Upload Button Icon Add office photos

Consolidated Contractors

Compare button icon Compare button icon Compare

Filter interviews by

Consolidated Contractors Assistant Store Keeper Interview Questions and Answers

Updated 16 Jan 2022

Consolidated Contractors Assistant Store Keeper Interview Experiences

2 interviews found

I applied via Referral and was interviewed before Jan 2021. There was 1 interview round.

Interview Questionnaire 

5 Questions

  • Q1. Tell me something about yourself?
  • Q2. Tell me something about your last job?
  • Q3. Do you know Ms Office, Talisman, Maximo operating system of Warehouse?
  • Ans. 

    Yes, I am familiar with Ms Office, Talisman, and Maximo operating system of Warehouse.

    • I have used Ms Office for creating and managing documents, spreadsheets, and presentations.

    • I have experience in using Talisman for inventory management and tracking.

    • I have worked with Maximo operating system for warehouse management and maintenance.

    • I am comfortable with using these software and can quickly adapt to any new updates or

  • Answered by AI
  • Q4. What is your Salary Expectations?
  • Q5. Other questions asked related to past experiences!

Interview Preparation Tips

Interview preparation tips for other job seekers - Just be honest, speak the truth and before the interview summarize your last work experience thoroughly.

Skills evaluated in this interview

I applied via Recruitment Consultant and was interviewed before Jan 2021. There was 1 interview round.

Interview Questionnaire 

4 Questions

  • Q1. Where you have been working before
  • Ans. Ihave worked in a food service company in Afghanistan as assistant storekeeper
  • Answered by Rihan. M. Qureshi
  • Q2. For how many years
  • Q3. Are u able to take inventory
  • Q4. What is fifo
  • Ans. 

    FIFO stands for First In, First Out. It is a method of inventory management where the oldest items are sold or used first.

    • FIFO ensures that perishable or time-sensitive items are used before they expire.

    • It is commonly used in industries such as food, pharmaceuticals, and manufacturing.

    • For example, in a grocery store, the products with the earliest expiration dates are placed at the front of the shelves to be sold first

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Interview was good And i was been selected

Skills evaluated in this interview

Assistant Store Keeper Interview Questions Asked at Other Companies

Q1. What is the differences between Live Wedges & Master Wedges.. ... read more
Q2. What is the full from of ISMC, ISMB, ISA....?
Q3. Do you know Ms Office, Talisman, Maximo operating system of Wareh ... read more
Q4. What kind of buitmens?what density sand ?
Q5. How many grades in cement...?

Interview questions from similar companies

I applied via Naukri.com and was interviewed before Sep 2020. There was 1 interview round.

Interview Questionnaire 

3 Questions

  • Q1. About pipeline
  • Q2. Hydrotest procedure
  • Ans. 

    Hydrotest procedure is a process of testing the strength and integrity of a pressure vessel or pipeline by filling it with water and pressurizing it.

    • The vessel or pipeline is filled with water and pressurized to a specified level

    • The pressure is held for a specified amount of time to check for leaks or deformations

    • The test is usually performed before commissioning or after repairs

    • The test pressure and duration are deter...

  • Answered by AI
  • Q3. HDD procedure
  • Ans. 

    HDD procedure refers to the process of installing and configuring a hard disk drive in a computer system.

    • Ensure the HDD is compatible with the computer system

    • Physically install the HDD in the appropriate bay

    • Connect the necessary cables to the HDD and motherboard

    • Configure the HDD in the BIOS settings

    • Format the HDD and install the operating system

    • Test the HDD for proper functionality

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Basic of pipeline and brief knowledge required.

Skills evaluated in this interview

Interview experience
4
Good
Difficulty level
Moderate
Process Duration
2-4 weeks
Result
Selected Selected

I applied via Approached by Company and was interviewed in Jul 2024. There was 1 interview round.

Round 1 - Technical 

(2 Questions)

  • Q1. Major difference between Hrg and Lrg?
  • Ans. 

    HRG stands for Human Resource Group while LRG stands for Large Retail Group.

    • HRG focuses on managing human resources within an organization

    • LRG focuses on managing a large retail business

    • HRG deals with employee relations, recruitment, training, and development

    • LRG deals with sales, inventory management, customer service, and marketing

  • Answered by AI
  • Q2. How to perform transformer sizing
  • Ans. 

    Transformer sizing involves calculating the appropriate size of a transformer based on load requirements.

    • Determine the total load requirements in kVA

    • Consider the load factor and diversity factor

    • Calculate the transformer size based on the total load requirements

    • Ensure the transformer is rated for the appropriate voltage and frequency

    • Consult with a professional engineer if needed

  • Answered by AI
Interview experience
4
Good
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(3 Questions)

  • Q1. Tell me about yourself
  • Q2. What you do daily
  • Q3. What is your package
Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(4 Questions)

  • Q1. How to design floating head assembly From pds
  • Ans. 

    Designing a floating head assembly involves considering various factors such as material selection, sealing mechanisms, and thermal expansion.

    • Select appropriate materials for the floating head assembly based on the application requirements.

    • Design effective sealing mechanisms to prevent leakage and ensure proper functioning.

    • Consider thermal expansion and contraction to accommodate temperature variations.

    • Ensure proper al...

  • Answered by AI
  • Q2. H2s service for pressure vessel
  • Ans. 

    H2S service for pressure vessel refers to the use of hydrogen sulfide in a pressure vessel.

    • H2S service involves the handling and containment of hydrogen sulfide gas in a pressure vessel.

    • Pressure vessels used in H2S service must be designed and constructed to withstand the corrosive effects of hydrogen sulfide.

    • Special materials and coatings may be required to prevent hydrogen sulfide from corroding the pressure vessel.

    • R...

  • Answered by AI
  • Q3. Different types of gasket
  • Ans. 

    Gaskets are mechanical seals used to prevent leakage between two surfaces. There are various types of gaskets available.

    • Sheet gaskets

    • Spiral wound gaskets

    • Ring gaskets

    • Metallic gaskets

    • Rubber gaskets

    • Cork gaskets

    • Non-asbestos gaskets

  • Answered by AI
  • Q4. Kamprofile and SpWd as per Asme

Interview Preparation Tips

Interview preparation tips for other job seekers - 4 people taking interview in worley Parsons including Hod and department manager

Skills evaluated in this interview

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(1 Question)

  • Q1. Only design related queries
Round 3 - HR 

(1 Question)

  • Q1. Only salary package discussed

Interview Preparation Tips

Interview preparation tips for other job seekers - Just stick to basic and you can crack the interview
Interview experience
2
Poor
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I appeared for an interview in Sep 2024.

Round 1 - One-on-one 

(2 Questions)

  • Q1. About previous experience
  • Q2. Why i left all previous companies.
  • Ans. 

    I left previous companies to pursue growth opportunities, align with my career goals, and seek better work-life balance.

    • I left Company A after 3 years to seek a role that offered more leadership opportunities, as I wanted to develop my management skills.

    • At Company B, I transitioned to a new position that aligned better with my long-term career goals in project management.

    • I departed from Company C to find a work environ...

  • Answered by AI

I applied via Job Portal

Round 1 - One-on-one 

(1 Question)

  • Q1. Brief description on maintenance schedule.
  • Ans. 

    Maintenance schedule is a plan for regular upkeep of equipment or facilities to ensure their optimal performance.

    • Maintenance schedule includes regular inspections, cleaning, lubrication, and replacement of parts as needed.

    • It helps prevent breakdowns, prolongs equipment life, and reduces repair costs.

    • Examples of maintenance schedules include daily, weekly, monthly, and annual checklists.

    • Maintenance schedules should be t...

  • Answered by AI
Round 2 - Technical 

(1 Question)

  • Q1. Technical specifications regarding excavator.

Interview Preparation Tips

Interview preparation tips for other job seekers - Best wishes for their future endeavours.
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
2-4 weeks
Result
Selected Selected

I applied via Naukri.com and was interviewed before Jun 2023. There were 2 interview rounds.

Round 1 - HR 

(1 Question)

  • Q1. Reagarding work experiences & background.
Round 2 - Technical 

(4 Questions)

  • Q1. Related to technical aspects of projects executed.
  • Q2. Concrete mix designs
  • Q3. P&M productivity - Earth works
  • Q4. Customer relationship related

Interview Preparation Tips

Interview preparation tips for other job seekers - Be confident in your answers. See the scope and technical aspects of the experience claimed.

Consolidated Contractors Interview FAQs

What are the top questions asked in Consolidated Contractors Assistant Store Keeper interview?

Some of the top questions asked at the Consolidated Contractors Assistant Store Keeper interview -

  1. Do you know Ms Office, Talisman, Maximo operating system of Warehou...read more
  2. What is f...read more

Tell us how to improve this page.

Interview Questions from Similar Companies

L&T Construction Interview Questions
4.0
 • 758 Interviews
Saint-Gobain Interview Questions
4.0
 • 173 Interviews
AECOM Interview Questions
4.2
 • 118 Interviews
Worley Interview Questions
4.1
 • 113 Interviews
AtkinsRealis Interview Questions
3.9
 • 88 Interviews
Bechtel Interview Questions
4.0
 • 68 Interviews
Samsung E&A Interview Questions
4.0
 • 61 Interviews
View all

Consolidated Contractors Assistant Store Keeper Reviews and Ratings

based on 1 review

5.0/5

Rating in categories

4.0

Skill development

4.0

Work-life balance

4.0

Salary

3.0

Job security

4.0

Company culture

4.0

Promotions

4.0

Work satisfaction

Explore 1 Review and Rating
HSE Officer
37 salaries
unlock blur

₹6 L/yr - ₹16 L/yr

Safety Officer
15 salaries
unlock blur

₹4.3 L/yr - ₹15 L/yr

Instrumentation Technician
13 salaries
unlock blur

₹3 L/yr - ₹10.6 L/yr

Electrician
10 salaries
unlock blur

₹3 L/yr - ₹7 L/yr

Piping Foreman
10 salaries
unlock blur

₹6.1 L/yr - ₹15 L/yr

Explore more salaries
Compare Consolidated Contractors with

L&T Construction

4.0
Compare

Saint-Gobain

4.0
Compare

Worley

4.1
Compare

AECOM

4.2
Compare
Did you find this page helpful?
Yes No
write
Share an Interview