Filter interviews by
I applied via Campus Placement and was interviewed in Apr 2021. There were 4 interview rounds.
Refrigeration cycle involves four thermodynamic processes: compression, condensation, expansion, and evaporation.
The refrigerant is compressed by a compressor, increasing its temperature and pressure.
The high-pressure refrigerant then flows through a condenser, where it releases heat and condenses into a liquid.
The liquid refrigerant then passes through an expansion valve, where it undergoes a pressure drop and becomes...
The functions of parts of an Air Conditioner include cooling, dehumidifying, filtering, and circulating air.
Compressor: compresses and circulates refrigerant to cool the air
Condenser: releases heat from the refrigerant to the outside air
Evaporator: absorbs heat from the air and cools it down
Expansion valve: regulates the flow of refrigerant into the evaporator
Fan: circulates the air over the evaporator and condenser co...
I applied via Campus Placement and was interviewed in Feb 2021. There was 1 interview round.
A scroll chiller uses a different type of compressor than a regular chiller.
Scroll compressors have fewer moving parts than reciprocating compressors
Scroll compressors are quieter and more efficient than reciprocating compressors
Scroll chillers are typically used for smaller applications, while regular chillers are used for larger applications
Heat exchangers are devices used to transfer heat between two or more fluids.
Heat exchangers come in various types such as shell and tube, plate and frame, and spiral
They are used in various industries such as HVAC, chemical, and power generation
Heat exchangers can be distinguished based on their design, material, and application
Designing an air conditioning system for a large space requires careful consideration of factors such as size, layout, insulation, and ventilation.
Calculate the cooling load based on the size of the space, number of occupants, and equipment used
Choose the appropriate type of air conditioning system, such as central or split system
Ensure proper insulation and ventilation to prevent energy loss and maintain air quality
Co...
I applied via Naukri.com and was interviewed before Dec 2021. There were 2 interview rounds.
Channel management involves managing relationships with intermediaries to ensure effective distribution of products/services.
Identifying and selecting appropriate channel partners
Training and motivating channel partners
Managing inventory and logistics
Establishing pricing and policies
Monitoring and evaluating channel performance
Examples: wholesalers, retailers, agents, distributors, franchisees
Building a strong distribution network requires identifying potential partners, establishing clear communication channels, and providing incentives for performance.
Identify potential partners based on their reach, reputation, and ability to meet demand.
Establish clear communication channels to ensure timely delivery and feedback.
Provide incentives for performance, such as bonuses or exclusive access to new products.
Reg...
I applied via Campus Placement and was interviewed before Dec 2021. There were 4 interview rounds.
Ask about previous qualification and family background
Daikin interview questions for popular designations
Get interview-ready with Top Daikin Interview Questions
I applied via campus placement at Anna University and was interviewed in Dec 2020. There were 9 interview rounds.
Yes, I have experience in team handling.
I have successfully led a team of 10 members in my previous role.
I have experience in assigning tasks, setting goals, and monitoring progress.
I believe in effective communication and fostering a positive team environment.
I have conducted regular team meetings to address any issues and provide guidance.
I have also provided coaching and mentoring to team members to enhance their sk
Yes, I am willing to relocate for the Team Leader position.
I am open to moving to a new location for career growth and opportunities.
I understand that relocation may be necessary to effectively lead and manage a team.
I am flexible and adaptable to new environments and cultures.
I have previous experience relocating for work and have successfully integrated into new teams.
I applied via Campus Placement and was interviewed before Aug 2021. There were 4 interview rounds.
30 questions related aptitude and core branch.
4 or 5 panel members are sitting in front of me and asked question one by one
Heat load calculation is done by determining the amount of heat energy required to maintain a desired temperature in a given space.
Determine the size of the space in square feet
Determine the desired temperature for the space
Determine the insulation value of the walls, ceiling, and floor
Determine the number of windows and doors and their insulation value
Calculate the heat loss through the walls, ceiling, floor, windows,...
FCU stands for Fan Coil Unit. There are two types of FCU - Horizontal and Vertical.
Horizontal FCU: mounted on the ceiling or floor, air is discharged horizontally
Vertical FCU: mounted on the wall, air is discharged vertically
Other types include cassette FCU, concealed FCU, and floor-standing FCU
FCUs are used for heating, cooling, and ventilation in buildings
VRV system is a type of HVAC system that uses a single outdoor unit to control multiple indoor units.
VRV stands for Variable Refrigerant Volume
It uses a refrigerant to transfer heat between the indoor and outdoor units
Each indoor unit can be controlled independently for temperature and air flow
It is energy efficient and can save on utility costs
Examples of VRV system brands include Daikin, Mitsubishi, and LG
I applied via Company Website and was interviewed in Jan 2021. There was 1 interview round.
Top trending discussions
Interview experience
based on 1.4k reviews
Rating in categories
Junior Engineer
919
salaries
| ₹2.4 L/yr - ₹4.7 L/yr |
Assistant Engineer
351
salaries
| ₹3 L/yr - ₹7.7 L/yr |
Engineer
230
salaries
| ₹3 L/yr - ₹8.3 L/yr |
Assistant Manager
189
salaries
| ₹7 L/yr - ₹17 L/yr |
Diploma Trainee Engineer
188
salaries
| ₹1.8 L/yr - ₹3 L/yr |
Blue Star
Voltas
Carrier
LG Electronics