Desai Construction Project Engineer Interview Experiences

1 interview found

Project Engineer Interview Questions & Answers

user image Akash Lalla

posted on 13 Nov 2021

Interview Questionnaire 

1 Question

  • Q1. Concrete,and steel

Interview Preparation Tips

Interview preparation tips for other job seekers - Site work any work grade of concrete,beam cover,lap length,jangal length

Interview questions from similar companies

Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed before Apr 2022. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Coding Test 

It was basic level coding question. you can answer if you strong in basic level of java

Round 3 - HR 

(1 Question)

  • Q1. Why CTS? are u willing to work in any location? expected salary?
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - One-on-one 

(1 Question)

  • Q1. Many questions on project and leadership

Interview Preparation Tips

Interview preparation tips for other job seekers - Brush your skills, practice and always be honest.. confidence is extremely important and with only truth you can be super confident. Hiding truth may also get job but for job satisfaction only truth will help and Honest unbiased reviewer will definitely find you. Have patience and All the best!

I was interviewed in Aug 2022.

Round 1 - Technical 

(14 Questions)

  • Q1. Two types of road 1:- Flexible pavements 2:- Rigid pavement Surveying, NGL, Enchrochment, OGL
  • Q2. FLEXIBLE PAVEMENT 1:- Embankment:- taking thickness 3m compacted .approximate,as per site conditions. Large size of soil particles 75mm lumps and cloud. Liquid limit <50% Plastic limit <25% Swelling a...
  • Q3. 2:- Subgrade:- Total thickness 500mm compacted two layer 250mm &250mm vibration roller. Large size of soil particles 50mm lumps and cloud, Effective CBR as per design Compaction :- 97% Subgrade grad...
  • Q4. Emulsion :- 1 :- prime coat :- low viscous cut back bitumen on wmm surfaces area and filling Up pores, voids . 2:- Tack coat:- Light application bitumen, asphalt, emulsion, and diluted water on the...
  • Q5. DBM:- it total thickness 150mm two layer compacted 75mm&75 mm, aggregate size 20mm to. 28mm,VG30 Grade bitumen .
  • Q6. Emulsion:- Tackcoat :- Light application of. Bitumen, asphalt, emulsion, and dilute water on the Surfaces area of DBM.
  • Q7. BC :- Total thickness 40mm/ 50mm compacted. It is mixture of aggregate chips 13.1mm. and bitumen VG30 grade. Seal coat :- Total thicknesses of 6 to 8mm Mix with bitumen, gravel,and coars sand.
  • Q8. Bituminous laying temperature 130 degree celceious to 150 degree celceious. Bituminous rolling temperature 80 degree celceious to 100 degree celceious.
  • Ans. 

    Bituminous laying temperature is 130-150°C and rolling temperature is 80-100°C.

    • Bituminous laying requires higher temperature than rolling.

    • Temperature range ensures proper compaction and adhesion.

    • Temperature can vary based on the type of bitumen and aggregate used.

    • Proper temperature control is crucial for quality bituminous pavement.

  • Answered by AI
  • Q9. RIGID PAVEMENT:-All process is a same above embankment to GSB. DLC:-150MM THICKNESSES TOLERANCE +/_6MM COMACTED PQC PAVEMENT:- 300MM THICKNESSES TOLERANCE +/-6MM COMPACTED
  • Q10. DLC:- Material suitability 1:- Aggregate size is 26.5 mm 2:-water absorption 2% max 3:- Soundness test:- ..Naso4= 12% Mgso4=18% 4:...
  • Ans. 

    Material suitability criteria for aggregate in construction projects.

    • Aggregate size should be 26.5 mm or less.

    • Water absorption should not exceed 2%.

    • Soundness test should show Naso4 not more than 12% and Mgso4 not more than 18%.

    • Angle of abrasion should be less than 35% with max FI & EI less than 35%.

    • Equivalent weight of sand should not be less than 50%.

    • Aggregate should not be alkaline reactive.

    • MDD & MCC should be as per

  • Answered by AI
  • Q11. DESIGN PROCEDURE. 1:-Use M15 grade concete. Aggregate and cement ratio 12:1 2:- The minimum cement content 150 kg/ cum. If the fly ash more than 20% the minimum cement contents 120 kg/cum. 3:-compre...
  • Ans. 

    The design procedure for DLC mix includes using M15 grade concrete, minimum cement content of 150 kg/cum, and achieving a compressive strength of at least 10 MPA after 7 days of curing.

    • Use M15 grade concrete with aggregate and cement ratio of 12:1

    • Minimum cement content of 150 kg/cum, or 120 kg/cum if fly ash content is over 20%

    • Achieve a compressive strength of at least 10 MPA after 7 days of curing

    • DLC mix should be hom...

  • Answered by AI
  • Q12. PQC :- Total thicknesses 300mm compacted tolerance +_6mm Material sutabilitey:- 1:- Aggregate size 31.5mm Water absorption to GSB DlC is same for PQC.
  • Ans. 

    The question is about the suitability of aggregate size and water absorption for PQC with a total thickness of 300mm and tolerance of +/-6mm.

    • Aggregate size of 31.5mm is suitable for PQC with a total thickness of 300mm and tolerance of +/-6mm.

    • Water absorption to GSB DLC being the same for PQC is also suitable.

    • The suitability of the material is important for the successful completion of the project.

  • Answered by AI
  • Q13. DESINGN PROCEDURE:- 1:- The minimum cement content 360 kg/ cum, if the fly ash is more than 2o% The minimum cement content 310 kg percum. 2:-The flexuar strength of cement concete after 28day curing...
  • Ans. 

    The design procedure for cement concrete includes minimum cement content, strength requirements, dowel bar and tie bar specifications, and surface preparation and curing techniques.

    • Minimum cement content of 360 kg/cum if fly ash is more than 20%, and 310 kg/cum otherwise

    • Flexural strength of cement concrete after 28-day curing should be 4.5 MPa, and compressive strength should be 40 MPa

    • Dowel bar size of 32mm dia and 300...

  • Answered by AI
  • Q14. National highyway =2 to 4 lane Expressway. =6 to lane Construction coast of National 8 to 10 core /km Expressway construction coast= 14 core to 16core/ km

Interview Preparation Tips

Interview preparation tips for other job seekers - Expressway many smart and intlegent featue
HTMS - High traffic management system
VIDS:- Visual icedent deduction system
Many facilities in Expressway
1:- Excess rap
2;- line divider
3:-Grade seperation
4 Elevated section
Expressway is not multiple lane. It connected national highway
Interview experience
5
Excellent
Difficulty level
Hard
Process Duration
2-4 weeks
Result
Selected Selected

I applied via Company Website and was interviewed in Jul 2022. There was 1 interview round.

Round 1 - Telephoning 

(6 Questions)

  • Q1. Structure drowning and quality
  • Q2. Quality quality and management
  • Q3. Side management and side heandil
  • Q4. All types drowing and project completion
  • Ans. 

    Drawing is an essential part of project completion in civil engineering.

    • Drawings are used to communicate design intent and construction details.

    • Different types of drawings include site plans, floor plans, elevations, sections, and details.

    • Drawings must be accurate and up-to-date to ensure project success.

    • Project completion involves not only finishing construction but also obtaining necessary approvals and permits.

    • Effec...

  • Answered by AI
  • Q5. Steel and shuttering work
  • Q6. Mivan shuttering work good knowledge

Interview Preparation Tips

Interview preparation tips for other job seekers - Mivan shuttering and conventional shuttering work and all types of structure
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed before Feb 2023. There was 1 interview round.

Round 1 - Technical 

(1 Question)

  • Q1. Based on previous experience
Round 1 - HR 

(3 Questions)

  • Q1. What are your strengths and weaknesses?
  • Q2. Tell me about yourself.
  • Q3. Very patience. Salary Neagotation.

Interview Preparation Tips

Interview preparation tips for other job seekers - Good company technicaly sound.
Good management.
Good wellfare.
Over all good.
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed before Apr 2022. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Don’t add your photo or details such as gender, age, and address in your resume. These details do not add any value.
View all tips
Round 2 - Coding Test 

It was basic level coding question. you can answer if you strong in basic level of java

Round 3 - HR 

(1 Question)

  • Q1. Why CTS? are u willing to work in any location? expected salary?

Desai Construction Interview FAQs

How to prepare for Desai Construction Project Engineer interview?
Go through your CV in detail and study all the technologies mentioned in your CV. Prepare at least two technologies or languages in depth if you are appearing for a technical interview at Desai Construction. The most common topics and skills that interviewers at Desai Construction expect are Execution, High Rise Building and Residential.

Tell us how to improve this page.

Desai Construction Project Engineer Salary
based on 27 salaries
₹3 L/yr - ₹7.2 L/yr
At par with the average Project Engineer Salary in India
View more details

Desai Construction Project Engineer Reviews and Ratings

based on 8 reviews

4.2/5

Rating in categories

3.5

Skill development

3.7

Work-life balance

4.3

Salary

4.0

Job security

3.9

Company culture

3.4

Promotions

3.8

Work satisfaction

Explore 8 Reviews and Ratings
Safety Officer
36 salaries
unlock blur

₹2 L/yr - ₹4.5 L/yr

Project Engineer
27 salaries
unlock blur

₹3 L/yr - ₹7.2 L/yr

Senior Engineer
21 salaries
unlock blur

₹4.5 L/yr - ₹12 L/yr

Civil Engineer
16 salaries
unlock blur

₹3 L/yr - ₹7.5 L/yr

Civil Site Engineer
14 salaries
unlock blur

₹2 L/yr - ₹6 L/yr

Explore more salaries
Compare Desai Construction with

Larsen & Toubro Limited

4.0
Compare

Tata Projects

4.2
Compare

Shapoorji Pallonji Group

4.1
Compare

GMR Group

4.1
Compare
Did you find this page helpful?
Yes No
write
Share an Interview