Filter interviews by
Line balancing is the process of assigning tasks to workstations in a way that evens out the workload and maximizes efficiency.
Involves distributing work evenly among workstations
Minimizes idle time and bottlenecks
Helps improve productivity and reduce production costs
Example: In an assembly line, tasks like welding, painting, and assembly are balanced to ensure smooth flow
Types of muda in production engineering include overproduction, waiting, transportation, processing, inventory, motion, and defects.
Overproduction: Producing more than needed, leading to waste of resources.
Waiting: Delays in production due to inefficient processes or lack of coordination.
Transportation: Unnecessary movement of materials or products, increasing lead time.
Processing: Unnecessary steps or complex processe...
I applied via Naukri.com and was interviewed in Aug 2023. There were 2 interview rounds.
AC works by transferring heat from inside a building to outside, using a refrigeration cycle.
AC units contain a refrigerant that absorbs heat from indoor air and releases it outside.
The refrigerant evaporates at low pressure and temperature, absorbing heat in the process.
The refrigerant is then compressed, raising its temperature and pressure, before releasing the heat outside.
The cycle continues to maintain a comforta...
The gases in an AC unit typically include refrigerant gases such as R-410A or R-22.
Refrigerant gases are used in AC units to absorb and release heat in order to cool the air.
Common refrigerant gases used in AC units include R-410A (Puron) and R-22 (Freon).
These gases circulate through the AC system in a continuous cycle to facilitate the cooling process.
The indoor unit and outdoor unit coils are typically made of metals such as copper, aluminum, or a combination of both.
Common metals used in coils are copper and aluminum
Some coils may be made of a combination of copper and aluminum for better heat transfer
Other metals like steel may also be used in some cases
The copper pipe between indoor and outdoor units is covered by foam and white roll for insulation and protection against external elements.
The foam provides insulation to prevent heat loss or gain during the refrigerant transfer process
The white roll acts as a protective layer to shield the copper pipe from external damage such as UV rays, moisture, and physical impact
The insulation and protection help maintain the eff
Using two adjustable spanners to tighten a flare nut in a union can lead to it loosening due to uneven pressure distribution.
Using two adjustable spanners can result in uneven pressure being applied to the flare nut
This can cause the flare nut to become loose over time
It is recommended to use a proper flare nut wrench for tightening flare nuts in unions
The AC may be cut off due to various reasons such as power outage, malfunctioning components, or scheduled maintenance.
Power outage: AC will be cut off if there is a power outage in the building.
Malfunctioning components: If any part of the AC system malfunctions, it may be cut off to prevent further damage.
Scheduled maintenance: AC may be cut off temporarily for routine maintenance to ensure optimal performance.
The tools used in One AC installation include screwdrivers, pliers, wire strippers, and a multimeter.
Screwdrivers are used to tighten or loosen screws during installation.
Pliers are used for gripping and bending wires or components.
Wire strippers are used to remove insulation from wires.
A multimeter is used to measure voltage, current, and resistance in the AC system.
Types of AC include window AC, split AC, central AC, portable AC, and ductless mini-split AC.
Window AC: typically installed in a window and cools a single room
Split AC: consists of two units - one indoor and one outdoor - connected by refrigerant lines
Central AC: cools the entire house through a system of ducts
Portable AC: can be moved from room to room and does not require installation
Ductless Mini-Split AC: similar t
Vaccuuming the AC indoor helps remove dust, dirt, and debris that can accumulate and block airflow, leading to inefficient cooling and potential damage to the system.
Vaccuuming helps improve the efficiency of the AC system by ensuring proper airflow.
It helps prevent blockages caused by dust and debris, which can lead to overheating and system malfunctions.
Regular vaccuuming can prolong the lifespan of the AC unit and r...
Coils are often used in gas leaks to detect the presence of gas due to their sensitivity to changes in electrical resistance.
Coils are commonly used in gas leak detectors because they can detect changes in electrical resistance caused by the presence of gas
The coil is typically part of a sensor that is designed to trigger an alarm or signal when a gas leak is detected
The coil may be connected to a circuit that measures...
I applied via Recruitment Consulltant and was interviewed in Jun 2024. There was 1 interview round.
Ask about basic maths
Daikin interview questions for popular designations
Get interview-ready with Top Daikin Interview Questions
Time study is a method used to determine the time required to perform a specific task or activity.
Time study involves observing and timing each step of a process to calculate the total time needed.
It helps in identifying inefficiencies, improving productivity, and setting realistic production goals.
Time study can be conducted using various techniques such as direct observation, work sampling, or predetermined motion ti...
My KPI as an Assembly Engineer is to ensure efficient assembly processes, high-quality output, and meeting production targets.
Ensuring efficient assembly processes by optimizing workflow and minimizing downtime
Maintaining high-quality output by implementing quality control measures and conducting regular inspections
Meeting production targets by monitoring productivity, identifying bottlenecks, and implementing improvem...
posted on 5 Jun 2024
I applied via Referral and was interviewed in May 2024. There was 1 interview round.
Replace the condensing fan motor with a new one to fix the issue.
Disconnect power to the unit before starting any work.
Remove the old condensing fan motor by unscrewing it from the unit.
Install the new condensing fan motor by securely screwing it in place.
Reconnect power and test the unit to ensure the fan motor is working properly.
I applied via Campus Placement and was interviewed in Feb 2024. There was 1 interview round.
The liquid in use in a battery is typically an electrolyte solution.
The most common liquid used in batteries is sulfuric acid.
Other types of batteries may use different electrolyte solutions, such as lithium-ion batteries using lithium salts in organic solvents.
The electrolyte solution allows for the flow of ions between the battery's electrodes, facilitating the chemical reactions that generate electrical energy.
I applied via Company Website
I applied via Walk-in and was interviewed in Mar 2024. There was 1 interview round.
Tollresn is not a recognized term in the field of electrician work.
Tollresn does not appear to be a relevant term in the context of electrician work.
It is possible that the interviewer may have misspoken or meant to ask a different question.
If unsure, it is best to ask for clarification or further information.
Top trending discussions
Some of the top questions asked at the Daikin interview -
The duration of Daikin interview process can vary, but typically it takes about less than 2 weeks to complete.
based on 218 interviews
Interview experience
based on 1.5k reviews
Rating in categories
Junior Engineer
936
salaries
| ₹2.4 L/yr - ₹4.7 L/yr |
Assistant Engineer
331
salaries
| ₹3.2 L/yr - ₹7.3 L/yr |
Diploma Trainee Engineer
223
salaries
| ₹1.8 L/yr - ₹3.2 L/yr |
Engineer
217
salaries
| ₹3 L/yr - ₹8.7 L/yr |
Assistant Manager
176
salaries
| ₹7 L/yr - ₹18 L/yr |
Blue Star
Voltas
Carrier
LG Electronics