The rating of ELCB and MCCB in a distribution board for power circuits should be based on the load requirements and safety regulations.
ELCB rating should be based on the maximum fault current that can occur in the circuit to ensure proper protection against electrical shocks.
MCCB rating should be selected based on the maximum current that the circuit can handle without tripping.
Consider the type of load connected to th...
The MCB rating for cooker unit in villas and flats should typically be around 32A.
The MCB rating for a cooker unit is usually 32A to handle the load of the cooker.
It is important to consider the power consumption of the cooker and any other appliances connected to the same circuit.
Consulting with an electrician or following local electrical codes can help determine the appropriate MCB rating.
Using a higher MCB rating t...
The rating of ELCB in the swimming pool distribution board for underwater lights and swimming pool lights should be at least 30mA.
The ELCB rating should be at least 30mA to provide protection against electric shock in wet conditions.
This is important for safety in swimming pools where the risk of electric shock is higher.
ELCBs with higher ratings such as 100mA or 300mA may not provide adequate protection in wet environ...
The number of power sockets that can be connected in a 1no ring main circuit in a Distribution board depends on the load capacity and design of the circuit.
The number of power sockets will depend on the load capacity of the circuit.
Consider the power rating of each socket and the total load that the circuit can handle.
Consult electrical regulations and guidelines for maximum allowable load on a ring main circuit.
Factor...
Yes, a shunt trip is required for Smoke Extract Fan Panel.
A shunt trip is required for Smoke Extract Fan Panel to ensure the fan can be shut off remotely in case of emergency.
It is a safety feature that allows for quick deactivation of the fan in case of fire or smoke detection.
Without a shunt trip, there may be delays in shutting off the fan during an emergency situation.
The wire size installed in the Distribution board for lighting circuits is typically 1.5mm² or 2.5mm².
Typically, 1.5mm² or 2.5mm² wire sizes are installed in the Distribution board for lighting circuits.
The wire size is chosen based on the current rating and load requirements of the lighting circuit.
Proper wire sizing is crucial to ensure safety and prevent overheating in the electrical system.
For a load less than 20 kW in a 3 phase Distribution board, a main incomer MCCB of 32A and a cable size of 6mm should be given.
Main incomer MCCB size should be 32A for a load less than 20 kW in a 3 phase Distribution board
Cable size should be 6mm for the Distribution board from the panel
Traffic barrier system can be integrated with Fire Alarm System to provide early warning and evacuation signals in case of fire.
Traffic barrier system can be equipped with fire alarm sensors to detect smoke or fire.
Once fire is detected, the barrier system can automatically open to allow for evacuation of vehicles and people.
The barrier system can also trigger alarms and flashing lights to alert nearby individuals of t...
Yes, galvanised cable tray and cable trunking should be earthed for safety reasons.
Galvanised cable tray and cable trunking should be earthed to prevent electric shock hazards.
Earthing helps in dissipating any fault currents that may occur in the system.
It also helps in protecting the equipment and personnel from potential electrical faults.
Proper earthing ensures the system meets safety standards and regulations.
Examp...
Top trending discussions
posted on 24 Jan 2025
posted on 25 Jan 2025
I was interviewed in Dec 2024.
posted on 25 Jan 2025
I was interviewed in Dec 2024.
posted on 1 Dec 2024
I applied via AmbitionBox and was interviewed in Nov 2024. There were 4 interview rounds.
Management is fully supported in the department, providing resources and guidance to ensure success.
Management provides clear goals and expectations for the team
Regular check-ins and feedback sessions are conducted to support employee growth
Resources such as training programs and tools are readily available for employees
Management encourages open communication and collaboration among team members
posted on 21 Dec 2024
I managed inventory of various items in the store, including working side areas.
Managed inventory of products and supplies
Organized and maintained stock levels
Handled incoming and outgoing shipments
Ensured proper storage and labeling of items
Performed regular inventory checks and audits
posted on 28 Nov 2024
I applied via Approached by Company and was interviewed in Nov 2024. There was 1 interview round.
I applied via Campus Placement
It was a technicaL + aptitude test with 60 minutes duration.
I applied via Company Website and was interviewed in Nov 2024. There were 5 interview rounds.
Behaviour and believe to inform decisions
Details account information and development of the person
Slove tha coding problem
Further details and self information sharing and openly speaking skills test
posted on 1 Jan 2025
I applied via Referral and was interviewed in Dec 2024. There were 3 interview rounds.
The company currently has 150 employees working.
The company has a total of 150 employees currently working.
The number of employees may vary due to hiring or resignations.
It is important to keep track of the current employee count for reporting purposes.
The project is working in multiple countries.
The project is currently active in 10 countries.
Each country has its own team of workers.
The project requires coordination between different countries for smooth operation.
based on 3 reviews
Rating in categories
Mechanical Engineer
3
salaries
| ₹7.5 L/yr - ₹13.2 L/yr |
Senior Electrical Engineer
3
salaries
| ₹15 L/yr - ₹15 L/yr |
Larsen & Toubro Limited
L&T Construction
Tata Projects
Megha Engineering & Infrastructures