Lap length is the amount of overlap required between two reinforcing bars in concrete structures.
Lap length ensures the transfer of load from one bar to another.
It is necessary to provide sufficient lap length to maintain the strength and integrity of the structure.
The lap length depends on factors such as the type of structure, bar diameter, and the grade of concrete.
For example, in a beam, the lap length is typically...
The cover block size in a column refers to the thickness of the concrete cover provided to the reinforcement bars.
The cover block size is typically specified in the construction drawings or as per the design requirements.
It is important to provide an adequate cover to protect the reinforcement from corrosion and ensure its durability.
The cover block size may vary depending on factors such as the type of structure, expo...
Top trending discussions
I applied via Approached by Company and was interviewed in Mar 2023. There were 3 interview rounds.
I applied via Naukri.com and was interviewed before Aug 2023. There was 1 interview round.
A shunt relay in an ACB is used to provide protection against overcurrents by diverting excess current away from the main circuit.
Shunt relay is connected in parallel with the main circuit of the ACB.
It detects overcurrents and activates to divert the excess current through a shunt path.
This helps in protecting the main circuit from damage due to overcurrents.
Shunt relays are commonly used in Air Circuit Breakers (ACBs...
CoC in HVAC stands for Certificate of Conformance, which is a document certifying that a product meets specified requirements.
CoC in HVAC is a Certificate of Conformance that ensures a product meets specific requirements.
It is often required in HVAC projects to ensure quality and compliance.
CoC may include details such as product specifications, testing results, and manufacturer information.
Biological oxygen demand (BOD) and Chemical oxygen demand (COD) are important parameters in wastewater treatment plants.
Biological oxygen demand (BOD) is a measure of the amount of dissolved oxygen needed by aerobic biological organisms to break down organic material in water.
Carbonaceous oxygen demand (COD) is a measure of the amount of oxygen required to oxidize all the organic and inorganic matter in water.
BOD is a ...
A voltage monitoring relay is a device that monitors voltage levels and triggers an alarm or protective action if the voltage exceeds or falls below a set threshold.
Monitors voltage levels in electrical systems
Triggers alarm or protective action if voltage exceeds or falls below set threshold
Used to protect equipment from damage due to voltage fluctuations
WTP plant works on the principle of physical and chemical processes to remove impurities from water.
Water enters the plant and goes through processes like coagulation, flocculation, sedimentation, filtration, and disinfection.
Coagulation involves adding chemicals to water to make impurities clump together.
Flocculation helps in forming larger particles called floc for easier removal.
Sedimentation allows the floc to sett...
I provide daily and monthly reports on project progress, issues, and key metrics to track performance.
Daily reports include updates on tasks completed, challenges faced, and plans for the next day.
Monthly reports summarize overall progress, budget status, and any potential risks or delays.
Reports may also include key performance indicators (KPIs) such as project milestones achieved, budget variance, and resource utiliz...
posted on 6 Feb 2024
I applied via Naukri.com and was interviewed in Jan 2024. There were 3 interview rounds.
Written paper as per site and codes
It’s about Quality and execution with VP and audit team
I applied via Approached by Company and was interviewed before Aug 2022. There were 4 interview rounds.
I applied via Naukri.com and was interviewed before Oct 2020. There was 1 interview round.
Deduction in shuttering criteria refers to the reduction in the amount of shuttering material used in construction.
Deduction in shuttering criteria is done to reduce the cost of construction.
It is also done to reduce the time taken for construction.
The deduction is usually done based on the strength of the concrete being used.
For example, if the concrete strength is high, less shuttering material is required.
The deduct...
I applied via Approached by Company
I applied via Company Website and was interviewed in Apr 2023. There were 3 interview rounds.
OPC cement is made from limestone and clay, while PPC cement is made from fly ash and clay.
OPC cement has higher strength and is used for construction of high-rise buildings and bridges.
PPC cement has better workability and is used for plastering and finishing works.
PPC cement is more eco-friendly as it uses industrial waste as a raw material.
OPC cement is costlier than PPC cement.
OPC cement is commonly used in areas w...
A two way slab is a type of reinforced concrete slab that is supported by beams on all four sides.
Two way slab is used in buildings with large column spacing
It is designed to resist both positive and negative bending moments
It is commonly used in parking garages, commercial buildings, and residential buildings
Two way slab is more economical than one way slab for larger spans
Dgijvcctuhgcvh hjjcc ghjj
I applied via Naukri.com and was interviewed in Jun 2024. There were 2 interview rounds.
Work like a family in jll
based on 1 interview
Interview experience
Executive Accountant
13
salaries
| ₹1.5 L/yr - ₹4.2 L/yr |
Process Coordinator
7
salaries
| ₹2 L/yr - ₹3.2 L/yr |
Site Engineer
6
salaries
| ₹3 L/yr - ₹4.2 L/yr |
Senior Engineer
5
salaries
| ₹3 L/yr - ₹4.8 L/yr |
Accounts Manager
5
salaries
| ₹5 L/yr - ₹8.1 L/yr |
JLL
CBRE
Cushman & Wakefield
Colliers India