Upload Button Icon Add office photos

Filter interviews by

Dhariwal Infrastructure Executive Engineer Interview Questions and Answers

Updated 10 May 2022

Dhariwal Infrastructure Executive Engineer Interview Experiences

1 interview found

I applied via Walk-in and was interviewed in Nov 2020. There were 3 interview rounds.

Interview Questionnaire 

1 Question

  • Q1. Technical round was good. Very knowledgable...

Interview Preparation Tips

Interview preparation tips for other job seekers - If you have very good domain knowledge then you have fair chance.

Interview questions from similar companies

Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Referral and was interviewed before Dec 2023. There was 1 interview round.

Round 1 - HR 

(2 Questions)

  • Q1. Discussion about College time studies
  • Q2. Hobbies and Managing

Interview Preparation Tips

Topics to prepare for Maxinfra QA QC Engineer interview:
  • Construction knowledge
  • Concrete technology
  • IS CODES
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed before Sep 2023. There was 1 interview round.

Round 1 - Technical 

(2 Questions)

  • Q1. What is the current carrying capacity of 185sqmm al cable .
  • Ans. 

    The current carrying capacity of a 185sqmm al cable depends on various factors such as the material, insulation, and installation method.

    • The current carrying capacity of a cable is typically determined by the manufacturer and specified in the cable's datasheet.

    • Factors such as the material (aluminum in this case), insulation type, ambient temperature, and installation method all affect the current carrying capacity.

    • For ...

  • Answered by AI
  • Q2. What is the Height of db location on wall.
  • Ans. 

    The height of a dB location on a wall depends on the specific requirements of the project or application.

    • The height of a dB location on a wall is typically determined by the specific needs of the project or application.

    • Factors such as the type of equipment being installed, the purpose of the dB location, and the layout of the space will influence the height chosen.

    • For example, in a control room setting, dB locations ma...

  • Answered by AI

Tell us how to improve this page.

Dhariwal Infrastructure Executive Engineer Reviews and Ratings

based on 1 review

5.0/5

Rating in categories

5.0

Skill development

5.0

Work-life balance

5.0

Salary

5.0

Job security

5.0

Company culture

5.0

Promotions

4.0

Work satisfaction

Explore 1 Review and Rating
Deputy Manager
7 salaries
unlock blur

₹17 L/yr - ₹23 L/yr

Assistant Manager
6 salaries
unlock blur

₹9 L/yr - ₹12 L/yr

Junior Engineer
6 salaries
unlock blur

₹3.5 L/yr - ₹11.2 L/yr

Chemist
5 salaries
unlock blur

₹5.5 L/yr - ₹11.2 L/yr

Manager Mechanical
5 salaries
unlock blur

₹25.5 L/yr - ₹40 L/yr

Explore more salaries
Compare Dhariwal Infrastructure with

Larsen & Toubro Limited

4.0
Compare

Tata Projects

4.2
Compare

GMR Group

4.1
Compare

Reliance Infrastructure

4.1
Compare
Did you find this page helpful?
Yes No
write
Share an Interview