Filter interviews by
Custom Settings and Custom Metadata are both used to store custom data, but have different use cases.
Custom Settings are hierarchical and can be used to store data that needs to be accessed frequently, such as organization-wide settings.
Custom Metadata is not hierarchical and can be used to store data that needs to be deployed across multiple orgs, such as picklist values.
Custom Settings can be accessed using Apex, Vis...
Flexipage is a type of Lightning page that allows for greater customization and flexibility.
Flexipage is a type of Lightning page that allows for greater customization and flexibility.
Flexipage can be used to create custom record pages, app pages, and home pages.
Lightning pages are a type of page in the Lightning Experience UI.
Lightning pages can be created using the Lightning App Builder.
Flexipage is a more advanced a
Batch Apex is used for large data volume processing while Queueable Apex is used for smaller data volume processing.
Batch Apex is used for processing large data volumes in smaller chunks.
Queueable Apex is used for smaller data volumes and can be chained together for complex processing.
Batch Apex is asynchronous and can be scheduled to run at a specific time.
Queueable Apex is also asynchronous but can be executed immedi...
Duplicate records can be deleted using various methods.
Use Salesforce's built-in Duplicate Management feature
Create a custom Apex trigger to identify and delete duplicates
Use a third-party app like DupeCatcher or DemandTools
Manually identify and delete duplicates using reports or list views
I appeared for an interview before Mar 2024, where I was asked the following questions.
Material issues in plumbing projects can lead to delays, increased costs, and safety hazards if not managed properly.
Supply chain delays: For example, a shortage of PVC pipes can halt project progress.
Quality control issues: Using substandard materials can lead to leaks and system failures.
Incorrect material specifications: Installing the wrong type of fittings can cause compatibility issues.
Environmental factors: Corr...
Effective internal coordination with civil teams and vendors ensures timely project progress and quality outcomes.
Establish regular meetings with the civil team to discuss project timelines and milestones.
Utilize project management software to track progress and share updates with all stakeholders.
Create a clear communication channel for immediate issue resolution, such as a dedicated chat group.
Example: During a recen...
Top trending discussions
I applied via Walk-in and was interviewed before Dec 2020. There were 5 interview rounds.
The neutral axis is the line where the stress is zero in a reinforced concrete structure.
The neutral axis divides the cross-section of the structure into two parts: the compression zone and the tension zone.
The depth of the neutral axis depends on the moment of resistance of the section and the bending moment applied.
The position of the neutral axis affects the amount of reinforcement required in the tension zone.
The n...
A firewall is a network security system that monitors and controls incoming and outgoing network traffic based on predetermined security rules.
Acts as a barrier between a trusted internal network and untrusted external network
Filters network traffic based on rules set by the administrator
Can be hardware-based or software-based
Examples include Cisco ASA, Palo Alto Networks, and Windows Firewall
I applied via Campus Placement and was interviewed in Nov 2023. There were 2 interview rounds.
I appeared for an interview in Mar 2023, where I was asked the following questions.
When workload is low, I focus on proactive improvements, team development, and strategic planning to enhance overall productivity.
Conduct a skills assessment of the team to identify areas for development, such as offering training sessions on new software.
Engage in strategic planning by reviewing current projects and identifying potential future opportunities or improvements.
Encourage team collaboration by organizing b...
System implementation process involves planning, designing, testing, and deploying new software or hardware systems.
Planning phase involves defining project scope, setting goals, and creating a timeline.
Design phase includes creating system architecture, database design, and user interface.
Testing phase involves conducting various tests to ensure system functionality and performance.
Deployment phase includes installing...
Monitoring performance involves setting clear expectations, providing feedback, tracking progress, and addressing any issues that arise.
Set clear performance expectations for team members
Provide regular feedback on performance
Track progress towards goals and objectives
Address any performance issues promptly and constructively
I applied via Monster and was interviewed before Apr 2023. There were 3 interview rounds.
Question are hard in panel
I am currently earning a salary of $60,000 per year.
My current annual salary is $60,000
I am earning $5,000 per month
My total compensation package is $60,000
The company name is XYZ Corporation, a leading data analytics firm specializing in providing insights for businesses.
XYZ Corporation is a data analytics firm
Specializes in providing insights for businesses
It is very good in study for
Further studies.
I applied via Walk-in and was interviewed in Jul 2021. There were 3 interview rounds.
posted on 22 Apr 2022
I applied via Approached by Company
Sale experience 4 years
based on 2 interviews
Interview experience
based on 42 reviews
Rating in categories
Assistant General Manager
10
salaries
| ₹21 L/yr - ₹35 L/yr |
Site Engineer
8
salaries
| ₹4.5 L/yr - ₹6 L/yr |
Executive Accountant
7
salaries
| ₹2.8 L/yr - ₹4 L/yr |
General Manager Project
6
salaries
| ₹24 L/yr - ₹42 L/yr |
Manager
6
salaries
| ₹10.5 L/yr - ₹12.4 L/yr |
GAMMON INDIA
McNally Bharat Engineering
SPML Infra
Techno Electric & Engineering Company