Upload Button Icon Add office photos

Filter interviews by

Dhariwal Infrastructure Junior Engineer Interview Questions and Answers

Updated 13 Feb 2021

Dhariwal Infrastructure Junior Engineer Interview Experiences

Interview questions from similar companies

I applied via Walk-in and was interviewed before Aug 2020. There were 3 interview rounds.

Interview Questionnaire 

5 Questions

  • Q1. Field of your work
  • Ans. 

    I work in the field of software engineering.

    • Developing and maintaining software applications

    • Designing and implementing software solutions

    • Collaborating with cross-functional teams

    • Troubleshooting and debugging software issues

    • Ensuring code quality and adherence to best practices

  • Answered by AI
  • Q2. What about your work
  • Q3. Complete plumbing and firefighting work including STP,WTP,S.POOL, and external sewerage system and storm water and firefighting work and water supply too
  • Q4. Tell about pipes you used at project
  • Q5. GI in water supply and ci ln soil and waste, glazed stoneware in external sewerage system and RCC in storm water,MS in firefighting

Interview Preparation Tips

Interview preparation tips for other job seekers - Well and good

I applied via Company Website and was interviewed in May 2022. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(2 Questions)

  • Q1. What is your daily work and responsibilities in current project?
  • Q2. What is your current project all about?

Interview Preparation Tips

Interview preparation tips for other job seekers - Prepare well for technical questions I.e. mep related question and software like autocad ms excel etc
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
6-8 weeks
Result
Selected Selected

I appeared for an interview before Mar 2024, where I was asked the following questions.

  • Q1. About experience
  • Q2. How to handle your project
  • Ans. 

    Effective project handling involves planning, communication, and adaptability to ensure successful outcomes.

    • Define clear project goals and objectives to align the team.

    • Utilize project management tools like Jira or Trello for tracking progress.

    • Conduct regular team meetings to discuss updates and challenges.

    • Implement Agile methodologies to adapt to changes quickly.

    • Document all processes and decisions for future reference

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - For good experience and gain knowledge
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Approached by Company and was interviewed before Aug 2022. There were 4 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(1 Question)

  • Q1. Technical questions
Round 3 - Technical 

(1 Question)

  • Q1. Technical questions
Round 4 - HR 

(1 Question)

  • Q1. Salary discussion
Interview experience
5
Excellent
Difficulty level
Hard
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Naukri.com and was interviewed in Jan 2024. There were 3 interview rounds.

Round 1 - Aptitude Test 

Written paper as per site and codes

Round 2 - Group Discussion 

It’s about Quality and execution with VP and audit team

Round 3 - HR 

(2 Questions)

  • Q1. Salary discussion
  • Q2. Joining procedures and company policy

I applied via Naukri.com and was interviewed before Oct 2020. There was 1 interview round.

Interview Questionnaire 

1 Question

  • Q1. Deduction in shuttering criteria
  • Ans. 

    Deduction in shuttering criteria refers to the reduction in the amount of shuttering material used in construction.

    • Deduction in shuttering criteria is done to reduce the cost of construction.

    • It is also done to reduce the time taken for construction.

    • The deduction is usually done based on the strength of the concrete being used.

    • For example, if the concrete strength is high, less shuttering material is required.

    • The deduct...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Prepared yourself for interview to get selection

I applied via Job Portal

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - HR 

(1 Question)

  • Q1. What are you doing this company is looking for an interview.

Interview Preparation Tips

Interview preparation tips for other job seekers - This company is good working condition and new income certificate 👍
Interview experience
1
Bad
Difficulty level
Hard
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Referral and was interviewed before Mar 2022. There was 1 interview round.

Round 1 - Technical 

(3 Questions)

  • Q1. About civil engineering for site and billing Quantity surveying and rate analysis .actual site quantity measurements and check contractor bill and certification
  • Q2. Concrete quantity calculations
  • Q3. As per site and as per drawing calculated

Interview Preparation Tips

Interview preparation tips for other job seekers - No future and no skill and no development and no life balance

I applied via Walk-in and was interviewed in Jun 2021. There was 1 interview round.

Interview Questionnaire 

3 Questions

  • Q1. About your self
  • Q2. My experience as an engineer
  • Q3. How to execute work on site
  • Ans. 

    Execution of work on site involves planning, coordination, and management of resources to ensure timely completion of the project.

    • Develop a detailed project plan and schedule

    • Allocate resources effectively and efficiently

    • Ensure safety measures are in place

    • Regularly monitor and report progress

    • Address any issues or challenges that arise

    • Maintain good communication with stakeholders

    • Ensure quality control and adherence to sp...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - BE polite. And humble and be in confidence

Tell us how to improve this page.

Interview Questions from Similar Companies

Sunteck Realty Interview Questions
3.3
 • 23 Interviews
Pittie Group Interview Questions
2.7
 • 17 Interviews
ASSA ABLOY Interview Questions
3.5
 • 17 Interviews
Ambience Group Interview Questions
3.3
 • 16 Interviews
Alpha Corp Interview Questions
4.4
 • 14 Interviews
Pin Click Interview Questions
3.2
 • 12 Interviews
Maxinfra Interview Questions
4.2
 • 11 Interviews
View all
Dhariwal Infrastructure Junior Engineer Salary
based on 6 salaries
₹2.4 L/yr - ₹10.5 L/yr
84% more than the average Junior Engineer Salary in India
View more details

Dhariwal Infrastructure Junior Engineer Reviews and Ratings

based on 1 review

5.0/5

Rating in categories

4.0

Skill development

3.0

Work-life balance

4.0

Salary

4.0

Job security

4.0

Company culture

5.0

Promotions

4.0

Work satisfaction

Explore 1 Review and Rating
Deputy Manager
7 salaries
unlock blur

₹17 L/yr - ₹23 L/yr

Assistant Manager
6 salaries
unlock blur

₹9 L/yr - ₹12 L/yr

Assistant Engineer
6 salaries
unlock blur

₹7.5 L/yr - ₹7.5 L/yr

Junior Engineer
6 salaries
unlock blur

₹2.4 L/yr - ₹10.5 L/yr

Chemist
5 salaries
unlock blur

₹5.5 L/yr - ₹11.2 L/yr

Explore more salaries
Compare Dhariwal Infrastructure with

Signature Global

4.0
Compare

Sunteck Realty

3.3
Compare

Pittie Group

2.7
Compare

Pin Click

3.2
Compare
Did you find this page helpful?
Yes No
write
Share an Interview