Filter interviews by
I applied via Recruitment Consultant and was interviewed in Apr 2021. There were 3 interview rounds.
Top trending discussions
Initial setting time of cement is the time taken by cement to harden and resist penetration by a standard needle.
Initial setting time is affected by factors like temperature, water-cement ratio, and type of cement.
The standard needle used for testing has a diameter of 1.13 mm and a length of 50 mm.
The initial setting time of ordinary Portland cement is around 30 minutes.
The initial setting time of rapid hardening cemen
Lime test stone test brick test
Basic Study
I appeared for an interview in Oct 2017.
Questions related to torque, gearbox, torque limiter and coupling failure, yawing system bearing, and accumulator.
Torque is a measure of rotational force.
Gearbox works by transmitting power from the engine to the wheels.
Torque limiter failure can be caused by overloading or overheating.
Coupling failure can be caused by misalignment or excessive torque.
Yawing system bearing is a type of roller bearing used to support th...
A transformer is an electrical device that transfers electrical energy from one circuit to another through electromagnetic induction.
Transformers are used to increase or decrease the voltage of an alternating current (AC) power supply.
They consist of two coils of wire, called the primary and secondary coils, wrapped around a magnetic core.
When an AC current flows through the primary coil, it creates a magnetic field th...
Ohm's law states that the current through a conductor between two points is directly proportional to the voltage across the two points.
Ohm's law is represented by the equation V = IR, where V is voltage, I is current, and R is resistance.
The power formula is P = VI, where P is power, V is voltage, and I is current.
Ohm's law is used to calculate the resistance of a circuit and to determine the amount of current flowing ...
I appeared for an interview in Feb 2025.
Wind power generation converts wind energy into electricity using turbines, harnessing natural wind flow for sustainable energy.
Wind turbines capture kinetic energy from wind.
The rotor blades spin, turning a shaft connected to a generator.
The generator converts mechanical energy into electrical energy.
Electricity is transmitted through power lines to homes and businesses.
Example: Offshore wind farms utilize strong sea
The supply process in a grid system involves generation, transmission, distribution, and consumption of electrical energy.
1. Generation: Electricity is generated at power plants using various sources like coal, natural gas, nuclear, or renewables (e.g., solar, wind).
2. Transmission: High-voltage transmission lines carry electricity over long distances to minimize energy loss.
3. Substations: Voltage is reduced at substa...
I applied via Company Website and was interviewed in Apr 2021. There was 1 interview round.
I have 2 years of experience in the wind field.
I have worked on wind turbine design and optimization projects.
I have conducted wind resource assessments for potential wind farm sites.
I have experience in analyzing wind data and performing wind flow modeling.
I have knowledge of wind energy conversion systems and their components.
I have worked with software tools like WindPRO and WAsP for wind energy analysis.
based on 11 reviews
Rating in categories
Quality Engineer
325
salaries
| ₹1.1 L/yr - ₹4 L/yr |
Production Engineer
168
salaries
| ₹0.9 L/yr - ₹6 L/yr |
Production Supervisor
96
salaries
| ₹1 L/yr - ₹4.6 L/yr |
Graduate Engineer Trainee (Get)
90
salaries
| ₹1 L/yr - ₹3 L/yr |
Design Engineer
87
salaries
| ₹1.5 L/yr - ₹5.5 L/yr |
Vestas
Wind World
Siemens Energy
Steag Energy Services