QA focuses on preventing defects while QC focuses on identifying and fixing defects.
QA is a process-oriented approach that ensures quality is built into the product from the beginning
QC is a product-oriented approach that involves testing and inspecting the product to identify defects
QA is proactive while QC is reactive
QA involves continuous improvement while QC involves finding and fixing defects
Examples of QA activit...
I chose the QC department because of my passion for ensuring quality and my attention to detail.
I have always been meticulous and detail-oriented, which are essential qualities for a QC engineer.
I enjoy the process of identifying and resolving quality issues to improve overall product performance.
I find satisfaction in ensuring that products meet or exceed customer expectations.
I believe that quality control plays a cr...
I investigate the root cause, propose corrective actions, and ensure implementation to prevent recurrence.
Identify the root cause of the NCR
Propose corrective actions to prevent recurrence
Ensure implementation of corrective actions
Document the NCR and corrective actions taken
Communicate with relevant stakeholders
Soil and concrete strength testing involves several steps including sample collection, preparation, and testing.
Collect soil and concrete samples from the site
Prepare the samples for testing by drying and crushing them
Perform compression tests on concrete samples to determine strength
Perform triaxial or unconfined compression tests on soil samples to determine strength
Record and analyze the test results to ensure compl
To convince a client representative on a critical situation, it is important to communicate effectively, provide evidence and solutions, and build trust.
Listen actively to the client representative's concerns and understand their perspective.
Clearly explain the critical situation, its impact, and potential risks.
Present evidence such as test results, data analysis, or documentation to support your claims.
Offer alternat...
I applied via Campus Placement and was interviewed before Mar 2020. There were 4 interview rounds.
The question is unclear and lacks context.
Please provide more information about the 'update shuttering system'.
Specify the time frame for the updates.
Clarify the purpose or objective of the updates.
Provide any relevant examples or scenarios.
I want to work as an execution engineer because I enjoy the challenge of overseeing and coordinating all aspects of a project.
As an execution engineer, I would have the opportunity to work on a variety of projects and oversee all aspects of their execution.
I enjoy the challenge of coordinating different teams and ensuring that everything runs smoothly.
While working on a formwork or quality team would be valuable experi...
Concrete is the most important as it provides the strength and durability to the structure.
Concrete is the backbone of any RCC structure.
It provides the strength and durability to the structure.
Reinforcements and formwork are important too, but without concrete, they are useless.
Proper mix design and curing of concrete are crucial for the longevity of the structure.
I applied via Naukri.com and was interviewed in May 2021. There were 3 interview rounds.
I applied via Company Website and was interviewed before Apr 2020. There were 4 interview rounds.
Mix design of concrete and BTech project
Mix design involves determining the proportions of cement, water, aggregates, and admixtures to achieve desired properties of concrete
Factors like strength, workability, durability, and cost are considered while designing the mix
BTech project can involve studying the effect of different mix designs on properties of concrete or developing a new mix design
Examples of BTech projects...
I applied via Recruitment Consultant and was interviewed in Feb 2021. There were 3 interview rounds.
I applied via Job Portal and was interviewed in Oct 2020. There was 1 interview round.
I applied via Approached by Company and was interviewed in Feb 2023. There were 3 interview rounds.
I applied via Naukri.com and was interviewed in Jul 2023. There were 3 interview rounds.
BMD for sway frame is a diagram showing the variation of bending moment along the length of the frame.
BMD for sway frame will have a shape similar to a zigzag pattern due to the presence of sway in the frame.
The bending moment will be maximum at the points where the frame experiences maximum sway.
The BMD can be drawn by analyzing the internal forces and moments acting on the frame.
Drawing piperack elevations involves creating detailed drawings of the structure from different viewpoints.
Start by determining the dimensions and layout of the piperack
Use software like AutoCAD to create accurate and detailed drawings
Include all necessary details such as pipe sizes, supports, and connections
Label all components clearly for easy understanding
Review and revise the drawings as needed for accuracy
I applied via Company Website and was interviewed in Jun 2023. There were 3 interview rounds.
P6 is a project management software used for scheduling, Float is the amount of time an activity can be delayed without delaying the project, Critical activities are tasks that must be completed on time to prevent project delays.
P6 is a software used for project scheduling and management
Float is the amount of time an activity can be delayed without affecting the project deadline
Critical activities are tasks that have z...
based on 2 reviews
Rating in categories
HSE Officer
37
salaries
| ₹6 L/yr - ₹16 L/yr |
Safety Officer
15
salaries
| ₹4.3 L/yr - ₹15 L/yr |
Instrumentation Technician
13
salaries
| ₹3 L/yr - ₹10.6 L/yr |
Electrician
10
salaries
| ₹3 L/yr - ₹7 L/yr |
Piping Foreman
10
salaries
| ₹6.1 L/yr - ₹15 L/yr |