Upload Button Icon Add office photos

Filter interviews by

Delta Construction Co. W.L.L Interview Questions, Process, and Tips

Updated 10 Aug 2023

Delta Construction Co. W.L.L Interview Experiences

1 interview found

Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Company Website and was interviewed before Jun 2022. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - One-on-one 

(15 Questions)

  • Q1. 1.Earthing and Lightning protection meggar values should be what to install these system ?? 2.For Lighting circuit what should be the rating of ELCB and MCCB in the Distribution board ??
  • Ans. 1.Earthing System = less than 1 ohms Lightning Protection System = less than 10 ohms . 2.ELCB 300 mA MCCB 10A .
  • Answered Anonymously
  • Q2. For Power circuit what should be the rating of ELCB and MCCB rating in Distribution board ???
  • Ans. 

    The rating of ELCB and MCCB in a distribution board for power circuits should be based on the load requirements and safety regulations.

    • ELCB rating should be based on the maximum fault current that can occur in the circuit to ensure proper protection against electrical shocks.

    • MCCB rating should be selected based on the maximum current that the circuit can handle without tripping.

    • Consider the type of load connected to th...

  • Answered by AI
  • Q3. For fire Alarm system Control Panel cable should of what type and NO &NC contact required at their panel or not ??
  • Ans. Fire Rated cable 2×2.5 core FP 200 CABLE . Yes No&NC contact are required at the panel end .
  • Answered Anonymously
  • Q4. For cooker unit in villas and flats what should be the MCB rating ??
  • Ans. 

    The MCB rating for cooker unit in villas and flats should typically be around 32A.

    • The MCB rating for a cooker unit is usually 32A to handle the load of the cooker.

    • It is important to consider the power consumption of the cooker and any other appliances connected to the same circuit.

    • Consulting with an electrician or following local electrical codes can help determine the appropriate MCB rating.

    • Using a higher MCB rating t...

  • Answered by AI
  • Q5. For under water lights and swimming pool lights what is the rating of ELCB in the swimming pool distribution board.
  • Ans. 

    The rating of ELCB in the swimming pool distribution board for underwater lights and swimming pool lights should be at least 30mA.

    • The ELCB rating should be at least 30mA to provide protection against electric shock in wet conditions.

    • This is important for safety in swimming pools where the risk of electric shock is higher.

    • ELCBs with higher ratings such as 100mA or 300mA may not provide adequate protection in wet environ...

  • Answered by AI
  • Q6. How many power sockets can be connected in a 1no ring main circuit in a Distribution board ??
  • Ans. 

    The number of power sockets that can be connected in a 1no ring main circuit in a Distribution board depends on the load capacity and design of the circuit.

    • The number of power sockets will depend on the load capacity of the circuit.

    • Consider the power rating of each socket and the total load that the circuit can handle.

    • Consult electrical regulations and guidelines for maximum allowable load on a ring main circuit.

    • Factor...

  • Answered by AI
  • Q7. For SMoke Extract Fan Panel a shunt trip is required or not ??
  • Ans. 

    Yes, a shunt trip is required for Smoke Extract Fan Panel.

    • A shunt trip is required for Smoke Extract Fan Panel to ensure the fan can be shut off remotely in case of emergency.

    • It is a safety feature that allows for quick deactivation of the fan in case of fire or smoke detection.

    • Without a shunt trip, there may be delays in shutting off the fan during an emergency situation.

  • Answered by AI
  • Q8. For lighting circuits what type of wire size is installed in the Distribution board ??
  • Ans. 

    The wire size installed in the Distribution board for lighting circuits is typically 1.5mm² or 2.5mm².

    • Typically, 1.5mm² or 2.5mm² wire sizes are installed in the Distribution board for lighting circuits.

    • The wire size is chosen based on the current rating and load requirements of the lighting circuit.

    • Proper wire sizing is crucial to ensure safety and prevent overheating in the electrical system.

  • Answered by AI
  • Q9. For power circuits,split AC unit ,cooker unit what wire size and type of cable is installed in Distribution board ??
  • Ans. Power circuits wire size is single core 4. sq.mm wire For Split Ac units wire size is single core 6. sq.mm wire For cooker unit wire size is single core 10.sq.mm wire
  • Answered Anonymously
  • Q10. For a load less than 20 kw in a 3 phase Distribution board what size of main incomer MCCB and what size of cable should be given to the Distribution board from the panel ??
  • Ans. 

    For a load less than 20 kW in a 3 phase Distribution board, a main incomer MCCB of 32A and a cable size of 6mm should be given.

    • Main incomer MCCB size should be 32A for a load less than 20 kW in a 3 phase Distribution board

    • Cable size should be 6mm for the Distribution board from the panel

  • Answered by AI
  • Q11. Main incomer MccB =63 Amperes Cabe Size will be = 4 core XLPE Copper cable
  • Q12. Traffic barrierr system required Fire Alrm System signal and how ??
  • Ans. 

    Traffic barrier system can be integrated with Fire Alarm System to provide early warning and evacuation signals in case of fire.

    • Traffic barrier system can be equipped with fire alarm sensors to detect smoke or fire.

    • Once fire is detected, the barrier system can automatically open to allow for evacuation of vehicles and people.

    • The barrier system can also trigger alarms and flashing lights to alert nearby individuals of t...

  • Answered by AI
  • Q13. Yes Traffic barrier system control panel required Fire Alarm system signal in the event of fire ,the traffic barrier should be open .its is connected through input/output module (I/O module)
  • Q14. Galvanised Cable tray and Cable trunking required earthing ??
  • Ans. 

    Yes, galvanised cable tray and cable trunking should be earthed for safety reasons.

    • Galvanised cable tray and cable trunking should be earthed to prevent electric shock hazards.

    • Earthing helps in dissipating any fault currents that may occur in the system.

    • It also helps in protecting the equipment and personnel from potential electrical faults.

    • Proper earthing ensures the system meets safety standards and regulations.

    • Examp...

  • Answered by AI
  • Q15. Yes G.I cable tray and G.I cable trunking reuires Earthing with single core 6 sq.mm cable Green /Yellow cable with loops to be connected to the joints of cable tray and trunking and end has to connected t...
Round 3 - HR 

(2 Questions)

  • Q1. Why you want to change the job
  • Q2. I want to work abroad .it worth challenge .I love challenges and wanted to grow in my professional carrier .

Interview Preparation Tips

Topics to prepare for Delta Construction Co. W.L.L Electrical Project Engineer interview:
  • Main construction and execution
  • Paper work
Interview preparation tips for other job seekers - Be confident .have self respect.love challenges in life which will enable us to grow .

Top Delta Construction Co. W.L.L Electrical Project Engineer Interview Questions and Answers

Q1. For a load less than 20 kw in a 3 phase Distribution board what size of main incomer MCCB and what size of cable should be given to the Distribution board from the panel ??
View answer (3)

Electrical Project Engineer Interview Questions asked at other Companies

Q1. What is important factors in cable calculation? Types of communication used in Automation industry & its length limitations, What is difference between Analog input 4-20mA & analog input (0-10v). Dg synch control panel & it's wo... read more
View answer (1)

Interview questions from similar companies

Interview Questionnaire 

4 Questions

  • Q1. What is Google sheets
  • Ans. 

    Google Sheets is a cloud-based spreadsheet program offered by Google as part of the Google Drive office suite.

    • Allows users to create and edit spreadsheets online

    • Offers collaboration features for real-time editing and commenting

    • Can import and export various file formats, including Microsoft Excel

    • Offers add-ons and scripts for automation and customization

    • Accessible from any device with internet connection

  • Answered by AI
  • Q2. What is the MDD & OMC of soil
  • Ans. 

    MDD & OMC are important parameters for soil compaction and moisture content.

    • MDD stands for Maximum Dry Density, which is the maximum density that can be achieved for a given soil compaction effort.

    • OMC stands for Optimum Moisture Content, which is the moisture content at which the maximum dry density can be achieved.

    • These parameters are important for determining the appropriate moisture content and compaction effort for...

  • Answered by AI
  • Q3. What is the velocity of steel
  • Ans. 

    The velocity of steel varies depending on the type and conditions.

    • The velocity of steel can range from 5000 to 6000 meters per second

    • The velocity of steel can be affected by factors such as temperature and pressure

    • The velocity of steel is important in industries such as construction and manufacturing

  • Answered by AI
  • Q4. What is the cube test result in 7 days
  • Ans. 

    The cube test result in 7 days depends on the purpose of the test and the specific cube being tested.

    • The cube test can refer to various tests in different fields such as construction, engineering, and materials science.

    • For example, in construction, the cube test is used to determine the compressive strength of concrete cubes after 7 days of curing.

    • The result of the cube test can vary depending on factors such as the ty...

  • Answered by AI

Skills evaluated in this interview

Interview experience
4
Good
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Aptitude Test 

It was just a aptitude test

Round 2 - Technical 

(2 Questions)

  • Q1. Basic regarding professional area
  • Q2. Project worked at and experienced
  • Ans. 

    Managed a team to implement a new customer relationship management system

    • Led a team of 5 employees to successfully implement a new CRM system

    • Coordinated with IT department to ensure smooth integration of the system

    • Provided training to staff on how to use the new system effectively

  • Answered by AI
Round 3 - HR 

(2 Questions)

  • Q1. Why i want to join the firm
  • Ans. 

    I want to join the firm because of its strong reputation, opportunities for growth, and alignment with my career goals.

    • Strong reputation in the industry

    • Opportunities for career growth and development

    • Alignment with my career goals and values

  • Answered by AI
  • Q2. Salary discussions

I applied via Approached by Company and was interviewed before Apr 2021. There was 1 interview round.

Round 1 - One-on-one 

(2 Questions)

  • Q1. Equipment layout details
  • Q2. Plot plan details and man and material movement path

Interview Preparation Tips

Interview preparation tips for other job seekers - Good knowledge on piping system, thickness calculations and materials are required

Equipment layout preparation as per oisd 118 and plot plan knowledge required.

I applied via Referral and was interviewed before May 2021. There were 3 interview rounds.

Round 1 - Aptitude Test 

I received a video call link and in that link will get the accounting basic questions for that we have to answer after a beep.

Round 2 - Technical 

(1 Question)

  • Q1. It was all basic accounting question.mostly related to 12th standard c v raman book Friendly interviewers
Round 3 - HR 

(1 Question)

  • Q1. 5 min telephonic call with recruiter

Interview Preparation Tips

Interview preparation tips for other job seekers - Get yourself prepared with basic accounting questions and be confident

I applied via Naukri.com and was interviewed in Jan 2021. There were 4 interview rounds.

Interview Questionnaire 

1 Question

  • Q1. Previous Project experience. Execution plan, Job responsibility, Technical for Electrical SLD, Chiller SLD, Functional test for all MEP items.

Interview Preparation Tips

Interview preparation tips for other job seekers - Try to give correct answer, What you have mentioned in your CV the same question will be raise from Technical Board...

Interview Questionnaire 

3 Questions

  • Q1. Tell me about your experience and ur self like education etc
  • Q2. What do you work in your profile.
  • Q3. Can you handle RVNL project
  • Ans. 

    Yes, I have experience in handling RVNL projects.

    • I have previously managed a similar railway project

    • I am familiar with the processes and regulations involved

    • I have a strong team to support me

    • I am confident in my ability to deliver the project on time and within budget

  • Answered by AI

Interview Questionnaire 

1 Question

  • Q1. If your Experience person , mostly they ask your past experience work related question , If Fresher they ask theoretical question

I applied via Walk-in and was interviewed in Feb 2021. There were 3 interview rounds.

Interview Questionnaire 

2 Questions

  • Q1. Salary discussion and some professional questions.
  • Q2. Technical realated your stream

Interview Preparation Tips

Interview preparation tips for other job seekers - L&T is good organization for learning and self growth purpose.good employee welfare.

I applied via Naukri.com and was interviewed in Mar 2021. There was 1 interview round.

Interview Questionnaire 

1 Question

  • Q1. Questions from Java Spring framework, Hibernate, SQL were asked and apart from that Three programming questions were asked which was based on Data structure, String and Collections

Interview Preparation Tips

Interview preparation tips for other job seekers - Be strong in Core Java, Collection, String most of the questions were asked from these topics

Delta Construction Co. W.L.L Interview FAQs

How many rounds are there in Delta Construction Co. W.L.L interview?
Delta Construction Co. W.L.L interview process usually has 3 rounds. The most common rounds in the Delta Construction Co. W.L.L interview process are Resume Shortlist, One-on-one Round and HR.
What are the top questions asked in Delta Construction Co. W.L.L interview?

Some of the top questions asked at the Delta Construction Co. W.L.L interview -

  1. For a load less than 20 kw in a 3 phase Distribution board what size of main i...read more
  2. For under water lights and swimming pool lights what is the rating of ELCB in t...read more
  3. For lighting circuits what type of wire size is installed in the Distribution b...read more

Tell us how to improve this page.

Delta Construction Co. W.L.L Interview Process

based on 1 interview

Interview experience

4
  
Good
View more

Interview Questions from Similar Companies

L&T Construction Interview Questions
4.0
 • 758 Interviews
Tata Projects Interview Questions
4.2
 • 453 Interviews
KEC International Interview Questions
4.0
 • 314 Interviews
Tata Technologies Interview Questions
3.6
 • 263 Interviews
TCE Interview Questions
3.8
 • 251 Interviews
View all

Delta Construction Co. W.L.L Reviews and Ratings

based on 3 reviews

5.0/5

Rating in categories

4.9

Skill development

4.9

Work-life balance

4.9

Salary

4.9

Job security

4.0

Company culture

4.9

Promotions

4.9

Work satisfaction

Explore 3 Reviews and Ratings
Compare Delta Construction Co. W.L.L with

Larsen & Toubro Limited

3.9
Compare

L&T Construction

4.0
Compare

Tata Projects

4.2
Compare

Megha Engineering & Infrastructures

3.9
Compare
Did you find this page helpful?
Yes No
write
Share an Interview