Upload Button Icon Add office photos

Filter interviews by

Delta Construction Co. W.L.L Interview Questions, Process, and Tips

Updated 10 Aug 2023

Delta Construction Co. W.L.L Interview Experiences

1 interview found

Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Company Website and was interviewed before Jun 2022. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - One-on-one 

(15 Questions)

  • Q1. 1.Earthing and Lightning protection meggar values should be what to install these system ?? 2.For Lighting circuit what should be the rating of ELCB and MCCB in the Distribution board ??
  • Ans. 1.Earthing System = less than 1 ohms Lightning Protection System = less than 10 ohms . 2.ELCB 300 mA MCCB 10A .
  • Answered Anonymously
  • Q2. For Power circuit what should be the rating of ELCB and MCCB rating in Distribution board ???
  • Ans. 

    The rating of ELCB and MCCB in a distribution board for power circuits should be based on the load requirements and safety regulations.

    • ELCB rating should be based on the maximum fault current that can occur in the circuit to ensure proper protection against electrical shocks.

    • MCCB rating should be selected based on the maximum current that the circuit can handle without tripping.

    • Consider the type of load connected to th...

  • Answered by AI
  • Q3. For fire Alarm system Control Panel cable should of what type and NO &NC contact required at their panel or not ??
  • Ans. Fire Rated cable 2×2.5 core FP 200 CABLE . Yes No&NC contact are required at the panel end .
  • Answered Anonymously
  • Q4. For cooker unit in villas and flats what should be the MCB rating ??
  • Ans. 

    The MCB rating for cooker unit in villas and flats should typically be around 32A.

    • The MCB rating for a cooker unit is usually 32A to handle the load of the cooker.

    • It is important to consider the power consumption of the cooker and any other appliances connected to the same circuit.

    • Consulting with an electrician or following local electrical codes can help determine the appropriate MCB rating.

    • Using a higher MCB rating t...

  • Answered by AI
  • Q5. For under water lights and swimming pool lights what is the rating of ELCB in the swimming pool distribution board.
  • Ans. 

    The rating of ELCB in the swimming pool distribution board for underwater lights and swimming pool lights should be at least 30mA.

    • The ELCB rating should be at least 30mA to provide protection against electric shock in wet conditions.

    • This is important for safety in swimming pools where the risk of electric shock is higher.

    • ELCBs with higher ratings such as 100mA or 300mA may not provide adequate protection in wet environ...

  • Answered by AI
  • Q6. How many power sockets can be connected in a 1no ring main circuit in a Distribution board ??
  • Ans. 

    The number of power sockets that can be connected in a 1no ring main circuit in a Distribution board depends on the load capacity and design of the circuit.

    • The number of power sockets will depend on the load capacity of the circuit.

    • Consider the power rating of each socket and the total load that the circuit can handle.

    • Consult electrical regulations and guidelines for maximum allowable load on a ring main circuit.

    • Factor...

  • Answered by AI
  • Q7. For SMoke Extract Fan Panel a shunt trip is required or not ??
  • Ans. 

    Yes, a shunt trip is required for Smoke Extract Fan Panel.

    • A shunt trip is required for Smoke Extract Fan Panel to ensure the fan can be shut off remotely in case of emergency.

    • It is a safety feature that allows for quick deactivation of the fan in case of fire or smoke detection.

    • Without a shunt trip, there may be delays in shutting off the fan during an emergency situation.

  • Answered by AI
  • Q8. For lighting circuits what type of wire size is installed in the Distribution board ??
  • Ans. 

    The wire size installed in the Distribution board for lighting circuits is typically 1.5mm² or 2.5mm².

    • Typically, 1.5mm² or 2.5mm² wire sizes are installed in the Distribution board for lighting circuits.

    • The wire size is chosen based on the current rating and load requirements of the lighting circuit.

    • Proper wire sizing is crucial to ensure safety and prevent overheating in the electrical system.

  • Answered by AI
  • Q9. For power circuits,split AC unit ,cooker unit what wire size and type of cable is installed in Distribution board ??
  • Ans. Power circuits wire size is single core 4. sq.mm wire For Split Ac units wire size is single core 6. sq.mm wire For cooker unit wire size is single core 10.sq.mm wire
  • Answered Anonymously
  • Q10. For a load less than 20 kw in a 3 phase Distribution board what size of main incomer MCCB and what size of cable should be given to the Distribution board from the panel ??
  • Ans. 

    For a load less than 20 kW in a 3 phase Distribution board, a main incomer MCCB of 32A and a cable size of 6mm should be given.

    • Main incomer MCCB size should be 32A for a load less than 20 kW in a 3 phase Distribution board

    • Cable size should be 6mm for the Distribution board from the panel

  • Answered by AI
  • Q11. Main incomer MccB =63 Amperes Cabe Size will be = 4 core XLPE Copper cable
  • Q12. Traffic barrierr system required Fire Alrm System signal and how ??
  • Ans. 

    Traffic barrier system can be integrated with Fire Alarm System to provide early warning and evacuation signals in case of fire.

    • Traffic barrier system can be equipped with fire alarm sensors to detect smoke or fire.

    • Once fire is detected, the barrier system can automatically open to allow for evacuation of vehicles and people.

    • The barrier system can also trigger alarms and flashing lights to alert nearby individuals of t...

  • Answered by AI
  • Q13. Yes Traffic barrier system control panel required Fire Alarm system signal in the event of fire ,the traffic barrier should be open .its is connected through input/output module (I/O module)
  • Q14. Galvanised Cable tray and Cable trunking required earthing ??
  • Ans. 

    Yes, galvanised cable tray and cable trunking should be earthed for safety reasons.

    • Galvanised cable tray and cable trunking should be earthed to prevent electric shock hazards.

    • Earthing helps in dissipating any fault currents that may occur in the system.

    • It also helps in protecting the equipment and personnel from potential electrical faults.

    • Proper earthing ensures the system meets safety standards and regulations.

    • Examp...

  • Answered by AI
  • Q15. Yes G.I cable tray and G.I cable trunking reuires Earthing with single core 6 sq.mm cable Green /Yellow cable with loops to be connected to the joints of cable tray and trunking and end has to connected t...
Round 3 - HR 

(2 Questions)

  • Q1. Why you want to change the job
  • Q2. I want to work abroad .it worth challenge .I love challenges and wanted to grow in my professional carrier .

Interview Preparation Tips

Topics to prepare for Delta Construction Co. W.L.L Electrical Project Engineer interview:
  • Main construction and execution
  • Paper work
Interview preparation tips for other job seekers - Be confident .have self respect.love challenges in life which will enable us to grow .

Top Delta Construction Co. W.L.L Electrical Project Engineer Interview Questions and Answers

Q1. For a load less than 20 kw in a 3 phase Distribution board what size of main incomer MCCB and what size of cable should be given to the Distribution board from the panel ??
View answer (3)

Electrical Project Engineer Interview Questions asked at other Companies

Q1. What is important factors in cable calculation? Types of communication used in Automation industry & its length limitations, What is difference between Analog input 4-20mA & analog input (0-10v). Dg synch control panel & it's wo... read more
View answer (1)

Interview questions from similar companies

Interview experience
3
Average
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected
Round 1 - Technical 

(5 Questions)

  • Q1. What are the standards for scaffolding codes?
  • Q2. What are the different types of scaffolding erection?
  • Q3. What type of use material for safety purchase
  • Q4. How to safe Erection
  • Q5. Identify risk and hazard

Interview Preparation Tips

Interview preparation tips for other job seekers - We are erecting scaffolding according to the company's standards.
Interview experience
5
Excellent
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Selected Selected

I was interviewed in Dec 2024.

Round 1 - Technical 

(4 Questions)

  • Q1. The Electrical technician job description entails participating in independent maintenance related training activities organized by the field operations teams and coordinating shutdowns to ensure that ...
  • Q2. Commercial and Industrial Electrical Maintenance is the process of regularly inspecting, testing, cleaning, and repairing electrical systems and components to ensure they are safe and functioning Prope...
  • Q3. The technician’s role also includes participating in planning, ensuring effective spare parts management, and supervising continuous project improvement.
  • Q4. Electrical technicians perform various functions, depending on the particular operations of the company or organization they work with. However, their role is majorly to ensure effective repairs and mainte...

Interview Preparation Tips

Interview preparation tips for other job seekers - Electrical safety
Power suppliers
Electrical troubleshooting
PLC Electrical control panel
Interview experience
3
Average
Difficulty level
Hard
Process Duration
Less than 2 weeks
Result
Selected Selected

I was interviewed in Dec 2024.

Round 1 - Technical 

(2 Questions)

  • Q1. Can you describe your experience during the interview?
  • Q2. On job profile based
Round 2 - HR 

(3 Questions)

  • Q1. What was your experience with the work culture in your previous job?
  • Q2. Can you describe your previous experience?
  • Q3. Are you interested in relocating for this position?

Interview Preparation Tips

Interview preparation tips for other job seekers - Be confident in your job profile and share your role and responsibilities. How would you describe your performance and ability to handle pressure?
Interview experience
5
Excellent
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via AmbitionBox and was interviewed in Nov 2024. There were 4 interview rounds.

Round 1 - Technical 

(2 Questions)

  • Q1. Proper system in working candidates.
  • Q2. Management in supported in department
  • Ans. 

    Management is fully supported in the department, providing resources and guidance to ensure success.

    • Management provides clear goals and expectations for the team

    • Regular check-ins and feedback sessions are conducted to support employee growth

    • Resources such as training programs and tools are readily available for employees

    • Management encourages open communication and collaboration among team members

  • Answered by AI
Round 2 - HR 

(2 Questions)

  • Q1. Payment terms and condition
  • Q2. How many facilities in company provide
Round 3 - Technical 

(2 Questions)

  • Q1. My working in good culture company.
  • Q2. I achieve from zero goal in my target
Round 4 - Technical 

(2 Questions)

  • Q1. Good man for handing
  • Q2. My working in plant maintenance manager work

Interview Preparation Tips

Topics to prepare for Larsen & Toubro Limited Maintenance Manager interview:
  • Dyes
  • TS 16949
Interview preparation tips for other job seekers - My knowledge for conventional machines CNC machine ,PLC machines, robot with, automation machines, maintenance breakdown, documentations, good manpower handling, pm schedule 52 week. Management support team work development and design support knowledge.
Interview experience
5
Excellent
Difficulty level
Easy
Process Duration
-
Result
Selected Selected
Round 1 - One-on-one 

(5 Questions)

  • Q1. My Experience is good and best Experience this this my problem is company dropuot , My interview this HR.and CEO. BM .and Accounted this all company best Experience members this me interview show That is ...
  • Q2. Company manufacturing work this BHEL part and CGL part working this manufacturing company
  • Q3. What is skill? Ans:- MS word ms excel and telly knowledge all store keepers knowledge
  • Q4. What this professional and personal? Ans:-I am work times professional and that is work out time personal
  • Q5. What did you house? Working side areas areng
  • Ans. 

    I managed inventory of various items in the store, including working side areas.

    • Managed inventory of products and supplies

    • Organized and maintained stock levels

    • Handled incoming and outgoing shipments

    • Ensured proper storage and labeling of items

    • Performed regular inventory checks and audits

  • Answered by AI
Interview experience
5
Excellent
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Approached by Company and was interviewed in Nov 2024. There was 1 interview round.

Round 1 - Technical 

(5 Questions)

  • Q1. Transmission Tower Detailing
  • Q2. Shop Drawing Bil of Meterial Tower Devlop & Re Devlop
  • Q3. Raice Chimney Drawing
  • Q4. Stub Template Prop Drawing
  • Q5. Structural Develop and Redevelop, Marking Erection Drawing , Bolts Nuts Grip Checking and Counting, Bill of Material , Shop Drawing Cad & Dxf and Shop Drawing Checking , Prop Drawing, Raise Chimney Transm...

Interview Preparation Tips

Interview preparation tips for other job seekers - Transmission Tower Detailing Shop Drawing Bill Of Meterial Tower Devlop & Re Devlop, RC, Prop
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-

I applied via Campus Placement

Round 1 - Aptitude Test 

It was a technicaL + aptitude test with 60 minutes duration.

Round 2 - Technical 

(2 Questions)

  • Q1. Basic questions regarding the projects that i have done.
  • Q2. They asked me about my favourite subjects and then they asked some basic questions regarding those subjects.
Round 3 - HR 

(1 Question)

  • Q1. HR round in TCE is not an interview round rather it is a video assessment wherein we were given with two HR questions and we have to record a video answering the questions. maximum duration of the video sh...

Interview Preparation Tips

Interview preparation tips for other job seekers - Revise the core subjects of your field as it will help you during your technical test or interview as well. Feel confident while answering the question during Technical/HR interview.

Employee Interview Questions & Answers

Tata Technologies user image Vijay duniya Duniya

posted on 19 Dec 2024

Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
No response

I applied via Company Website and was interviewed in Nov 2024. There were 5 interview rounds.

Round 1 - Aptitude Test 

Behaviour and believe to inform decisions

Round 2 - Case Study 

Details account information and development of the person

Round 3 - Coding Test 

Slove tha coding problem

Round 4 - Group Discussion 

Further details and self information sharing and openly speaking skills test

Round 5 - One-on-one 

(5 Questions)

  • Q1. Interview questions
  • Q2. Self information
  • Q3. Behaviour to the person and turned
  • Q4. Qualification and believe
  • Q5. Safety skills and pasting maind set

Interview Preparation Tips

Topics to prepare for Tata Technologies Employee interview:
  • CNC Machines
  • Machine Operating
Interview preparation tips for other job seekers - Don't panic and be strong
Interview experience
4
Good
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Referral and was interviewed in Dec 2024. There were 3 interview rounds.

Round 1 - HR 

(2 Questions)

  • Q1. After 5 years company groth abd other any fild is work.
  • Q2. Who many currently working is company.
  • Ans. 

    The company currently has 150 employees working.

    • The company has a total of 150 employees currently working.

    • The number of employees may vary due to hiring or resignations.

    • It is important to keep track of the current employee count for reporting purposes.

  • Answered by AI
Round 2 - HR 

(2 Questions)

  • Q1. After 5 year company is groth and any other field is working.
  • Q2. How many country is working project.
  • Ans. 

    The project is working in multiple countries.

    • The project is currently active in 10 countries.

    • Each country has its own team of workers.

    • The project requires coordination between different countries for smooth operation.

  • Answered by AI
Round 3 - One-on-one 

(2 Questions)

  • Q1. Documents controller recording question
  • Q2. Controller accounts related to question

Interview Preparation Tips

Interview preparation tips for other job seekers - My job location currently my destination is very long

Delta Construction Co. W.L.L Interview FAQs

How many rounds are there in Delta Construction Co. W.L.L interview?
Delta Construction Co. W.L.L interview process usually has 3 rounds. The most common rounds in the Delta Construction Co. W.L.L interview process are Resume Shortlist, One-on-one Round and HR.
What are the top questions asked in Delta Construction Co. W.L.L interview?

Some of the top questions asked at the Delta Construction Co. W.L.L interview -

  1. For a load less than 20 kw in a 3 phase Distribution board what size of main i...read more
  2. For under water lights and swimming pool lights what is the rating of ELCB in t...read more
  3. For lighting circuits what type of wire size is installed in the Distribution b...read more

Tell us how to improve this page.

Interview Questions from Similar Companies

L&T Construction Interview Questions
4.0
 • 703 Interviews
Tata Projects Interview Questions
4.2
 • 406 Interviews
KEC International Interview Questions
4.1
 • 287 Interviews
Tata Technologies Interview Questions
3.6
 • 252 Interviews
TCE Interview Questions
3.8
 • 242 Interviews
View all

Delta Construction Co. W.L.L Reviews and Ratings

based on 3 reviews

5.0/5

Rating in categories

4.9

Skill development

4.9

Work-life balance

4.9

Salary

4.9

Job security

4.0

Company culture

4.9

Promotions

4.9

Work satisfaction

Explore 3 Reviews and Ratings
Mechanical Engineer
3 salaries
unlock blur

₹7.5 L/yr - ₹13.2 L/yr

Senior Electrical Engineer
3 salaries
unlock blur

₹15 L/yr - ₹15 L/yr

Explore more salaries
Compare Delta Construction Co. W.L.L with

Larsen & Toubro Limited

4.0
Compare

L&T Construction

4.0
Compare

Tata Projects

4.2
Compare

Megha Engineering & Infrastructures

3.9
Compare
Did you find this page helpful?
Yes No
write
Share an Interview