Project planning process involves defining project scope, creating a schedule, allocating resources, and monitoring progress.
Define project scope and objectives
Create a project schedule with milestones and deadlines
Allocate resources such as budget, manpower, and materials
Monitor progress and make adjustments as needed
Communicate with stakeholders regularly
I applied via Company Website and was interviewed in Dec 2023. There was 1 interview round.
A transformer is an electrical device that transfers electrical energy between two or more circuits through electromagnetic induction.
Transformers work on the principle of electromagnetic induction
They consist of two coils of wire, known as the primary and secondary windings
The primary winding is connected to the input voltage source, while the secondary winding is connected to the output load
The transformer changes th...
A resistor is an electronic component that resists the flow of electrical current.
Resistors are used to control the amount of current flowing in a circuit.
The resistance of a resistor is measured in ohms (Ω).
One way to measure a resistor without a multimeter is by using a simple circuit with a known voltage source and an ammeter to measure the current flowing through the resistor.
Another method is to use a resistor col...
I applied via Company Website and was interviewed before Jan 2023. There were 2 interview rounds.
Free float is the amount of time a task can be delayed without affecting the project's critical path. Total float is the total amount of time a task can be delayed without delaying the project's completion.
Free float is specific to an individual task, while total float is applicable to the entire project.
Free float is calculated by subtracting the early start date of a task from the early finish date of its successor t...
Critical path is the longest sequence of activities in a project that determines the project's overall duration.
Critical path consists of activities that have zero slack or float time.
Any delay in activities on the critical path will directly impact the project's completion time.
Activities on the critical path must be closely monitored and managed to ensure timely project completion.
Critical path analysis helps in iden...
Look ahead is a planning technique to anticipate future activities. In P6, the 1-month look ahead can be found using filters and layouts.
Look ahead is a proactive planning approach to identify and prepare for upcoming activities.
In P6, the 1-month look ahead can be created by applying filters and layouts to the project schedule.
Filters can be set to display activities that are scheduled within the next month.
Layouts ca...
Global change refers to the long-term alterations in the Earth's systems and processes due to human activities and natural factors.
Global change encompasses various interconnected phenomena such as climate change, biodiversity loss, deforestation, and pollution.
It involves both anthropogenic (human-induced) factors like greenhouse gas emissions and natural factors like volcanic eruptions.
Global change has wide-ranging ...
The productivity rate of a welder refers to the amount of work they can complete in a given time period.
Productivity rate is measured in units of work per hour or per day.
Factors that can affect a welder's productivity rate include their skill level, the complexity of the welding task, and the availability of necessary equipment.
For example, an experienced welder may have a higher productivity rate than a novice welder...
Asked to prepare a schedule of a building
posted on 5 Apr 2024
posted on 5 Feb 2023
I applied via Referral and was interviewed in Jan 2023. There were 2 interview rounds.
I have a Bachelor's degree in Civil Engineering and a Master's degree in Construction Management.
Bachelor's degree in Civil Engineering
Master's degree in Construction Management
Experience in planning and scheduling
Proficient in using planning software such as Primavera P6
Strong analytical and problem-solving skills
I have 5 years of experience in planning and billing engineering.
I worked for XYZ Company for 3 years as a Planning Engineer.
Then I joined ABC Company as a Billing Engineer and worked there for 2 years.
During my tenure, I gained expertise in project planning, cost estimation, and budgeting.
I also have experience in using various software tools like Primavera, MS Project, and SAP.
I have successfully completed several pr
I have 7.5 years of experience in Planning & Billing Engineering.
During my 7.5 years of experience, I have gained expertise in project planning, scheduling, and cost estimation.
I have worked on various projects, including construction, infrastructure, and industrial projects.
I have experience in using software such as Primavera P6, MS Project, and Excel for project planning and scheduling.
I have also worked on project ...
posted on 10 Feb 2023
I applied via Approached by Company and was interviewed in Aug 2022. There were 2 interview rounds.
The code of fabrication and installation involves a sequence of steps from fabrication to dispatch and erection at the site.
The code of fabrication and installation outlines the standards and procedures for the entire process.
The fabrication sequence involves cutting, welding, and assembling the components according to the design specifications.
The final dispatch involves packaging and transportation of the fabricated ...
posted on 25 Aug 2022
I applied via Naukri.com and was interviewed before Aug 2021. There were 3 interview rounds.
Portals are used in OHE for easy access to information, different types of portals are used, guy rod consists of various parts, and different types of relationships are used in project planning.
Portals are used in OHE for easy access to information and communication among team members.
Types of portals used in OHE include project management portals, document sharing portals, and collaboration portals.
Parts of a guy rod ...
Different types of foundations, parts of Bracket Assembly, and types of insulators used in OHE.
Types of foundations used in OHE: Direct Embedment, Pile Foundation, Raft Foundation, etc.
Parts of Bracket Assembly: Bracket, Insulator, Clamp, Bolts, Nuts, etc.
Types of insulators used in OHE: Pin Type Insulator, Suspension Type Insulator, Strain Type Insulator, etc.
Anticreep is a feature in gas turbines that prevents the rotor from creeping during shutdown.
Prevents rotor from moving slowly during shutdown
Helps maintain proper alignment of components
Reduces wear and tear on turbine parts
Improves overall efficiency and performance of the turbine
Regulating equipment is used to control the flow, pressure, or temperature of a system to maintain desired conditions.
Regulating equipment includes valves, regulators, controllers, and sensors.
The purpose of regulating equipment is to ensure that the system operates within specified parameters.
For example, a pressure regulator is used to maintain a constant pressure in a gas pipeline.
Another example is a thermostat tha
The size of Contact and Catenary wire varies depending on the specific application and requirements.
Contact wire typically ranges from 10 mm to 14 mm in diameter
Catenary wire can range from 7 mm to 12 mm in diameter
The size of the wire is determined by factors such as the weight it needs to support and the amount of current it needs to carry
Bonding is the process of creating a strong emotional connection between individuals, often through shared experiences and mutual trust.
Bonding helps to build trust and loyalty among team members
It fosters collaboration and communication within a group
Bonding can improve morale and motivation in the workplace
Examples include team-building activities, group projects, and social events
I applied via Company Website and was interviewed in Jul 2021. There were 3 interview rounds.
Sales Manager
3
salaries
| ₹7 L/yr - ₹10.2 L/yr |
Thermax Limited
Cummins
Isgec Heavy Engineering
Sigma Electric Manufacturing Corporation