I applied via Naukri.com and was interviewed in Feb 2024. There was 1 interview round.
Critical path is the longest sequence of tasks in a project that must be completed on time in order for the project to finish on schedule.
Critical path determines the shortest possible duration for a project.
It helps in identifying which tasks are most crucial for the project timeline.
Any delay in tasks on the critical path will directly impact the project's completion date.
Activities on the critical path have zero flo...
Activities in engineering WBS are specific tasks or work packages that need to be completed to achieve project goals.
Breakdown of engineering design
Procurement of materials
Construction and installation
Testing and commissioning
Documentation and handover
Total float is the amount of time a schedule activity can be delayed without delaying the project completion date.
Total float is calculated by subtracting the early start date of an activity from its late start date.
Activities with total float can be delayed without affecting the project's critical path.
Total float is also known as slack or float.
It helps in identifying activities that have flexibility in their start a
Top trending discussions
WBS stands for Work Breakdown Structure, a hierarchical decomposition of project deliverables into smaller, manageable components.
WBS is a tool used in project management to organize and define the scope of a project
It breaks down the project into smaller, more manageable components
Each component is then assigned a unique identifier and can be further broken down into smaller components
WBS helps in estimating project c...
Progress payment is a payment made to a contractor based on the percentage of work completed.
Determine the percentage of work completed
Agree on the payment schedule with the contractor
Verify the work completed before making the payment
Ensure the payment is made on time to avoid delays
Keep accurate records of progress payments made
A contract for vendors should clearly define the scope of work, payment terms, delivery schedule, quality standards, and dispute resolution mechanisms.
Define the scope of work and deliverables
Specify the payment terms and schedule
Set quality standards and acceptance criteria
Include provisions for warranties and guarantees
Outline the dispute resolution mechanisms
Include clauses for termination and breach of contract
Ensu...
posted on 12 Jun 2022
I applied via Recruitment Consulltant
Basic Questions from Aptitude
WBS stands for Work Breakdown Structure, a hierarchical decomposition of project deliverables into smaller, manageable components.
WBS is a tool used in project management to organize and define the scope of a project
It breaks down the project into smaller, more manageable components
Each component is then assigned a unique identifier and can be further broken down into smaller components
WBS helps in estimating project c...
Progress payment is a payment made to a contractor based on the percentage of work completed.
Determine the percentage of work completed
Agree on the payment schedule with the contractor
Verify the work completed before making the payment
Ensure the payment is made on time to avoid delays
Keep accurate records of progress payments made
A contract for vendors should clearly define the scope of work, payment terms, delivery schedule, quality standards, and dispute resolution mechanisms.
Define the scope of work and deliverables
Specify the payment terms and schedule
Set quality standards and acceptance criteria
Include provisions for warranties and guarantees
Outline the dispute resolution mechanisms
Include clauses for termination and breach of contract
Ensu...
based on 1 review
Rating in categories
Graduate Engineer
25
salaries
| ₹4 L/yr - ₹5 L/yr |
Project Manager
11
salaries
| ₹6.3 L/yr - ₹18.5 L/yr |
Site Engineer
8
salaries
| ₹3 L/yr - ₹4.3 L/yr |
Service Engineer
8
salaries
| ₹2.8 L/yr - ₹6 L/yr |
Assistant Manager- HR
7
salaries
| ₹5.1 L/yr - ₹9.9 L/yr |
Suzlon Group
Tata Power
Adani Green Energy
Thermax Limited