 2 interview rounds.

Interview Preparation Tips

Interview preparation tips for other job seekers - Keep interview frelly and discussion
Interview experience
4
Good
Difficulty level
-
Process Duration
-
Result
-

I applied via Naukri.com and was interviewed in Jul 2021. There was 1 interview round.

Interview Questionnaire 

7 Questions

  • Q1. 1) Describe about Launching girder, Launching operations methods
  • Ans. 

    Launching girder is a temporary structure used in construction to move and position heavy loads.

    • Launching girder is typically made of steel and consists of multiple sections that can be assembled and disassembled.

    • It is used in the construction of bridges, viaducts, and other structures to lift and move precast concrete segments into position.

    • The launching operation involves the step-by-step movement of the girder along...

  • Answered by AI
  • Q2. 2) Launching girder steel grade, macalloy bar charactersic, capacity
  • Q3. 3) Tendon grouting activity
  • Q4. 4)Heavy lifting activities,
  • Q5. 5) Glueing technic,about materials character
  • Q6. 6)Bearing work
  • Q7. 6)ROB Erection work

Interview Preparation Tips

Interview preparation tips for other job seekers - 1)study drawing and read every point mentioned in notes point of drawing carefully..
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I appeared for an interview before Nov 2022.

Interview experience
3
Average
Difficulty level
Easy
Process Duration
-
Result
Selected Selected

I applied via Job Portal

Interview Preparation Tips

Interview preparation tips for other job seekers - Piling work(550mm,600mm,750mm and 1000mm dia pile),survey,Client bills

I appeared for an interview before Jul 2016.

Interview Preparation Tips

Round: Group Discussion
Duration: 4 hours 5 minutes

Round: Test
Duration: 2 hours 5 minutes

Contribute & help others!
anonymous
You can choose to be anonymous

Recently Viewed

INTERVIEWS

Dilip Buildcon

No Interviews

INTERVIEWS

Domino's Pizza

No Interviews

INTERVIEWS

Dilip Buildcon

No Interviews

INTERVIEWS

Dilip Buildcon

No Interviews

INTERVIEWS

Dilip Buildcon

No Interviews

INTERVIEWS

Dilip Buildcon

No Interviews

INTERVIEWS

Saint-Gobain

No Interviews

INTERVIEWS

Saint-Gobain

No Interviews

INTERVIEWS

G R Infraprojects

No Interviews

INTERVIEWS

Dilip Buildcon

No Interviews

Tell us how to improve this page.

Dilip Buildcon Senior Executive QA Interview Process

based on 1 interview

Interview experience

4
  
Good
View more

Fast track your campus placements

View all
Senior Engineer
213 salaries
unlock blur

₹4 L/yr - ₹11.1 L/yr

Asst Store
199 salaries
unlock blur

₹1.5 L/yr - ₹4.2 L/yr

Assistant Manager
196 salaries
unlock blur

₹3.4 L/yr - ₹11 L/yr

Store Executive
192 salaries
unlock blur

₹2.2 L/yr - ₹5.2 L/yr

Structural Engineer
178 salaries
unlock blur

₹2.7 L/yr - ₹6.7 L/yr

Explore more salaries
Compare Dilip Buildcon with

Ashoka Buildcon

4.1
Compare

IRB Infrastructure

4.0
Compare

Nagarjuna Construction Company

4.1
Compare

PNC Infratech

3.8
Compare
Did you find this page helpful?
Yes No
write
Share an Interview