The rating of ELCB and MCCB in a distribution board for power circuits should be based on the load requirements and safety regulations.
ELCB rating should be based on the maximum fault current that can occur in the circuit to ensure proper protection against electrical shocks.
MCCB rating should be selected based on the maximum current that the circuit can handle without tripping.
Consider the type of load connected to th...
The MCB rating for cooker unit in villas and flats should typically be around 32A.
The MCB rating for a cooker unit is usually 32A to handle the load of the cooker.
It is important to consider the power consumption of the cooker and any other appliances connected to the same circuit.
Consulting with an electrician or following local electrical codes can help determine the appropriate MCB rating.
Using a higher MCB rating t...
The rating of ELCB in the swimming pool distribution board for underwater lights and swimming pool lights should be at least 30mA.
The ELCB rating should be at least 30mA to provide protection against electric shock in wet conditions.
This is important for safety in swimming pools where the risk of electric shock is higher.
ELCBs with higher ratings such as 100mA or 300mA may not provide adequate protection in wet environ...
The number of power sockets that can be connected in a 1no ring main circuit in a Distribution board depends on the load capacity and design of the circuit.
The number of power sockets will depend on the load capacity of the circuit.
Consider the power rating of each socket and the total load that the circuit can handle.
Consult electrical regulations and guidelines for maximum allowable load on a ring main circuit.
Factor...
Yes, a shunt trip is required for Smoke Extract Fan Panel.
A shunt trip is required for Smoke Extract Fan Panel to ensure the fan can be shut off remotely in case of emergency.
It is a safety feature that allows for quick deactivation of the fan in case of fire or smoke detection.
Without a shunt trip, there may be delays in shutting off the fan during an emergency situation.
The wire size installed in the Distribution board for lighting circuits is typically 1.5mm² or 2.5mm².
Typically, 1.5mm² or 2.5mm² wire sizes are installed in the Distribution board for lighting circuits.
The wire size is chosen based on the current rating and load requirements of the lighting circuit.
Proper wire sizing is crucial to ensure safety and prevent overheating in the electrical system.
For a load less than 20 kW in a 3 phase Distribution board, a main incomer MCCB of 32A and a cable size of 6mm should be given.
Main incomer MCCB size should be 32A for a load less than 20 kW in a 3 phase Distribution board
Cable size should be 6mm for the Distribution board from the panel
Traffic barrier system can be integrated with Fire Alarm System to provide early warning and evacuation signals in case of fire.
Traffic barrier system can be equipped with fire alarm sensors to detect smoke or fire.
Once fire is detected, the barrier system can automatically open to allow for evacuation of vehicles and people.
The barrier system can also trigger alarms and flashing lights to alert nearby individuals of t...
Yes, galvanised cable tray and cable trunking should be earthed for safety reasons.
Galvanised cable tray and cable trunking should be earthed to prevent electric shock hazards.
Earthing helps in dissipating any fault currents that may occur in the system.
It also helps in protecting the equipment and personnel from potential electrical faults.
Proper earthing ensures the system meets safety standards and regulations.
Examp...
Top trending discussions
Google Sheets is a cloud-based spreadsheet program offered by Google as part of the Google Drive office suite.
Allows users to create and edit spreadsheets online
Offers collaboration features for real-time editing and commenting
Can import and export various file formats, including Microsoft Excel
Offers add-ons and scripts for automation and customization
Accessible from any device with internet connection
MDD & OMC are important parameters for soil compaction and moisture content.
MDD stands for Maximum Dry Density, which is the maximum density that can be achieved for a given soil compaction effort.
OMC stands for Optimum Moisture Content, which is the moisture content at which the maximum dry density can be achieved.
These parameters are important for determining the appropriate moisture content and compaction effort for...
The velocity of steel varies depending on the type and conditions.
The velocity of steel can range from 5000 to 6000 meters per second
The velocity of steel can be affected by factors such as temperature and pressure
The velocity of steel is important in industries such as construction and manufacturing
The cube test result in 7 days depends on the purpose of the test and the specific cube being tested.
The cube test can refer to various tests in different fields such as construction, engineering, and materials science.
For example, in construction, the cube test is used to determine the compressive strength of concrete cubes after 7 days of curing.
The result of the cube test can vary depending on factors such as the ty...
It was just a aptitude test
Managed a team to implement a new customer relationship management system
Led a team of 5 employees to successfully implement a new CRM system
Coordinated with IT department to ensure smooth integration of the system
Provided training to staff on how to use the new system effectively
I want to join the firm because of its strong reputation, opportunities for growth, and alignment with my career goals.
Strong reputation in the industry
Opportunities for career growth and development
Alignment with my career goals and values
I applied via Approached by Company and was interviewed before Apr 2021. There was 1 interview round.
I applied via Referral and was interviewed before May 2021. There were 3 interview rounds.
I received a video call link and in that link will get the accounting basic questions for that we have to answer after a beep.
I applied via Naukri.com and was interviewed in Jan 2021. There were 4 interview rounds.
Yes, I have experience in handling RVNL projects.
I have previously managed a similar railway project
I am familiar with the processes and regulations involved
I have a strong team to support me
I am confident in my ability to deliver the project on time and within budget
posted on 2 May 2021
posted on 1 Jun 2021
I applied via Walk-in and was interviewed in Feb 2021. There were 3 interview rounds.
posted on 28 Sep 2021
I applied via Naukri.com and was interviewed in Mar 2021. There was 1 interview round.
Some of the top questions asked at the Delta Construction Co. W.L.L interview -
based on 1 interview
Interview experience
based on 3 reviews
Rating in categories
Mechanical Engineer
3
salaries
| ₹7.5 L/yr - ₹13.2 L/yr |
Senior Electrical Engineer
3
salaries
| ₹15 L/yr - ₹15 L/yr |
Larsen & Toubro Limited
L&T Construction
Tata Projects
Megha Engineering & Infrastructures